Of all the CCS assets, location cabinets have been identified as being at most risk of<br />
overheating, particularly older assets. It is recognised that in the longer term, European<br />
Rail Traffic Management System (ERTMS) level 3 radio-based signalling will remove the<br />
need for much lineside equipment. It is recommended that the industry identify <strong>and</strong><br />
prioritise older location cabinets so they can be monitored in the period before an<br />
upgrade takes place.<br />
Network Rail has done extensive work to quantify the thresholds above which increased<br />
asset failures occur. It has not yet reported on what the performance <strong>and</strong> cost impacts<br />
above these identified thresholds are, but it is anticipated that this will be useful <strong>and</strong><br />
valuable information.<br />
Stakeholder workshops identified that there was insufficient knowledge about the effect<br />
of switches <strong>and</strong> crossings on the stress free temperature of rails. Further research is<br />
needed into this area.<br />