12.07.2015 Views

Promoció Ciutat Vella, SA (PROCIVESA) Ejercicio 1994 Informe 04 ...

Promoció Ciutat Vella, SA (PROCIVESA) Ejercicio 1994 Informe 04 ...

Promoció Ciutat Vella, SA (PROCIVESA) Ejercicio 1994 Informe 04 ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

SINDICATURA DE CUENTAS DE CATALUÑA — INFORME <strong>04</strong>/95-A5.2. DETALLE DE LOS ACTIVOS POR CUENTA DEL AYUNTAMIENTO ANALIZADOS POR LA SINDICATURA: OBRA PÚBLICAFINCACARME,107PAS<strong>SA</strong>TGE BANYS,J/8 i MGINJOL,3PAS<strong>SA</strong>TGE PAU,3NOU ST.FRANCESC,16RAMBLES,28FERLANDINA,3PEU DE LA CREU,8/10FERLANDINA,5PEU DE LA CREU,4BISFERLANDINA,1PEU DE LA CREU,2TÀPIES,5/ESTELCARME,60PEU DE LA CREU,1JOAQUIM COSTA,6CARME,54/58PEU DE LA CREU,15PEU DE LA CREU,5CARME,50/52PEU DE LA CREU,9ST.JERÒNIM,7/ST.RAFAEL,23AURORA,5/ST.JERÒNIM,5<strong>SA</strong>NT PAU,74 TRIPREGOMIR,7/9CARDERS,42/VERMELL,2CARDERS,38/ALLADA,1VERMELL,6CARDERS,40JAUME GIRALT,40LLÀSTICS,20HOSPITAL,110/112CARME,85CARME,81RIERA BAIXA,21/23HOSPITAL,106HOSPITAL,100/102HOSPITAL,108CARME,77HOSPITAL,1<strong>04</strong><strong>SA</strong>NT OLEGUER,11MARQUÈS DE BARBERÀ,32VALLDONZELLA,16RIERA ALTA,11/15CARME,102BALBOA (PIZARRO),11GINEBRA,5BANYS ORIENTALSREC,41/PL. COMERCIAL,4FLAS<strong>SA</strong>DERS,40<strong>SA</strong>NT JOSEP ORIOL,1<strong>SA</strong>NT JOSEP ORIOL,3<strong>SA</strong>NT JOSEP ORIOL,5CARME,41CARME,43DURAN I BASCREMAT GRAN,10<strong>SA</strong>NTA ELENA,2TOTAL ANALIZADO<strong>SA</strong>LDO TOTALCOBERTURA% PORCENTAJE<strong>SA</strong>LDO30-11-9433.<strong>04</strong>6106.38257.43856.75543.26745.56849.996174.47450.32441.62138.54194.69879.07967.58677.99635.76136.48944.17353.49972.02244.98131.32055.51541.54<strong>04</strong>1.33818.74022.40117.15515.21215.81115.37951.22530.43729.710102.95056.61660.07259.81197.527131.13931.91223.32724.83548.44352.42247.88271.36558.00033.96223.36022.45012.17112.64865.15435.13828.39525.71063.7512.878.5194.859.74659,2100,0INDEMNI.22.50089.00998.96955.70942.19<strong>04</strong>5.16745.36237.83148.21030.80019.05078.51756.36962.87775.35334.81530.15<strong>04</strong>1.73742.95064.15642.52629.00051.30238.00039.75514.28419.0589.63312.41513.99812.10247.56225.14526.40097.61152.92858.06356.05296.950129.83225.09119.7005.62<strong>04</strong>4.43551.58637.50056.88058.00030.30521.15317.6007.3509.57556.06425.29020.24023.35055.2002.459.27685,4DERRIBOSI/NONOSISISISISISISI/CONST.SISISISISINONONOSINOSISISINOSINONOSISISISINOSINONONONONONONONONOSISISISINOSISISISINOSISISISISISINOSIDESGLOSE DEL COSTE Y SITUACIÓN