Success Stories<br />
� Repair <strong>of</strong> the Over-Pressure Relief Device (OPRD)<br />
<strong>of</strong> Rajasthan Atomic <strong>Power</strong> Station unit-1 (RAPS-1)<br />
� Enmasse Coolant Channel Replacement (EMCCR)<br />
and Safety Upgradation was carried out for the first<br />
time in RAPS-2, totally with indigenous efforts.<br />
Subsequently, EMCCR was carried out in five more<br />
reactors - MAPS 1&2, NAPS 1&2 and KAPS-1.<br />
� Restoration <strong>of</strong> MAPS 1&2 to their original rating <strong>of</strong><br />
220 MW by innovative solution <strong>of</strong> spargers.<br />
� Enmasse Feeder Replcement (EMFR) carried out<br />
for the first time in the world in a PHWR at MAPS-1.<br />
Subsequently EMFR carried out at RAPS-2, NAPS<br />
1&2 and KAPS-1<br />
� Detection and successful Repair <strong>of</strong> leak in<br />
Calandria Vault <strong>of</strong> KAPS-1 (high radiation field area)<br />
carried out by indigenously developed remote tools<br />
& technology, in parallel with EMCCR & EMFR.<br />
� The complex task <strong>of</strong> core shroud inspection was<br />
carried out successfully for TAPS, with remote<br />
handling tools developed indigenously by DAE/<br />
<strong>NPCIL</strong>. These units are operating for more than 40<br />
years. Plant life extension works are being carried<br />
out progressively.<br />
Performance Highlights<br />
� During the year 2011-12, <strong>NPCIL</strong> achieved its<br />
highest ever generation <strong>of</strong> 32,455 Million Units <strong>of</strong><br />
electricity. The generation was 23% higher than<br />
that in 2010-11 (26473 MUs).<br />
� The nuclear power reactors under IAEA<br />
safeguards, for which imported fuel is available in<br />
the required quantity, operated with overall 97%<br />
capacity factor.<br />
� The overall Availability Factor <strong>of</strong> the reactors in<br />
operation continued to be high at 91% during the<br />
year.<br />
� Tarapur Atomic <strong>Power</strong> Station unit-3 (TAPS-3), 540<br />
MW Pressurized Heavy Water Reactor (PHWR),<br />
achieved a continuous operation for 522 days, thus<br />
joining the fleet <strong>of</strong> 9 nuclear power reactors which<br />
have earlier recorded continuous operation over<br />
one year.<br />
� During the year 2011-12, <strong>NPCIL</strong>’s Pr<strong>of</strong>it After<br />
Tax(PAT) was Rs. 1906 crore, 39% higher than the<br />
last year’s pr<strong>of</strong>it <strong>of</strong> Rs. 1376 crore in view <strong>of</strong> higher<br />
generation<br />
� A dividend <strong>of</strong> Rs. 572 crore for the year paid to the<br />
Govt. <strong>of</strong> <strong>India</strong><br />
� <strong>NPCIL</strong>'s instruments continued to be maintained at<br />
AAA rating<br />
� The safety record <strong>of</strong> <strong>NPCIL</strong> was maintained<br />
impeccable over 362 cumulative reactor-years <strong>of</strong><br />
safe, accident free operation<br />
� Three projects namely KKNPP - 1 & 2 (2 X 1000<br />
MW LWRs), KAPP - 3 & 4 ( 2X 700 MW PHWRs)<br />
and RAPP - 7 & 8 (2 X 700 MW PHWRs) are under<br />
various stages <strong>of</strong> construction and commissioning.<br />
KKNPP Unit - 1 have been made ready for fuel<br />
loading.<br />
� The Public outreach has been accorded a high<br />
priority and necessary organizational structures<br />
and mechanisms have been enhanced.<br />
� Pre-project activities like MoEF clearance, land<br />
acquisition, site infrastructure development works,<br />
etc. are in various stages <strong>of</strong> progress at green field<br />
sites in Haryana, Madhya Pradesh, Andhra<br />
Pradesh, Gujarat, Rajasthan and West Bengal.