Pearl Rating System - Energimyndigheten
Pearl Rating System - Energimyndigheten
Pearl Rating System - Energimyndigheten
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Estidama and<br />
the <strong>Pearl</strong> <strong>Rating</strong> <strong>System</strong><br />
Heidi Brothers
Agenda<br />
� History of Estidama<br />
� Estidama Framework<br />
� Overview of the <strong>Pearl</strong> <strong>Rating</strong> <strong>System</strong>s<br />
� Near Future Plans
Electricity Peak Demand Forecasts for Abu Dhabi<br />
(in Gross MW)<br />
MW<br />
19,000<br />
6,000<br />
30000<br />
25000<br />
20000<br />
15000<br />
10000<br />
5000<br />
0<br />
2008<br />
2010<br />
Next 10 years<br />
2012<br />
2014<br />
2016<br />
5<br />
2018<br />
2020<br />
2022<br />
2024<br />
2026<br />
2028<br />
2030
610<br />
Water Peak Demand Forecasts for Abu Dhabi<br />
(in Gross MIGD)<br />
MIGD<br />
1,050<br />
1400<br />
1200<br />
1000<br />
800<br />
600<br />
400<br />
200<br />
0<br />
2008<br />
2010<br />
Next 10 years<br />
2012<br />
2014<br />
2016<br />
6<br />
2018<br />
2020<br />
2022<br />
2024<br />
2026<br />
2028<br />
2030
Key Stakeholders<br />
A program<br />
developed through a<br />
participatory<br />
approach in<br />
collaboration with<br />
other Government<br />
Agencies.<br />
EAD<br />
7<br />
Utilities<br />
The<br />
Estidama<br />
Team<br />
Urban<br />
Planning<br />
Council<br />
Department of<br />
Transport<br />
Municipalities
The Estidama<br />
Framework and<br />
Process<br />
8
The Four Pillars of Sustainability<br />
9
�<br />
�<br />
�<br />
�<br />
�<br />
�<br />
�<br />
Benefits of Estidama<br />
Achieve energy and water savings<br />
Increase return on investments<br />
Create healthier places to live, work,<br />
study and play<br />
Improve productivity, retail sales<br />
and student performance<br />
Attain greater tenant retention<br />
Enhanced reputation and<br />
marketability<br />
Receive recognition from the<br />
leadership of Abu Dhabi<br />
10
How is the PRS different?<br />
� Developed by the Government of Abu Dhabi<br />
� Upholds the cultural sustainability principle<br />
� Emphasis on integrated design from the start<br />
� Tailored for the region’s needs<br />
� Mandatory and Optional Credits<br />
11
Executive Council<br />
Order<br />
From September 2010, ALL<br />
projects must achieve 1<br />
<strong>Pearl</strong> <strong>Rating</strong><br />
12
The <strong>Pearl</strong> <strong>Rating</strong> <strong>System</strong>s<br />
13<br />
Villa<br />
Building<br />
Community
The <strong>Pearl</strong> <strong>Rating</strong> <strong>System</strong><br />
Easier Harder<br />
1<br />
Required<br />
2 3 4 5<br />
Optional Credits<br />
14
Cost Benefit Analysis: Overview<br />
Community <strong>Rating</strong><br />
Villa <strong>Rating</strong><br />
15<br />
Building <strong>Rating</strong><br />
The UPC has initiated and completed three<br />
independent studies to assess the commercial<br />
and life cycle implications of the introduction<br />
of the <strong>Pearl</strong> <strong>Rating</strong> <strong>System</strong>s
Cost Benefit Analysis: (% Increase over BaU Q3 2010)<br />
16
The UPC Planning Process<br />
Planning for<br />
Estidama<br />
Development<br />
Review<br />
Planning<br />
Approval<br />
Achieved<br />
The <strong>Pearl</strong> <strong>Rating</strong> <strong>System</strong> (PRS)<br />
Design<br />
<strong>Rating</strong><br />
Achieved<br />
Construction<br />
<strong>Rating</strong><br />
Achieved<br />
17<br />
Operational<br />
<strong>Rating</strong><br />
Achieved
<strong>Pearl</strong> Certification Process - Roles<br />
Government<br />
<strong>Pearl</strong><br />
Assessor<br />
Line of<br />
Communication<br />
Private<br />
Sector<br />
