Operating Instructions Part 1 VCB - Bonfiglioli USA
Operating Instructions Part 1 VCB - Bonfiglioli USA
Operating Instructions Part 1 VCB - Bonfiglioli USA
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
!<br />
Explanations on the EMC safe installation of a drive system:<br />
11. If filters are fitted then the following points are to be observed: In general the<br />
leakage current increases through the use of filter elements. If this exceeds a<br />
limiting value of 3.5 mA then one of the following conditions must be fulfilled:<br />
• PE cross-section at least 10 mm²<br />
• Monitoring of the protective conductor by an appliance, which leads to an<br />
automatic switching off in the case of a defect.<br />
• Routing of a second cable, electric parallel to the PE via separate terminals.<br />
This must itself fulfil the requirements according to VDE 0100 <strong>Part</strong> 540 (e g<br />
minimum cross-section).<br />
12. In order to achieve as low a load as possible of the supply net in general line<br />
chokes with a short circuit voltage of 4% are used. The line choke is to be<br />
placed between mains connection and radio interference suppression filter.<br />
P1 06/05 4-6