30.01.2013 Views

TESLA Brochure - ACFA Joint Linear Collider Physics and Detector ...

TESLA Brochure - ACFA Joint Linear Collider Physics and Detector ...

TESLA Brochure - ACFA Joint Linear Collider Physics and Detector ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Where Do We Go from Here?<br />

The Next Steps<br />

on the Way to <strong>TESLA</strong><br />

The next step is the construction of a pilot facility. This 300-meter-long<br />

superconducting linear accelerator with a free electron laser will be built<br />

on the DESY site. The aim of the pilot project is to demonstrate that the<br />

SASE principle (the principle behind the X-ray laser) also functions at<br />

wavelengths shorter than 100 nanometers—two orders of magnitude<br />

below the wavelengths achieved in previous tests.The pilot facility<br />

will go on display at DESY in Hamburg as part of the EXPO 2000 World<br />

Fair. As of 2003,numerous interested parties from the world of research will be<br />

able to use the facility.<br />

The experience gained during construction of the pilot facility will make it<br />

possible to draw up a detailed project plan for <strong>TESLA</strong>, which will then be submitted<br />

for evaluation <strong>and</strong> approval. DESY is convinced that the <strong>TESLA</strong> model is<br />

superior to other projects with similar aims <strong>and</strong> that it will prevail in the international<br />

research scene. In the event that the approval procedure—including<br />

the review by the German Scientific Council (Wissenschaftsrat),the public planning<br />

procedure for the construction <strong>and</strong> the international agreements—proceeds<br />

rapidly,tunneling work could begin in 2003.<br />

Allowing for a further six to eight years of construction time, the scientific<br />

community could have a new kind of research facility at its disposal by the year<br />

2010.The <strong>TESLA</strong> research center would then provide fertile ground for pioneering<br />

research in a broad range of fields—from the investigation of the origin<br />

<strong>and</strong> composition of matter to the fundamental principles of life itself.<br />

1 2<br />

The <strong>TESLA</strong> Research Center<br />

—up <strong>and</strong> running<br />

by 2010?<br />

1 Futuristic <strong>and</strong> multifunctional:<br />

DESY’s 1,200-square-meter “Light for the<br />

New Millennium”exhibition will be open<br />

to the public in this new hall from June 1<br />

to October 31,2000.As well as experiencing<br />

the fascination of research,visitors<br />

will be able to check out the tunnel where<br />

the X-ray laser will be assembled.After<br />

the EXPO,the new building will be converted<br />

into an experimental hall that will<br />

be available to researchers from 2003.<br />

2 A milestone on the way to <strong>TESLA</strong>:<br />

On March 19,1998,a state treaty providing<br />

the legal planning requirements for<br />

the construction <strong>and</strong> operation of <strong>TESLA</strong><br />

was signed by representatives of Hamburg<br />

<strong>and</strong> Schleswig-Holstein.<br />

27

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!