This cell of the <strong>WBS</strong> identifies all required engineering, design, procurement, and fabrication<br />
and component installation efforts associated with the exchange of 120-Hz beam line data.<br />
Includes VME crate and its IO controller CPU plus a timing system interface board.<br />
1.6.04.02.04 CXI H5 Channel Access Gateway<br />
This cell of the <strong>WBS</strong> identifies all required engineering, design, procurement, and fabrication<br />
and component installation efforts associated with the EPICS channel access gateway.<br />
Includes work-station to run channel access gateway software.<br />
1.6.04.02.05 CXI H5 MPS<br />
This cell of the <strong>WBS</strong> identifies all required engineering, design, procurement, and fabrication<br />
and component installation efforts associated with the interface to the XES common<br />
machine protection system. Includes purchase and installation of LCLS common link-nodes<br />
and switches.<br />
1.6.04.03 CXI H5 Specific Controls<br />
This cell of the <strong>WBS</strong> identifies all required engineering, design, procurement, and fabrication<br />
and component installation efforts associated with the individual section of the instrument to<br />
be controlled and read out.<br />
1.6.04.03.01 CXI H5 Data Acquisition (DAQ)<br />
This cell of the <strong>WBS</strong> identifies all required engineering, design, procurement, and fabrication<br />
and component installation efforts associated with the acquisition of data from the<br />
instrument. Included is the detector pixel read out specific to this instrument.<br />
1.6.04.03.02 CXI H5 DAQ Hutch Data Management<br />
This cell of the <strong>WBS</strong> identifies all required engineering, design, procurement, and fabrication<br />
and component installation efforts associated with the transport and management of the<br />
control and event data in the hutch.