OPMERKING: BEREKENEN WAARDE RM<br />

• Boekhoudkundige waarde:<br />

– Gebaseerd op foutieve assumptie van risiconeutraliteit<br />

– Men moet rekenen in nutswaarde (cf. risicotolerantie)<br />

– Risicoaversie wil zeggen:<br />

• Nut winst 2X < 2 × Nut winst X<br />

• Nut verlies 2Y > 2 × Nut verlies Y<br />

Verwachte winst is<br />

3,5 miljoen lager<br />

Na RM<br />

Voor RM<br />

Verwachte nut is<br />

3,8 miljoen hoger<br />

23