<strong>Pearl</strong><br />
Qualified<br />
Professional<br />
18<br />
Engineer<br />
Architect<br />
Contractor<br />
Owner
Overview of the<br />
<strong>Pearl</strong> <strong>Rating</strong> <strong>System</strong>s<br />
19
<strong>Pearl</strong> <strong>Rating</strong> <strong>System</strong> - Categories<br />
Natural<br />
<strong>System</strong>s<br />
Integrated<br />
Development<br />
Process<br />
Livable<br />
Villa/<br />
Building/<br />
Community<br />
Precious<br />
Water<br />
<strong>Pearl</strong> <strong>Rating</strong><br />
<strong>System</strong>s<br />
20<br />
Resourceful<br />
Energy<br />
Stewarding <strong>Pearl</strong><br />
Materials<br />
<strong>Rating</strong><br />
<strong>System</strong>s<br />
Innovating<br />
Practice
<strong>Pearl</strong> <strong>Rating</strong> <strong>System</strong> Credits<br />
• Required Credits: compliance<br />
required with no points earned<br />
• Optional Credits: targeted by<br />
design & development teams<br />
as relevant with points earned.<br />
IDP- R1<br />
SM- 4
�<br />
Integrated Development Process<br />
� Collaborative teamwork from the outset<br />
� Achieve goals on-time & on-budget<br />
� Successful integrated development<br />
�Promote management & ownership<br />
� Empower users<br />
�Improved construction quality<br />
22
�<br />
Natural <strong>System</strong>s<br />
�<br />
�<br />
�<br />
Protect plants, wildlife<br />
and habitats<br />
Enhance ecological value<br />
Restore/create habitats<br />
23
�<br />
�<br />
�<br />
�<br />
Livable Villa /<br />
Building /<br />
Community<br />
Improving the quality of<br />
human life outdoors &<br />
indoors<br />
Creating a sense of<br />
community and<br />
neighborhood connectivity<br />
Reducing the demand for the<br />
private car<br />
24
�<br />
Precious Water<br />
�<br />
�<br />
�<br />
Reduce indoor & outdoor water demand<br />
Reduce losses – monitoring<br />
Use alternative sources – onsite treatment<br />
& grey water<br />
25
�<br />
Precious Water<br />
Minimum Interior Water Use Reduction<br />
Building<br />
Water Monitoring<br />
Minimum Interior Water Use Reduction<br />
Exterior Water Monitoring<br />
Improved Interior Water Use Reduction<br />
Exterior Water Use Reduction: Landscaping<br />
Exterior Water Use Reduction: Heat Rejection<br />
Exterior Water Use Reduction: Water Features<br />
Water Monitoring & Leak Detection<br />
Stormwater Management<br />
26<br />
Total Credits<br />
Community: 8<br />
Building: 8<br />
Villa: 6<br />
PW-R1<br />
PW-R2<br />
PW-R1<br />
PW-R2<br />
PW-1<br />
PW-2.1<br />
PW-2.2<br />
PW-2.3<br />
PW-3<br />
PW-4
�<br />
�<br />
�<br />
�<br />
Resourceful Energy<br />
Reduce energy demand through passive design<br />
Improve efficiency (HVAC, lighting, appliances)<br />
Use renewable sources<br />
27
�<br />
�<br />
�<br />
�<br />
�<br />
�<br />
Stewarding Materials<br />
Materials reduction<br />
Sustainable materials sourcing<br />
Promote local economy<br />
Promote recycling industry<br />
Comprehensive waste management<br />
28
�<br />
�<br />
�<br />
Innovating Practice<br />
Showcase of cultural and regional design<br />
strategies<br />
Innovative solutions during design or<br />
construction<br />
29
What Next?<br />
30
Near Future Plans<br />
• New training contract for 2011<br />
• Continued Municipality Integration<br />
– Construction <strong>Rating</strong><br />
• Existing Building PRS<br />
• Operational Building PRS<br />
• Specialized applications<br />
– Mosques, hotels, schools<br />
– Industrial process loads, multiple buildings<br />
31
Questions &<br />
Answers?<br />
32
Our website provides detailed<br />
information on the <strong>Pearl</strong> <strong>Rating</strong><br />
<strong>System</strong>s.<br />
http://www.estidama.org/<br />
33