28.01.2013 Views

B. Federal Lead-Based Paint Enforcement Bench Book - National ...

B. Federal Lead-Based Paint Enforcement Bench Book - National ...

B. Federal Lead-Based Paint Enforcement Bench Book - National ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

• Do not involve any prohibited work practices, 301 window replacement, or demolition. 302<br />

In calculating whether a project qualifies for this exception:<br />

• Non-emergency jobs in the same room within 30 days are a considered the same job 303 ; and<br />

• When removing painted components (e.g., baseboards or doors), the amount of surface area<br />

disturbed is the “entire surface area removed,” rather than merely the so-called “cut-line” around the<br />

perimeter of the component.<br />

301 o See 40 C.F.R. § 745.85(a)(3)(torching, paint removal via high speed operation, heat gun >1,100 F). See section III.F.4-5,<br />

below.<br />

302 40 C.F.R. § 745.83.<br />

303 40 C.F.R. § 745.83. The RRP Rule discourages “segmenting” larger jobs into smaller ones to come within the “minor”<br />

activities exemption.<br />

NATIONAL CENTER FOR HEALTHY HOUSING www.nchh.org 41

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!