Wahleach Project Water Use Plan Lower Jones Creek ... - BC Hydro
Wahleach Project Water Use Plan Lower Jones Creek ... - BC Hydro
Wahleach Project Water Use Plan Lower Jones Creek ... - BC Hydro
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
4<br />
3.8<br />
3.6<br />
3.4<br />
3.2<br />
3<br />
2.8<br />
2.6<br />
2.4<br />
2.2<br />
2<br />
1.8<br />
1.6<br />
1.4<br />
1.2<br />
1<br />
0.8<br />
0.6<br />
0.4<br />
0.2<br />
0<br />
Sept 12<br />
Sept 17<br />
Sept 22<br />
Sept 27<br />
Oct 1<br />
Oct 6<br />
Oct 8<br />
Oct 12<br />
<strong>Lower</strong> <strong>Jones</strong> <strong>Creek</strong> Fish Productivity Monitoring 2008-2009 16<br />
Oct 19<br />
Figure 5 <strong>Lower</strong> <strong>Jones</strong> <strong>Creek</strong> hydrograph for the spawning period. This chart shows the results of<br />
flow measurements limited to 4.0 cms and below to indicate target flows (1.1cms) through the<br />
spawning period (September 15 to November 30). Target flows are indicated by the dashed red<br />
line.<br />
4.4 Temperature Monitoring<br />
<strong>Water</strong> temperature is monitored throughout the year in <strong>Lower</strong> <strong>Jones</strong> <strong>Creek</strong>. Over the course of<br />
the active spawning period for chum (September 22 – November 18), mean daily temperature<br />
ranged from a high of 12.5C (September 22) to 5.0C (November 18). Figure 6 shows the daily<br />
max, min and mean temperature for the entire survey period. For chum salmon the average<br />
daily mean temperature during the spawning period was 7.8C (with a maximum of 12.5C and a<br />
minimum of 5.0C).<br />
Oct 22<br />
Oct 27<br />
Oct 30<br />
Nov 2<br />
Nov 9<br />
Nov 16<br />
Nov 18<br />
Nov 26<br />
Dec 5