B. Federal Lead-Based Paint Enforcement Bench Book - National ...
B. Federal Lead-Based Paint Enforcement Bench Book - National ...
B. Federal Lead-Based Paint Enforcement Bench Book - National ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
• Do not involve any prohibited work practices, 301 window replacement, or demolition. 302<br />
In calculating whether a project qualifies for this exception:<br />
• Non-emergency jobs in the same room within 30 days are a considered the same job 303 ; and<br />
• When removing painted components (e.g., baseboards or doors), the amount of surface area<br />
disturbed is the “entire surface area removed,” rather than merely the so-called “cut-line” around the<br />
perimeter of the component.<br />
301 o See 40 C.F.R. § 745.85(a)(3)(torching, paint removal via high speed operation, heat gun >1,100 F). See section III.F.4-5,<br />
below.<br />
302 40 C.F.R. § 745.83.<br />
303 40 C.F.R. § 745.83. The RRP Rule discourages “segmenting” larger jobs into smaller ones to come within the “minor”<br />
activities exemption.<br />
NATIONAL CENTER FOR HEALTHY HOUSING www.nchh.org 41