efurbishment project<br />

Art.<br />

9<br />

Description<br />

Office<br />

Room<br />

U.m.<br />

Quant.<br />

Price<br />

Tot.Partial.Euro<br />

Tot.Gen.Euro<br />

9.1<br />

Supply and installation of<br />

heating and conditioning<br />

system.<br />

Entire room<br />

a c.<br />

1.500<br />

1.500<br />

9.2<br />

Tempera painted ceilings and<br />

veils including its preparation,<br />

by shaving and primer: for<br />

three hands to cover.<br />

Entire room<br />

sqm<br />

32<br />

18<br />

576<br />

9.3<br />

Painting with water-based paint<br />

for three hands to cover the<br />

walls of existing and th new,<br />

including grouting, shooting<br />

sharp, shaving and preparation.<br />

Entire room<br />

sqm<br />

<strong>10</strong>0<br />

20<br />

2.000<br />

Total Office<br />

150<br />

12.000<br />

4.076<br />

<strong>10</strong><br />

Theater<br />

<strong>10</strong>.1<br />

Realization of professional<br />

cinematographic system.<br />

a c.<br />

120.000<br />

To verify<br />

<strong>10</strong>.2<br />

Total bathroom renovation,<br />

according to the project, hot and<br />

cold water supply connected to<br />

the boiler. All that is needed for<br />

the complete installation of the<br />

bathroom equipment and its<br />

water sockets. Including the<br />

network of mechanical<br />

ventilation supply and<br />

installation of suitable vacuum<br />

cleaners.<br />

Underground<br />

n<br />

1<br />

1.600<br />

1.600<br />

<strong>10</strong>.3<br />

Other adjustments of security<br />

systems.<br />

a c.<br />

3.500<br />

3.500<br />

Total Theater<br />

125.<strong>10</strong>0