ALPMON FINAL REPORT - ARC systems research
ALPMON FINAL REPORT - ARC systems research
ALPMON FINAL REPORT - ARC systems research
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Contract ENV4-CT96-0359 <strong>ALPMON</strong><br />
27.11.97 Discussion of the Fuzzy avalanche model<br />
Participants: Dr. Schaffhauser, Austrian Institute for Avalanche and Torrent Research, Innsbruck<br />
Dr. Stefan, TU Berlin<br />
Dr. Randeu, Mag. Schmitt, Dipl. Ing. Paar, Mag. Granica, Dr. Schardt, JR<br />
Location: Joanneum Research<br />
27.10.1999 Discussion of preliminary results, further avalanche parameters, and possible<br />
improvements<br />
Participants: Dr. Höller, Dr. Schaffhauser, Institut für Lawinenforschung<br />
Mag. Schmitt, Dr. Schardt, JR<br />
Location: Austrian Institute for Avalanche and Torrent Research, Innsbruck<br />
24.3.2000 Discussion of the final results and the report<br />
Participants: Dr. Schaffhauser, Austrian Institute for Avalanche and Torrent Research, Innsbruck<br />
Mag. Schmitt, JR<br />
Location: Joanneum Research<br />
6.2.4 RSDE<br />
The following table summarises the customer meetings held by RSDE during the project.<br />
Meeting Contents<br />
Arabba, August 23 1997 Discussion about Customer requirements. Acquisition of climatic<br />
data, bibliographic references over the geomorphology of the<br />
Cordevole basin and appraisal of the previous erosion studies of<br />
the Customer.<br />
Milan, December 11-12 1997 <strong>ALPMON</strong> Meeting. The Customer illustrates his experience on<br />
solid transport control over the Rio Cordon.<br />
Bozen, November 25 1997 Relation on the state of the work (image pre-processing).<br />
Mestre, January 25 1998 Discussion of the architecture of the erosion model and design of<br />
the geological and vegetation survey.<br />
Arabba, August 3-14 1998 Geological and vegetation survey. The Customer gives<br />
permission of access to forest roads. Acquisition of auxiliary data<br />
(geomorphology, geology) from communes through the support<br />
of the Customer.<br />
Innsbruck, February 4-5 1999 <strong>ALPMON</strong> Customer Meeting. Presentation of the preliminary<br />
results of the classification.<br />
Venice, September 21 1999 Presentation of the final results of the classification and<br />
preliminary issues of the erosion risk model.<br />
Milan, December 17 1999 Presentation and evaluation of final results of the erosion risk<br />
model.<br />
6.2.5 WSL<br />
In the course of <strong>ALPMON</strong>, several meetings with the Swiss Customer (Swiss National Park) were held<br />
to inform about the actual status of the project, and discuss present classification results and further<br />
needs. The following meetings took place:<br />
JR, RSDE, ALU, LMU, Seibersdorf, WSL 102