2<br />
28 November 2008<br />
Resource Consents Hearings Panel<br />
Minutes<br />
1489/11/08 APOLOGIES<br />
AGENDA ITEM NO. 1<br />
There were no apologies.<br />
1490/11/08 A NOTIFIED <strong>RESOURCE</strong> CONSENT APPLICATION UNDER SECTION<br />
88 OF THE <strong>RESOURCE</strong> MANAGEMENT ACT 1991<br />
AN APPLICATION FOR CONSENT TO CONSTRUCT AND OPERATE A<br />
NEW COMMERCIAL COMPLEX WITH ASSOCIATED PARKING<br />
SPACES, ONSITE DISPOSAL AND LANDSCAPING AT 1A TAPU<br />
ROAD, HUAPAI<br />
FILE REF L54342<br />
WARD Western<br />
AGENDA ITEM NO. 2<br />
FURTHER, THE APPLICANT REQUESTS THAT THE CONSENT BE<br />
GRANTED FOR A TEN YEAR PERIOD<br />
Address: 1A Tapu Road, Huapai<br />
APPLICANTS: REM DEVELOPMENTS LIMITED<br />
9.00 a.m. The applicant seeks consent to develop the site at 1A Tapu Road, Huapai to establish and<br />
operate commercial buildings on the property. The applicant proposes to undertake the work in two<br />
stages. The first stage involves the construction and use of a two storey commercial building in the<br />
south-western corner of the site adjacent to both Tapu Road and State Highway 16. This building will<br />
contain three shops, a GJ Gardner office and a café. Due to the inability to connect to the public<br />
wastewater system the development has been designed to dispose of all stormwater and wastewater<br />
on site for Stage 1. The second stage will entail construction and use of a second building located<br />
towards the eastern side of the site adjacent to State Highway 16. The two storey building will contain<br />
some 315m 2 of ground floor area at each level. It is proposed that Stage 2 will commence once a<br />
public wastewater system is available and Stage 1 has been connected to it.<br />
The applicant, Mr Ross Morley (REM Developments Ltd), and the applicant’s representatives, Mr<br />
Graham Parfitt (Planning Consultant), Mr Peter Eising (Architect - Pacific Environments) and his<br />
assistant Lutz Kreissler (Architect/Designer), Ms Sally Peake (Landscape Architect), Mr Joshua<br />
Hyland (Traffic Engineer), Ms Sarah Jones (Landscape Designer), Mr Duncan Elliott (Civil and<br />
Structural Engineer), and Mr Paul Riethmaier (Engineer and proprietor of Reflection Treatment<br />
Systems), present.<br />
None of the submitters attended the hearing.<br />
9.03 a.m. The Chairperson opened the hearing and outlined the meeting procedure.<br />
Mr Maddren of Maddren Property Limited had contacted a Resource Consent Administrator the<br />
previous day to request that his submission be considered by the Panel. He advised that he would not<br />
be attending the hearing, but that he had read the planner’s report and he considered the planner had<br />
covered his original concerns.