30.01.2013 Views

ALPMON FINAL REPORT - ARC systems research

ALPMON FINAL REPORT - ARC systems research

ALPMON FINAL REPORT - ARC systems research

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Contract ENV4-CT96-0359 <strong>ALPMON</strong><br />

27.11.97 Discussion of the Fuzzy avalanche model<br />

Participants: Dr. Schaffhauser, Austrian Institute for Avalanche and Torrent Research, Innsbruck<br />

Dr. Stefan, TU Berlin<br />

Dr. Randeu, Mag. Schmitt, Dipl. Ing. Paar, Mag. Granica, Dr. Schardt, JR<br />

Location: Joanneum Research<br />

27.10.1999 Discussion of preliminary results, further avalanche parameters, and possible<br />

improvements<br />

Participants: Dr. Höller, Dr. Schaffhauser, Institut für Lawinenforschung<br />

Mag. Schmitt, Dr. Schardt, JR<br />

Location: Austrian Institute for Avalanche and Torrent Research, Innsbruck<br />

24.3.2000 Discussion of the final results and the report<br />

Participants: Dr. Schaffhauser, Austrian Institute for Avalanche and Torrent Research, Innsbruck<br />

Mag. Schmitt, JR<br />

Location: Joanneum Research<br />

6.2.4 RSDE<br />

The following table summarises the customer meetings held by RSDE during the project.<br />

Meeting Contents<br />

Arabba, August 23 1997 Discussion about Customer requirements. Acquisition of climatic<br />

data, bibliographic references over the geomorphology of the<br />

Cordevole basin and appraisal of the previous erosion studies of<br />

the Customer.<br />

Milan, December 11-12 1997 <strong>ALPMON</strong> Meeting. The Customer illustrates his experience on<br />

solid transport control over the Rio Cordon.<br />

Bozen, November 25 1997 Relation on the state of the work (image pre-processing).<br />

Mestre, January 25 1998 Discussion of the architecture of the erosion model and design of<br />

the geological and vegetation survey.<br />

Arabba, August 3-14 1998 Geological and vegetation survey. The Customer gives<br />

permission of access to forest roads. Acquisition of auxiliary data<br />

(geomorphology, geology) from communes through the support<br />

of the Customer.<br />

Innsbruck, February 4-5 1999 <strong>ALPMON</strong> Customer Meeting. Presentation of the preliminary<br />

results of the classification.<br />

Venice, September 21 1999 Presentation of the final results of the classification and<br />

preliminary issues of the erosion risk model.<br />

Milan, December 17 1999 Presentation and evaluation of final results of the erosion risk<br />

model.<br />

6.2.5 WSL<br />

In the course of <strong>ALPMON</strong>, several meetings with the Swiss Customer (Swiss National Park) were held<br />

to inform about the actual status of the project, and discuss present classification results and further<br />

needs. The following meetings took place:<br />

JR, RSDE, ALU, LMU, Seibersdorf, WSL 102

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!