Contract ENV4-CT96-0359 <strong>ALPMON</strong><br />
Annex 5: Resources Employed by Work Package (for the whole project period)<br />
The figures give approximate values, as the final project cost statements were not available for this calculation.<br />
JR RSDE ALU LMU SEIB WSL<br />
man hours EURO man hours EURO man hours EURO man hours EURO man hours EURO man hours EURO<br />
Personnel:<br />
WP 0: Project management 2.025,0 89260,33 480,0 11.762,98 301,0<br />
WP 1: Requirement study 472,5 21862,19 1.268,0 36928,76 640,00 16670,46 300,0 7.351,87 105,5 3.891,69 146,0 2.193,57<br />
WP 2: Interaction with CEO 75,0 3085,64 0,0<br />
WP 3: Set up and harmonisation 32,5 907,26 320,0 7.841,99 29,0<br />
WP 4: Collecting of ground info 960,0 27598,15 1.594,0 46424,73 520,00 13544,75 120,0 1.472,52 249,0 1.464,28<br />
WP 5: Geocoding of sat. data 525,0 13683,38 670 19519,49 550,00 14326,18 420,0 9.274,73 538,0 15.309,47<br />
WP 6: Topographic normalisation 180,0 4903,99 36 1055,11 240,00 6251,42 180,0 4.411,12 280,0 12.695,03 350,0 10.677,05<br />
WP 7: Atmospheric correction 74,0 2065,77 18 527,55 200,00 5209,52 200,0 4.901,24 129,0 3.935,26<br />
WP 8: Data preparation 99,0 2719,61 36 1055,11 336,00 8751,99 840,0 10.307,64 450,0 22.541,58 444,0 13.544,60<br />
WP 9: Classification 950,0 28942,33 1.378 40.379,07 164,00 4271,81 1.080,0 26.466,72 834,0 25.441,89<br />
WP 10: Verification 195,0 5924,62 1.004,0 29.137,77 192,50 5014,16 240,0 5.881,49 1.762,0 49.094,85<br />
WP 11: Data integration 109,6 3060,50 522,0 15.095,96 417,00 10861,85 520,0 10.877,12 162,0 4.527,56<br />
WP 12: Feasibility studies 2.200,0 66034,46 2.678,0 77.796,33 1860,50 48461,56 1.080,0 26.466,72 576,0 37.295,32 761,0 20.929,12<br />
Total personnel: 7.897,6 270.048,23 9.204,0 267.919,88 5.120,0 133.363,71 5.780,0 127.016,14 1.411,5 76.423,62 5.705,0 147.117,66<br />
Equipment<br />
Third party assistance 13.279,18 43.984,66<br />
Travel and subsistence 10.835,96 10089,33 9842,37 8.415,01 7.533,19 5.692,57<br />
Consumables and computing 8.071,67 25217,85 6507,72 4.927,97 3.435,83 67.983,49<br />
Other costs 2.543,55 0,00 12.101,87<br />
Overheads 233.720,99 66979,96 20286,17 30.397,44 57.625,66 34.296,60<br />
Total EURO: 538.499,58 370.207,02 169.999,97 226.843,09 145.018,30 255.090,31<br />
Remarks:<br />
The column "Man hours" includes all the work carried out for <strong>ALPMON</strong>, regardless of whether it is funded by the EU (for WSL, that means funded by the Swiss authorities).<br />
For WSL, the column "EURO" includes only those costs, which are funded by the EU.<br />
LMU * The calculation of EURO from man hours is based on the rate for different reimbursement categories from scientist, technical employee, scientific <strong>research</strong> helper, student <strong>research</strong> worker.<br />
The man hour costs may therefore differ between WPs, depending on the involvement of persons paid according to the respective categories.<br />
JR, RSDE, ALU, LMU, Seibersdorf, WSL 112