Tomorrow's Railway and Climate Change Adaptation Final Report

2016-05-T1009-final-report

2016-05-T1009-final-report

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Each st<strong>and</strong>ard has been considered separately, <strong>and</strong> it is noted that each applies a<br />

currently suitable mitigation for identified risks. It is recommended that that a systemic<br />

or ‘whole system’ review is undertaken. This needs to ensure that a consistent approach<br />

to climate change projections is considered within relevant design <strong>and</strong> operational<br />

st<strong>and</strong>ards, <strong>and</strong> that design <strong>and</strong> operational st<strong>and</strong>ards are aligned. This would identify<br />

any design st<strong>and</strong>ards that could limit operational performance under future climate<br />

change scenarios. Alternatively, operational responses to mitigate individual weatherrelated<br />

risks to assets or sub-systems could potentially impact on performance under<br />

future climate change scenarios or extreme weather events. Therefore a different risk<br />

mitigation approach or response may be required.<br />

3.8.1 Recommendations for action – review of st<strong>and</strong>ards<br />

Table 8:<br />

Recommendations for action – review of st<strong>and</strong>ards<br />

Timescale<br />

Short term<br />

(to action/<br />

implement<br />

before end<br />

of CP5 i.e.<br />

2014-2019)<br />

Medium<br />

term<br />

(to action/<br />

implement in<br />

next 5-15<br />

years i.e.<br />

CP6 <strong>and</strong><br />

beyond)<br />

Long term<br />

Recommendations<br />

• All st<strong>and</strong>ards relating to the design <strong>and</strong> strategic planning of the GB railway to<br />

be reviewed in context of extreme weather <strong>and</strong> climate change. See Appendix<br />

F1 for further details<br />

• Any lessons learnt from recent experiences of extreme weather events to be<br />

captured <strong>and</strong> fed into ongoing revisions <strong>and</strong> enhancements of st<strong>and</strong>ards relating<br />

to operation <strong>and</strong> management of the GB railway. See Phase 1 Appendix F2 for<br />

further details.<br />

• All st<strong>and</strong>ards relating to the operation <strong>and</strong> management of the GB railway to be<br />

reviewed in context of extreme weather <strong>and</strong> climate change. See Phase 1<br />

Appendix F2 for further details.<br />

N/A<br />

(to action/<br />

implement in<br />

next 15-25<br />

years)<br />

36