1.6.03.03.26 reserved<br />

1.6.03.03.27 reserved<br />

1.6.03.03.28 reserved<br />

1.6.03.03.29 reserved<br />

1.6.03.03.30 reserved<br />

1.6.03.03.31 reserved<br />

1.6.03.03.32 reserved<br />

1.6.03.03.33 reserved<br />

1.6.03.03.34 XPP Controls System Integration Test<br />

This cell of the <strong>WBS</strong> identifies all required engineering, design, procurement, and fabrication<br />

and component installation efforts associated with the system integration effort and<br />

associated testing.<br />

1.6.04 Coherent X-ray Imaging Hutch 5 (FEH)<br />

This cell of the <strong>WBS</strong> is a summary of the engineering, design, procurement, and fabrication<br />

and component installation efforts associated with the CXI Hutch 5 (FEH).<br />

1.6.04.01 CXI H5 Requirements, Design, Setup<br />

This cell of the <strong>WBS</strong> identifies all required engineering, design, procurement, and fabrication<br />

and component installation efforts associated with deriving and documenting requirements<br />

for the CXI controls and data systems. Includes preparation for and holding the preliminary<br />

design review. Test setups to explore potential controller types are assembled and tested.<br />

Test software is developed.