!<br />

Explanations on the EMC safe installation of a drive system:<br />

11. If filters are fitted then the following points are to be observed: In general the<br />

leakage current increases through the use of filter elements. If this exceeds a<br />

limiting value of 3.5 mA then one of the following conditions must be fulfilled:<br />

• PE cross-section at least 10 mm²<br />

• Monitoring of the protective conductor by an appliance, which leads to an<br />

automatic switching off in the case of a defect.<br />

• Routing of a second cable, electric parallel to the PE via separate terminals.<br />

This must itself fulfil the requirements according to VDE 0100 <strong>Part</strong> 540 (e g<br />

minimum cross-section).<br />

12. In order to achieve as low a load as possible of the supply net in general line<br />

chokes with a short circuit voltage of 4% are used. The line choke is to be<br />

placed between mains connection and radio interference suppression filter.<br />

P1 06/05 4-6