12.01.2013 Views

energizing innovation in integrated project delivery final report - SPUR

energizing innovation in integrated project delivery final report - SPUR

energizing innovation in integrated project delivery final report - SPUR

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

CM<br />

4%<br />

CM/GC<br />

20%<br />

Other<br />

18%<br />

Design-Build<br />

22%<br />

33<br />

Design-Bid-<br />

Build<br />

32%<br />

CM @ Risk<br />

4%<br />

Figure 6. Project Delivery Methods <strong>in</strong> which the Respond<strong>in</strong>g Firms Participate<br />

When asked specifically about the Design-Build team structure, the respondents’ firms which<br />

take part <strong>in</strong> Design-Build <strong>project</strong>s participate <strong>in</strong> a variety of forms (see Figure 7). The firms<br />

predom<strong>in</strong>antly either subcontract a portion of the work to another firm (28%) or perform both the<br />

design and build services with <strong>in</strong>ternal capabilities (23%).<br />

Jo<strong>in</strong>t<br />

venture/partners<br />

with another firm<br />

as the lead<br />

13%<br />

Jo<strong>in</strong>t<br />

venture/partners<br />

with your firm as<br />

the lead<br />

16%<br />

Subcontractor to<br />

another firm<br />

16%<br />

Other<br />

4%<br />

Perform both the<br />

design and build<br />

with <strong>in</strong>ternal<br />

capabilities<br />

23%<br />

Subcontract a<br />

portion of the work<br />

to another firm<br />

28%<br />

Figure 7. Design-Build Team Structure

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!