4.2 Assembling the Pressure Vessel and the Pressure Vessel Lid<br />

• Stand with both feet on the kick loops 12 .<br />

• Lift the pressure vessel 1 and turn it clockwise until the mantle handles 16<br />

are over the kick loops 12 .<br />

• Remove the transport protective cap 18 from the fi lter cartridge.<br />

• Check that the O-ring seal of the fi lter cartridge 2 is correctly seated in the<br />

groove and also check for dirt and damage.<br />

Note: lubricant at the factory.<br />

• Stand on the kick loops 12 with both feet and place the pressure vessel lid 3<br />

on the pressure vessel 1 . The position of the arrow marking on the lid<br />

handle 20 must match the “INSERT” groove.<br />

• Press the pressure vessel lid 3 down and turn clockwise until the lock 15<br />

engages.<br />

4.3 Assembly of Inlet and Outlet Hoses<br />

Note: The inlet and outlet hoses are not included in the standard scope of delivery. The use of<br />

Hobart hose sets is recommended.<br />

• Fit inlet hose 6 at the inlet of the connector head 4 and outlet hose 10 at the outlet of the connector<br />

head 4 .<br />

Note: Inlet “IN” and outlet “OUT” of the connector head 4 are equipped with O-rings as<br />

seals, therefore no additional fl at seals may be used here. Check that the O-rings are seated<br />

correctly.<br />

! Caution: The max. tightening torque at the 1" and 3/4" connections must not exceed 15 Nm!<br />

Only hose connections with fl at seals may be used. Hoses with conical screwed connections damage<br />

the fi lter head connections and invalidate any guarantee claims. Only hoses that comply with<br />

DVGW-W 543 may be used to connect the device.<br />

Before assembly, note the direction of fl ow on the upper side of the fi lter head, “IN” = water inlet,<br />

“OUT” = water outlet. Prior to installation, note installation dimensions and operating position<br />

(Chapter 12). If no original hoses are used, the 1"–3/4" 17 adapter supplied must be used to ensure<br />

the return valve is sealed correctly (pre-fi tted in the water inlet).<br />

5 Commissioning a New Filter<br />

5.1 Bypass Setting for Filter Systems without and with Measuring and Display Unit<br />

• Identify the local carbonate hardness in German hardness °dH (Hobart nomenclature °KH)<br />

using the enclosed carbonate hardness test.<br />

• Check the bypass setting on the bypass screw 19 .<br />

Note: The bypass has been set to Position 1 in the factory, and must be changed to suit the<br />

local carbonate hardness and the application (Chapter 7).<br />

5.2 Commissioning the Filter Systems with Measuring and Display Unit<br />

Representation in operating mode<br />

22<br />

Local Carbonate<br />

Hardness Set<br />

Available residual<br />

capacity in litres<br />

Bar Display<br />

Date Field: Installation or<br />

last fi lter change date<br />

Type/<br />

By-Pass Proportion<br />

Flow Symbol