Of all the CCS assets, location cabinets have been identified as being at most risk of<br />

overheating, particularly older assets. It is recognised that in the longer term, European<br />

Rail Traffic Management System (ERTMS) level 3 radio-based signalling will remove the<br />

need for much lineside equipment. It is recommended that the industry identify <strong>and</strong><br />

prioritise older location cabinets so they can be monitored in the period before an<br />

upgrade takes place.<br />

Network Rail has done extensive work to quantify the thresholds above which increased<br />

asset failures occur. It has not yet reported on what the performance <strong>and</strong> cost impacts<br />

above these identified thresholds are, but it is anticipated that this will be useful <strong>and</strong><br />

valuable information.<br />

Stakeholder workshops identified that there was insufficient knowledge about the effect<br />

of switches <strong>and</strong> crossings on the stress free temperature of rails. Further research is<br />

needed into this area.<br />