efurbishment project<br />
Art.<br />
9<br />
Description<br />
Office<br />
Room<br />
U.m.<br />
Quant.<br />
Price<br />
Tot.Partial.Euro<br />
Tot.Gen.Euro<br />
9.1<br />
Supply and installation of<br />
heating and conditioning<br />
system.<br />
Entire room<br />
a c.<br />
1.500<br />
1.500<br />
9.2<br />
Tempera painted ceilings and<br />
veils including its preparation,<br />
by shaving and primer: for<br />
three hands to cover.<br />
Entire room<br />
sqm<br />
32<br />
18<br />
576<br />
9.3<br />
Painting with water-based paint<br />
for three hands to cover the<br />
walls of existing and th new,<br />
including grouting, shooting<br />
sharp, shaving and preparation.<br />
Entire room<br />
sqm<br />
<strong>10</strong>0<br />
20<br />
2.000<br />
Total Office<br />
150<br />
12.000<br />
4.076<br />
<strong>10</strong><br />
Theater<br />
<strong>10</strong>.1<br />
Realization of professional<br />
cinematographic system.<br />
a c.<br />
120.000<br />
To verify<br />
<strong>10</strong>.2<br />
Total bathroom renovation,<br />
according to the project, hot and<br />
cold water supply connected to<br />
the boiler. All that is needed for<br />
the complete installation of the<br />
bathroom equipment and its<br />
water sockets. Including the<br />
network of mechanical<br />
ventilation supply and<br />
installation of suitable vacuum<br />
cleaners.<br />
Underground<br />
n<br />
1<br />
1.600<br />
1.600<br />
<strong>10</strong>.3<br />
Other adjustments of security<br />
systems.<br />
a c.<br />
3.500<br />
3.500<br />
Total Theater<br />
125.<strong>10</strong>0