03.01.2013 Views

Pearl Rating System - Energimyndigheten

Pearl Rating System - Energimyndigheten

Pearl Rating System - Energimyndigheten

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Estidama and<br />

the <strong>Pearl</strong> <strong>Rating</strong> <strong>System</strong><br />

Heidi Brothers


Agenda<br />

� History of Estidama<br />

� Estidama Framework<br />

� Overview of the <strong>Pearl</strong> <strong>Rating</strong> <strong>System</strong>s<br />

� Near Future Plans


Electricity Peak Demand Forecasts for Abu Dhabi<br />

(in Gross MW)<br />

MW<br />

19,000<br />

6,000<br />

30000<br />

25000<br />

20000<br />

15000<br />

10000<br />

5000<br />

0<br />

2008<br />

2010<br />

Next 10 years<br />

2012<br />

2014<br />

2016<br />

5<br />

2018<br />

2020<br />

2022<br />

2024<br />

2026<br />

2028<br />

2030


610<br />

Water Peak Demand Forecasts for Abu Dhabi<br />

(in Gross MIGD)<br />

MIGD<br />

1,050<br />

1400<br />

1200<br />

1000<br />

800<br />

600<br />

400<br />

200<br />

0<br />

2008<br />

2010<br />

Next 10 years<br />

2012<br />

2014<br />

2016<br />

6<br />

2018<br />

2020<br />

2022<br />

2024<br />

2026<br />

2028<br />

2030


Key Stakeholders<br />

A program<br />

developed through a<br />

participatory<br />

approach in<br />

collaboration with<br />

other Government<br />

Agencies.<br />

EAD<br />

7<br />

Utilities<br />

The<br />

Estidama<br />

Team<br />

Urban<br />

Planning<br />

Council<br />

Department of<br />

Transport<br />

Municipalities


The Estidama<br />

Framework and<br />

Process<br />

8


The Four Pillars of Sustainability<br />

9


�<br />

�<br />

�<br />

�<br />

�<br />

�<br />

�<br />

Benefits of Estidama<br />

Achieve energy and water savings<br />

Increase return on investments<br />

Create healthier places to live, work,<br />

study and play<br />

Improve productivity, retail sales<br />

and student performance<br />

Attain greater tenant retention<br />

Enhanced reputation and<br />

marketability<br />

Receive recognition from the<br />

leadership of Abu Dhabi<br />

10


How is the PRS different?<br />

� Developed by the Government of Abu Dhabi<br />

� Upholds the cultural sustainability principle<br />

� Emphasis on integrated design from the start<br />

� Tailored for the region’s needs<br />

� Mandatory and Optional Credits<br />

11


Executive Council<br />

Order<br />

From September 2010, ALL<br />

projects must achieve 1<br />

<strong>Pearl</strong> <strong>Rating</strong><br />

12


The <strong>Pearl</strong> <strong>Rating</strong> <strong>System</strong>s<br />

13<br />

Villa<br />

Building<br />

Community


The <strong>Pearl</strong> <strong>Rating</strong> <strong>System</strong><br />

Easier Harder<br />

1<br />

Required<br />

2 3 4 5<br />

Optional Credits<br />

14


Cost Benefit Analysis: Overview<br />

Community <strong>Rating</strong><br />

Villa <strong>Rating</strong><br />

15<br />

Building <strong>Rating</strong><br />

The UPC has initiated and completed three<br />

independent studies to assess the commercial<br />

and life cycle implications of the introduction<br />

of the <strong>Pearl</strong> <strong>Rating</strong> <strong>System</strong>s


Cost Benefit Analysis: (% Increase over BaU Q3 2010)<br />

16


The UPC Planning Process<br />

Planning for<br />

Estidama<br />

Development<br />

Review<br />

Planning<br />

Approval<br />

Achieved<br />

The <strong>Pearl</strong> <strong>Rating</strong> <strong>System</strong> (PRS)<br />

