Work Desc :<br />

15<br />

16<br />

SCOPE OF WORK TENDER NO :<br />

TENDER No : 72211-0<br />

Common shutdown jobs, Capital repair jobs and Maintenance <strong>of</strong> Heat<br />

Exchangers in Utilities Department <strong>of</strong> VISAKHAPATNAM <strong>Steel</strong> Plant<br />

After removing the molecular sieves, the mesh is to untied by removing the<br />

SS wires at the edges.<br />

The mesh, then, carefully rolled without folding, from one end and to be<br />

removed from the drier bottle.<br />

The mesh is to be placed at the location shown by VSP Engineer and<br />

the damages, if any are to be repaired.<br />

As decided by VSP engineer, either repaired (or) new mesh is to be fixed<br />

back. Supply <strong>of</strong> new mesh is in VSP <strong>scope</strong>.<br />

While filling the mesh, ensure that there are no foldings or damages to<br />

the mesh. The mesh are to be tied to the bed carefully by SS wire at the<br />

ends.<br />

2.8 Technological assistance for upkeep <strong>of</strong> Manual valves (15 NB to 200<br />

NB) (Item no.20 to 23 <strong>of</strong> BOQ)<br />

Removal <strong>of</strong> valves from position (valves are installed in different<br />

locations in ASU at different heights ranging from ground level up to<br />

height <strong>of</strong> 30 meters)<br />

Shifting <strong>of</strong> valve to maint. area, dismantling <strong>of</strong> valve, cleaning <strong>of</strong><br />

internals<br />

Replacement <strong>of</strong> packing, bonnet gaskets etc<br />

Lapping <strong>of</strong> valve seat if required<br />

Assembling back <strong>of</strong> valve & greasing <strong>of</strong> spindle wherever required<br />

Putting back the valve in position after changing the flange gaskets (new<br />

gaskets are to be cut & replaced)<br />

Leak checking<br />

2.9 Scope <strong>of</strong> <strong>work</strong> for strl./sheeting repair (item no 24 & 25 <strong>of</strong> BOQ)<br />

Contractor shall dismantle the damaged sheetings <strong>of</strong> the cold boxes <strong>of</strong> Air<br />

Separation Units and replace it with new ones. Contractor shall erect<br />

approach ladders, <strong>work</strong>ing platforms and walkways for safe operation and<br />

maint. <strong>of</strong> indifferent units <strong>of</strong> Utilities dept. Most <strong>of</strong> the structural &<br />

sheeting mainly consists <strong>of</strong> light structural (including GC sheets).<br />

Old structures shall be dismantled where ever necessary. All the welding<br />

joints and sheeting wherever necessary shall be painted immediately after<br />

repair. The painting shall be one coat <strong>of</strong> red oxide primer plus two<br />

finish coats <strong>of</strong> synthetic enamel. The entire <strong>work</strong> shall be done as per<br />

the instructions <strong>of</strong> Engineer-in-charge or his authorised representative.<br />

Contractor shall provide for adequate manpower to complete the job<br />

with a qualified supervisor. The job involves <strong>work</strong>ing at different<br />

heights ranging from +4.0m to +30.0m. The contractor shall make<br />

arrangements for necessary scaffoldings etc.<br />

2.10 Scope <strong>of</strong> <strong>work</strong> for piping replacement jobs(item nos: 26 to 31, 55 <strong>of</strong><br />

18 <strong>of</strong> 39 Signature <strong>of</strong> the Tenderer