PROCEEDING PEMAPARAN HASIL-HASIL KEGIATAN LAPANGAN DAN NON LAPANGANTAHUN 2006, PUSAT SUMBER DAYA GEOLOGITabel 3 . Hasil analisa kima batubara daerah <strong>Long</strong> <strong>Daliq</strong>.NO.KODECONTOASRECEIVEDFM%TM%AS DETERMINED BASISM VM FC ASH% % % %St%SGGr/cm 3CVcal/grHGI1. LD-04 2,07 3,10 1,05 10,88 13,63 74,44 1,15 2,13 1829 632. LD-05 1,53 3,36 1,86 19,84 24,78 53,52 1,67 1,83 3436 723. LD-02 26,05 34,20 11,02 32,77 28,24 27,97 0,34 1,60 3925 984. LD-03 1,96 4,67 2,76 32,77 42,54 16,84 4,15 1,44 6403 545. LD-08A 27,42 34,96 10,39 43,45 43,99 2,17 0,39 1,41 5829 756. LD-24 36,16 43,07 10,83 44,63 39,82 4,72 0,45 1,42 5526 627. LD-22 34,60 40,33 8,76 42,38 36,39 12,47 0,40 1,48 5091 648. LD-09 30,42 36,80 9,17 43,99 42,29 4,45 0,34 1,43 5668 749. LD-18 31,56 37,32 8,41 45,25 43,25 3,09 0,23 1,40 5890 7610. LD-17 30,27 36,25 8,72 33,27 29,59 28,42 0,32 1,63 3965 96Catatan :FM = Kandungan air bebas TM = Kandungan air total M = Kandungan airVM = Kandungan air tertambat FC = Kandungan karbon ASH = AbuSt = Total sulfur SG = Berat jenis CV = Nilai kalori<strong>Long</strong> <strong>Daliq</strong>Gambar 1. Peta Lokasi daerah <strong>Inventarisasi</strong>