<strong>Peace</strong> <strong>Project</strong> <strong>Water</strong> <strong>Use</strong> <strong>Plan</strong><br />

Annual Report: 2010<br />

5 Summary of <strong>Peace</strong> WUP <strong>Project</strong>s<br />

This section outlines the status of each of the <strong>Peace</strong> WUP projects as of 30 June<br />

2010 (financial status is covered in Section 6, below). Each subsection describes one<br />

project and includes:<br />

� the project objective,<br />

� a description of the project,<br />

� the contractor and the executive summary or equivalent from its latest annual<br />

report, and<br />

� the current status of the project.<br />

Physical works are described first, in Section 5.1, followed by monitoring programs in<br />

Section 5.2.<br />

5.1 <strong>Peace</strong> WUP Physical Works <strong>Project</strong>s<br />

5.1.1 GMSWORKS#1 – <strong>Peace</strong> River Aerial Photos<br />

Order Clause: Schedule C clause 1<br />

<strong>BC</strong> <strong>Hydro</strong> <strong>Project</strong> Manager: Kim Hawkins<br />

5.1.1.1 Overview<br />

<strong>Project</strong> Objective: The objectives of this project are to:<br />

� Conduct a mapping inventory to organize a bibliography of all existing maps<br />

associated with the <strong>Peace</strong> River, and<br />

� In Years 1 and 9 of this project, acquire aerial photos of the <strong>Peace</strong> River between<br />

the <strong>Peace</strong> Canyon Dam and the confluence with the Pine River, at five different<br />

flows within normal operating range.<br />

<strong>Project</strong> Description: The <strong>Peace</strong> River Aerial Photos project supports physical works<br />

and monitoring programs within all of the <strong>Peace</strong> River management plans.<br />

Specifically, this project will provide spatial data to support the PSP and the PCR<br />

Flood Pulse, PCR Side Channel, and PCR Ramping <strong>Plan</strong>s.<br />

The project entails capturing photos, at a scale of 1:5000, at flows of approximately<br />

10K cfs, 20K cfs, 70K cfs and 2 additional flow rates between 20K and 70K cfs. At<br />

least one set of photos is to be taken when foliage is present to form the basis of<br />

vegetation maps. The photos are to be orthorectified and both digital and hard copies<br />

of the map files delivered. Completion of any aerial photography not taken in Years 1<br />

and 9 is to be conducted in Years 2 and 10. A status report will be completed after<br />

each year of work.<br />

Contractor: The mapping inventory work was conducted by Geomatics and<br />

Research. Aerial photography work is being conducted by Selkirk Remote Sensing<br />

Ltd., photogrammetrics scanning by Aero Geometrics Ltd. and aerial triangulation by<br />

<strong>BC</strong> <strong>Hydro</strong> Page 8