Environmental Code of Practice for Aboveground and ... - CCME
Environmental Code of Practice for Aboveground and ... - CCME
Environmental Code of Practice for Aboveground and ... - CCME
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Table 6 - <strong>Aboveground</strong> Piping<br />
Final Installation In-service Periodic<br />
Containment Leak Detection Monitoring Leak Detection Leak Suspected<br />
All types PLMLDT; or HPVLDT VLD Not required PLMLDT; or HPVLDT<br />
Table 7 – Turbine, Transition <strong>and</strong> Dispenser Sumps<br />
Final Installation In-service Periodic<br />
Containment Leak Detection Monitoring Leak Detection Leak Suspected<br />
Dispenser Sumps SLMLDT HTSCM; or VLD Not required SLMLDT<br />
Turbine <strong>and</strong> SLMLDT VLD (annually) (1) transition sumps<br />
SLMLDT<br />
(1)In con<strong>for</strong>mance with Clause 8.4.1(4)(g)<br />
Table 8 - Existing Single-Wall Underground Storage Tanks<br />
Type In-service Periodic Leak<br />
Monitoring Leak Detection Suspected<br />
Steel without CP (1) IR; <strong>and</strong> OWM or SIR PLDT (annually) PLDT<br />
Steel with CP (1); IR PLDT (every 2 years)<br />
or FRP (2); IR; <strong>and</strong> OWM or SIR PLDT (every 5 years)<br />
ATG; or CITLDS Not required<br />
OWM <strong>and</strong> SIR Not required<br />
(1)CP - Cathodic protection<br />
(2)FRP - Fibreglass-rein<strong>for</strong>ced-plastic<br />
Table 9 – Existing Single-Wall Underground Piping<br />
Type In-service Periodic Leak<br />
Monitoring Leak Detection Suspected<br />
Steel without CP (1) IR; <strong>and</strong> OWM or SIR PLMDT; or HPVLDT (annually) PLMDT; or HPVLDT<br />
Steel with CP (1), IR; <strong>and</strong> OWM or SIR PLMDT; or HPVLDT (every 2 years)<br />
plastic, or FRP (2) CITLDS; or Not required<br />
OWM <strong>and</strong> SIR<br />
SVCV (3)<br />
; or ELLD (4) Not required<br />
(1)CP - Cathodic protection<br />
(2)FRP - Fibreglass rein<strong>for</strong>ced plastic<br />
(3)Suction style system only<br />
(4)Pressure Piping<br />
29 <strong>Environmental</strong> <strong>Code</strong> <strong>of</strong> <strong>Practice</strong> <strong>for</strong> <strong>Aboveground</strong> <strong>and</strong> Underground Storage Tank Systems Containing Petroleum <strong>and</strong> Allied Petroleum Products