This cell of the <strong>WBS</strong> identifies all required engineering, design, procurement, and fabrication<br />

and component installation efforts associated with the test setups to explore potential<br />

controller types are their assembly and testing. Test software is developed.<br />

1.6.05.02 XCS H4 Standard Hutch Controls<br />

This cell of the <strong>WBS</strong> identifies all required engineering, design, procurement, and fabrication<br />

and component installation efforts associated with experiment specific workstation, beam<br />

line processor, the channel access gateway, and the machine protection system.<br />

1.6.05.02.01 XCS H4 Cables & Racks<br />

This cell of the <strong>WBS</strong> identifies all required engineering, design, procurement, and fabrication<br />

and component installation efforts associated with the instruments specific racks and<br />

cabling. Essentially the hutch racks and cables. Includes installation of racks and cables.<br />

1.6.05.02.02 XCS H4 Workstation<br />

This cell of the <strong>WBS</strong> identifies all required engineering, design, procurement, and fabrication<br />

and component installation efforts associated with the workstations for the instrument<br />

control and monitoring.<br />

1.6.05.02.03 XCS H4 Beam Line Processor<br />

This cell of the <strong>WBS</strong> identifies all required engineering, design, procurement, and fabrication<br />

and component installation efforts associated with the exchange of 120-Hz beam line data.<br />

Includes VME crate and its IO controller CPU plus a timing system interface board.<br />

1.6.05.02.04 XCS H4 Channel Access Gateway<br />

This cell of the <strong>WBS</strong> identifies all required engineering, design, procurement, and fabrication<br />

and component installation efforts associated with the EPICS channel access gateway.<br />

Includes work-station to run channel access gateway software.