FÍSICACOSTEDERRIBO013.7942.9902.0909.756(D)3.435(D)4.679(B)9.1036.170(B)7.6905.353(B)7.9<strong>04</strong>20.5480003.81207.7103.6941.13301.380002.6127.740(E)3.0511.22202.0560000000005.5222.84819.0263.06707.8618.75203.31803.8021.9431.7447.2578.5577.126<strong>04</strong>.768213.5137,4IMPUESTO1.7452.7024.456683003.6152.27002.20003821.3801.4111.505271341.5161.8851.4654481881.2932.20022625509513368406691482.9941.1092.4911.6221.0002.024136213380000721.2863.0650601.38501840622910201263.27056.7382,0OTROSGASTOS8.8018776.023(C)3631.0774011.019125.270(A)2.1149313.2897.8957823.2981.1389192.3939209542.7078742.1321.5401.3401.3571.8193.2933.5201.2399735523.5152.2982.2012.8482.0661.0091.7354411.0949197791899417641.2352.66802798221.<strong>04</strong>82.8609231.6<strong>04</strong>1.1891.0292.234513227.0137,9SITUACIÓN ACTUALFINCA (*)TRASL. VECINOSDERRIBADADERRIBADADERRIBADADERRIBADADERRIBADADERRIBADACONSTRUIDADERRIBADADERRIBADADERRIBADADERRIBADADERRIBADAVACÍAVACÍATRASL. VECINOSDERRIBADATRASL.VECINOSDERRIBADADERRIBADADERRIBADAVACÍADERRIBADATRÁMITE DERRIBOTRÁMITE DERRIBODERRIBADADERRIBADADERRIBADADERRIBADATRÁMITE DERRIBODERRIBADATRÁMITE DERRIBOTRASL.VECINOSTRASL. VECINOSVACÍATRASL.VECINOSTRASL.VECINOSTRASL.VECINOSVACÍATRASL.VECINOSDERRIBADADERRIBADADERRIBADADERRIBADAVACÍADERRIBADADERRIBADADERRIBADADERRIBADAEXPROPIACIÓNDERRIBADADERRIBADADERRIBADADERRIBADADERRIBADADERRIBADAVACÍADERRIBADADESTINOFINCAEQEPEPy EQHPHPyEPEPEPHPEPHPyEPEPHPyEPEQyEPHPEQyEPHPyEPEPHPyEPHPyEPEPHPyEPEPEPEPEQEPEPEPEPEPHPHPHPHPHPHPHPHPHPHPHPyEPHPyEPEPEPHPEQEQHPHPEQEPEPEPEPEPEPEPHP(IMPORTES EN MILES DE PESETAS)NOTA: La suma del desglose del coste no coincide en muchos casos con el saldo a 30 de noviembre de <strong>1994</strong>, porque se han incluido los importes totales de cada fincay el coste del derribo aunque sea del ejercicio 1995.EQ: EquipamientoEP: espacio públicoHP: Vivienda pública(*) Situación de la finca en la fecha de realización del trabajo de fiscalización, abril 95.(A) Esta finca fue edificada por PCV con un coste de 109,52 MPTA y una superficie construida de 1.826,97 m2, lo que significa un coste de construcción/m2 construidode 59.945 PTA y un coste total de 95.499 PTA/m2.(B) El coste de derribo de Ferlandina 3y5seimputó contablemente en Ferlandina, 1. En este cuadro se ha distribuido el coste de derribo entre las tres fincas deacuerdo con la información facilitada por el departamento de derribos de la Sociedad.(C) El coste total de esta finca fue de 112,44 MPTA: en el año 1993 se registró una baja de 55 MPTA por la cesión de una parte a la Universidad Pompeu Fabra.(D) Derribada en el ejercicio 1995.(E) Corresponde a parte del coste de derribo de la Illa Allada-Vermell-Carders, que contablemente se imputó en otra finca.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!