<strong>Peace</strong> <strong>Project</strong> <strong>Water</strong> <strong>Use</strong> <strong>Plan</strong><br />

Annual Report: 2010<br />

ToR have yet been submitted for those portions of the project relating to the forest<br />

products mills in Mackenzie.<br />

The status of those projects is described in Section 5, below.<br />

The WUP includes a number of “management plans”, each addressing a key area of<br />

concern for the WUP Committee. Many WUP projects are intended to address<br />

specific management plans. The management plans and the projects addressing<br />

them are:<br />

For Williston Reservoir:<br />

� The Riparian and Wetland Habitat Management <strong>Plan</strong>, addressed primarily by<br />

GMSWORKS#16 and 17, and GMSMON#15.<br />

� The Tributary Habitat Enhancement Management <strong>Plan</strong>, addressed primarily by<br />

GMSWORKS#19 and GMSMON#17.<br />

� The Dust Control Management <strong>Plan</strong>, addressed primarily by GMSWORKS#20<br />

and 21, and GMSMON#18.<br />

� The Erosion Management <strong>Plan</strong>, addressed primarily by GMSWORKS#23 and<br />

GMSMON#19.<br />

� The Williston Access, Navigation, and Safety <strong>Plan</strong>, addressed primarily by<br />

GMSWORKS#24 and GMSMON#20.<br />

� The Debris Management <strong>Plan</strong>, addressed primarily by GMSWORKS#18 and 22<br />

and GMSMON#16.<br />

� The <strong>Peace</strong>/Williston Marine Radio Communications and Improved Signage <strong>Plan</strong>,<br />

addressed primarily by GMSWORKS#26.<br />

For Dinosaur Reservoir, the Dinosaur Reservoir Management <strong>Plan</strong>, addressed<br />

primarily by GMSWORKS# 8, 9, and 12, and by GMSMON#14.<br />

For the <strong>Peace</strong> River:<br />

� The <strong>Peace</strong> Side Channel <strong>Plan</strong>, addressed primarily by GMSWORKS#3 and<br />

GMSMON#7.<br />

� The <strong>Peace</strong> Ramping <strong>Plan</strong>, addressed primarily by GMSWORKS#3 and<br />

GMSMON#7.<br />

� The <strong>Peace</strong> Flood Pulse <strong>Plan</strong>, addressed primarily by the <strong>Peace</strong> Spill Protocol<br />

(PSP), a collection of projects to be implemented in the event of a spill from the<br />

WAC Bennett or <strong>Peace</strong> Canyon Dams. The PSP includes GMSWORKS#2 and 7,<br />

and GMSMON#3, 4, 6, 7, 8, 9, 10, 11, 12, and 13.<br />

The remainder of the <strong>Peace</strong> WUP projects either support multiple management plans<br />

or do not address a specific management plan.<br />

The Order will be implemented until 2021, when the longest-running projects will end,<br />

except for ongoing maintenance on the GMSWORKS#26 marine communications<br />

system and any WUP boat ramps constructed.<br />

<strong>BC</strong> <strong>Hydro</strong> Page 4