<strong>Southport</strong> <strong>Seafront</strong> – supplementary planning guidance – November 2003<br />
Objector/<br />
organisation Summary of comment<br />
the rear of their<br />
premises<br />
3. They are concerned<br />
that there is no mention<br />
of the closure of the<br />
highway to the side of<br />
their building – the area<br />
identified as possible<br />
expansion space for<br />
Funland<br />
Change<br />
to<br />
<strong>SPG</strong>?<br />
Summary of response<br />
by the <strong>Council</strong>, as is the Pier<br />
Forecourt itself. The future of<br />
the structure would need to be<br />
considered in conjunction with<br />
the Funland development<br />
proposals in consultation with<br />
SLG, other stakeholders and<br />
the public.<br />
2. Removal of rear deck: The<br />
reason for removing this deck<br />
is to complete the improvement<br />
of the lakeside promenade, as<br />
stated in the text. The<br />
‘development footprint’<br />
represented by the deck is<br />
replaced by the potential<br />
development areas for Funland<br />
identified in the <strong>SPG</strong>. The<br />
principle of such a development<br />
proposal has been discussed<br />
previously with SLG. Planning<br />
consent for expansion of<br />
Funland over the deck has<br />
recently been refused.<br />
Removal of the part of the deck<br />
shown on Fig 9a in the <strong>SPG</strong> is<br />
a core principle of proposals for<br />
this sire.<br />
3. Closure of highway: all the<br />
development proposals set out<br />
in the <strong>SPG</strong> will require detailed<br />
procedures to be carried out as<br />
part of implementation. It is not<br />
considered necessary to<br />
identify these in the <strong>SPG</strong>. SLG<br />
are correct in that the highway<br />
will need to be formally closed<br />
to allow development. It is<br />
understood the closure<br />
procedure will follow once the<br />
Marine Parade Bridge,<br />
currently under construction, is<br />
completed.<br />