Upstream Indonesia Other International<br />

Geothermal and Power<br />

Geothermal/Cogeneration The company operates the Darajat<br />

geothermal field located in a contract area in Garut, West Java,<br />

Indonesia. The field’s total capacity of 259 megawatts includes the<br />

Darajat III 110-megawatt unit that was placed online in July <strong>2007</strong>.<br />

An additional unit, Darajat IV, remains under evaluation, with an<br />

investment decision expected in 2009 after further study of the<br />

reservoir. Also in West Java, <strong>Chevron</strong> operates the Salak geothermal<br />

field in the Gunung Salak contract area. The field’s total<br />

capacity is 377 megawatts. A drilling program that began in 2006<br />

is scheduled to continue in a phased development through 2010 to<br />

optimize operations and meet the steam needs of the power plant<br />

and optimize the field. <strong>Chevron</strong> holds a 96 percent interest<br />

in Darajat and 100 percent interest in Salak.<br />

<strong>Chevron</strong> also has 95 percent operated interest in the<br />

North Duri Cogeneration Plant in Sumatra, supplying up to<br />

300 megawatts of electrical power to CPI as well as steam in<br />

support of CPI’s Duri steamflood project.<br />

<strong>Chevron</strong> Corporation <strong>2007</strong> <strong>Supplement</strong> to the <strong>Annual</strong> <strong>Report</strong><br />

Other International<br />

The “Other International” region is composed of Latin America,<br />

Canada and Europe.<br />

Argentina<br />

<strong>Chevron</strong> holds operated interests in 17 concessions and one<br />

exploratory block in the Neuquen and Austral basins. Working<br />

interests range from 18.8 percent to 100 percent. In addition,<br />

<strong>Chevron</strong> holds a 14 percent interest in Oleoductos del Valle S.A.<br />

pipeline, a major crude-oil pipeline from the Neuquen producing<br />

area to the Atlantic coast.<br />

�������������������<br />

������������<br />

�������� ����������<br />

������� ��������<br />

�������<br />

�������<br />

������ �����<br />

�������� ������ ��������������������������<br />

���������<br />

���������<br />

��������<br />

�������<br />

�����<br />

����������������<br />

���������<br />

������<br />

��������������������<br />

��������������������<br />

��������<br />

�����<br />

�����<br />

�������<br />

�����<br />

����������<br />

�������<br />

Production During <strong>2007</strong>, total daily production averaged 54,000<br />

barrels of crude oil and 62 million cubic feet of natural gas. The<br />

company’s net oil-equivalent production for the year was 47,000<br />

barrels per day. In <strong>2007</strong>, the company continued the development<br />

of El Trapial Field with sequential projects to reduce base-production<br />

declines. The first of these projects, the Porche Development<br />

Stage 1, was completed in September <strong>2007</strong>.