Design<br />

<strong>Rating</strong><br />

Achieved<br />

Construction<br />

<strong>Rating</strong><br />

Achieved<br />

17<br />

Operational<br />

<strong>Rating</strong><br />

Achieved


<strong>Pearl</strong> Certification Process - Roles<br />

Government<br />

<strong>Pearl</strong><br />

Assessor<br />

Line of<br />

Communication<br />

Private<br />

Sector<br />

<strong>Pearl</strong><br />

Qualified<br />

Professional<br />

18<br />

Engineer<br />

Architect<br />

Contractor<br />

Owner


Overview of the<br />

<strong>Pearl</strong> <strong>Rating</strong> <strong>System</strong>s<br />

19


<strong>Pearl</strong> <strong>Rating</strong> <strong>System</strong> - Categories<br />

Natural<br />

<strong>System</strong>s<br />

Integrated<br />

Development<br />

Process<br />

Livable<br />

Villa/<br />

Building/<br />

Community<br />

Precious<br />

Water<br />

<strong>Pearl</strong> <strong>Rating</strong><br />

<strong>System</strong>s<br />

20<br />

Resourceful<br />

Energy<br />

Stewarding <strong>Pearl</strong><br />

Materials<br />

<strong>Rating</strong><br />

<strong>System</strong>s<br />

Innovating<br />

Practice


<strong>Pearl</strong> <strong>Rating</strong> <strong>System</strong> Credits<br />

• Required Credits: compliance<br />

required with no points earned<br />

• Optional Credits: targeted by<br />

design & development teams<br />

as relevant with points earned.<br />

IDP- R1<br />

SM- 4


�<br />

Integrated Development Process<br />

� Collaborative teamwork from the outset<br />

� Achieve goals on-time & on-budget<br />

� Successful integrated development<br />

�Promote management & ownership<br />

� Empower users<br />

�Improved construction quality<br />

22


�<br />

Natural <strong>System</strong>s<br />

�<br />

�<br />

�<br />

Protect plants, wildlife<br />

and habitats<br />

Enhance ecological value<br />

Restore/create habitats<br />

23


�<br />

�<br />

�<br />

�<br />

Livable Villa /<br />

Building /<br />

Community<br />

Improving the quality of<br />

human life outdoors &<br />

indoors<br />

Creating a sense of<br />

community and<br />

neighborhood connectivity<br />

Reducing the demand for the<br />

private car<br />

24


�<br />

Precious Water<br />

�<br />

�<br />

�<br />

Reduce indoor & outdoor water demand<br />

Reduce losses – monitoring<br />

Use alternative sources – onsite treatment<br />

& grey water<br />

25


�<br />

Precious Water<br />

Minimum Interior Water Use Reduction<br />

Building<br />

Water Monitoring<br />

Minimum Interior Water Use Reduction<br />

Exterior Water Monitoring<br />

Improved Interior Water Use Reduction<br />

Exterior Water Use Reduction: Landscaping<br />

Exterior Water Use Reduction: Heat Rejection<br />

Exterior Water Use Reduction: Water Features<br />

Water Monitoring & Leak Detection<br />

Stormwater Management<br />

26<br />

Total Credits<br />

Community: 8<br />

Building: 8<br />

Villa: 6<br />

PW-R1<br />

PW-R2<br />

PW-R1<br />

PW-R2<br />

PW-1<br />

PW-2.1<br />

PW-2.2<br />

PW-2.3<br />

PW-3<br />

PW-4


�<br />

�<br />

�<br />

�<br />

Resourceful Energy<br />

Reduce energy demand through passive design<br />

Improve efficiency (HVAC, lighting, appliances)<br />

Use renewable sources<br />

27


�<br />

�<br />

�<br />

�<br />

�<br />

�<br />

Stewarding Materials<br />

Materials reduction<br />

Sustainable materials sourcing<br />

Promote local economy<br />

Promote recycling industry<br />

Comprehensive waste management<br />

28


�<br />

�<br />

�<br />

Innovating Practice<br />

Showcase of cultural and regional design<br />

strategies<br />

Innovative solutions during design or<br />

construction<br />

29


What Next?<br />

30


Near Future Plans<br />

• New training contract for 2011<br />

• Continued Municipality Integration<br />

– Construction <strong>Rating</strong><br />

• Existing Building PRS<br />

• Operational Building PRS<br />

• Specialized applications<br />

– Mosques, hotels, schools<br />

– Industrial process loads, multiple buildings<br />

31


Questions &<br />

Answers?<br />

32


Our website provides detailed<br />

information on the <strong>Pearl</strong> <strong>Rating</strong><br />

<strong>System</strong>s.<br />

http://www.estidama.org/<br />

33

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!