02.02.2013 Views

Operating Instructions Part 1 VCB - Bonfiglioli USA

Operating Instructions Part 1 VCB - Bonfiglioli USA

Operating Instructions Part 1 VCB - Bonfiglioli USA

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

!<br />

Installation of a drive system fulfilling EMC requirements:<br />

PE<br />

L1<br />

L2<br />

L3<br />

2<br />

Cable shields:<br />

F<br />

Construction size<br />

4 and 5:<br />

P1 06/05 4-4<br />

5<br />

4<br />

1<br />

E<br />

3<br />

9<br />

1<br />

A<br />

B<br />

C<br />

D<br />

7<br />

8<br />

10<br />

M<br />

3 ~<br />

Fasten control and power cable shields in or on device with the enclosed<br />

clips<br />

Also connect motor and power cable shields to the mounting plate<br />

near the device<br />

Position Cable definitions<br />

1<br />

Paint-free metallic mounting<br />

surface<br />

A Control cable<br />

NYSLYCYÖ – O<br />

2 Ground reference point B Reference value cable or<br />

3<br />

4<br />

PE-bar<br />

Choke<br />

C Encoder cable<br />

D PTC resistor monitoring<br />

LIYCY<br />

5 Mains filter E Drive cable e.g. Ölflex–100 CY<br />

6 Control unit F Power cable e.g. Ölflex–100 CY<br />

7 Digital control inputs<br />

8 Analogue inputs<br />

9 Motor PTC resistor monitoring<br />

10 Speed encoder<br />

6

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!