Each st<strong>and</strong>ard has been considered separately, <strong>and</strong> it is noted that each applies a<br />
currently suitable mitigation for identified risks. It is recommended that that a systemic<br />
or ‘whole system’ review is undertaken. This needs to ensure that a consistent approach<br />
to climate change projections is considered within relevant design <strong>and</strong> operational<br />
st<strong>and</strong>ards, <strong>and</strong> that design <strong>and</strong> operational st<strong>and</strong>ards are aligned. This would identify<br />
any design st<strong>and</strong>ards that could limit operational performance under future climate<br />
change scenarios. Alternatively, operational responses to mitigate individual weatherrelated<br />
risks to assets or sub-systems could potentially impact on performance under<br />
future climate change scenarios or extreme weather events. Therefore a different risk<br />
mitigation approach or response may be required.<br />
3.8.1 Recommendations for action – review of st<strong>and</strong>ards<br />
Table 8:<br />
Recommendations for action – review of st<strong>and</strong>ards<br />
Timescale<br />
Short term<br />
(to action/<br />
implement<br />
before end<br />
of CP5 i.e.<br />
2014-2019)<br />
Medium<br />
term<br />
(to action/<br />
implement in<br />
next 5-15<br />
years i.e.<br />
CP6 <strong>and</strong><br />
beyond)<br />
Long term<br />
Recommendations<br />
• All st<strong>and</strong>ards relating to the design <strong>and</strong> strategic planning of the GB railway to<br />
be reviewed in context of extreme weather <strong>and</strong> climate change. See Appendix<br />
F1 for further details<br />
• Any lessons learnt from recent experiences of extreme weather events to be<br />
captured <strong>and</strong> fed into ongoing revisions <strong>and</strong> enhancements of st<strong>and</strong>ards relating<br />
to operation <strong>and</strong> management of the GB railway. See Phase 1 Appendix F2 for<br />
further details.<br />
• All st<strong>and</strong>ards relating to the operation <strong>and</strong> management of the GB railway to be<br />
reviewed in context of extreme weather <strong>and</strong> climate change. See Phase 1<br />
Appendix F2 for further details.<br />
N/A<br />
(to action/<br />
implement in<br />
next 15-25<br />
years)<br />
36