23.01.2013 Views

PLI version Southport Seafront SPG - Sefton Council

PLI version Southport Seafront SPG - Sefton Council

PLI version Southport Seafront SPG - Sefton Council

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Southport</strong> <strong>Seafront</strong> – supplementary planning guidance – November 2003<br />

Objector/<br />

organisation Summary of comment<br />

the rear of their<br />

premises<br />

3. They are concerned<br />

that there is no mention<br />

of the closure of the<br />

highway to the side of<br />

their building – the area<br />

identified as possible<br />

expansion space for<br />

Funland<br />

Change<br />

to<br />

<strong>SPG</strong>?<br />

Summary of response<br />

by the <strong>Council</strong>, as is the Pier<br />

Forecourt itself. The future of<br />

the structure would need to be<br />

considered in conjunction with<br />

the Funland development<br />

proposals in consultation with<br />

SLG, other stakeholders and<br />

the public.<br />

2. Removal of rear deck: The<br />

reason for removing this deck<br />

is to complete the improvement<br />

of the lakeside promenade, as<br />

stated in the text. The<br />

‘development footprint’<br />

represented by the deck is<br />

replaced by the potential<br />

development areas for Funland<br />

identified in the <strong>SPG</strong>. The<br />

principle of such a development<br />

proposal has been discussed<br />

previously with SLG. Planning<br />

consent for expansion of<br />

Funland over the deck has<br />

recently been refused.<br />

Removal of the part of the deck<br />

shown on Fig 9a in the <strong>SPG</strong> is<br />

a core principle of proposals for<br />

this sire.<br />

3. Closure of highway: all the<br />

development proposals set out<br />

in the <strong>SPG</strong> will require detailed<br />

procedures to be carried out as<br />

part of implementation. It is not<br />

considered necessary to<br />

identify these in the <strong>SPG</strong>. SLG<br />

are correct in that the highway<br />

will need to be formally closed<br />

to allow development. It is<br />

understood the closure<br />

procedure will follow once the<br />

Marine Parade Bridge,<br />

currently under construction, is<br />

completed.<br />

44 of 44<br />

D:\Files\01_02_16_UDP_Revw_<strong>SPG</strong>s_Gen\01_02_16_18_<strong>SPG</strong>s_<strong>PLI</strong>_Version\<strong>PLI</strong> <strong>version</strong> <strong>Southport</strong> <strong>Seafront</strong> <strong>SPG</strong>.doc

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!