18.12.2013 Aufrufe

HYDRAULIKPRESSE 1/2013 – PDF einseitig - Hansa Flex

HYDRAULIKPRESSE 1/2013 – PDF einseitig - Hansa Flex

HYDRAULIKPRESSE 1/2013 – PDF einseitig - Hansa Flex

MEHR ANZEIGEN
WENIGER ANZEIGEN

Erfolgreiche ePaper selbst erstellen

Machen Sie aus Ihren PDF Publikationen ein blätterbares Flipbook mit unserer einzigartigen Google optimierten e-Paper Software.

FaSCInatIon teChnoloGy FasZiNaTiON TeCHNik<br />

FrOM deMOliTiON CaNdidaTe TO<br />

VisiTOr aTTraCTiON<br />

the colossus was built and commissioned in 1991,<br />

the last of five identical conveyor bridges. Its four sisters<br />

are still operating and remove overburden at the<br />

opencast mines at welzow-Süd, nochten, Jänschwalde<br />

and reichwalde. Fate had other plans for<br />

this F60. after a service period of just 15 months, in<br />

which it removed 27 million cubic metres of overburden,<br />

the klettwitz-nord opencast mine was closed.<br />

It seemed that the end was nigh for the 13,500 ton<br />

steel behemoth. Plans were already being made to<br />

blow the F60 up. but these plans were cancelled<br />

thanks to a group of enthusiasts who recognised its<br />

potential. today, the conveyor bridge stands not only<br />

as a symbol of the industrial history of the region, but<br />

also as a sign of structural change.<br />

In 2000, the concept of a visitors’ mine was definitively<br />

adopted. accompanied by over 4,000 interested<br />

spectators, the F60 was moved from the mine<br />

to its current location. the area around the F60 was<br />

opened to visitors for the first time at easter of the<br />

same year. but it would be another two years before<br />

the former F60 overburden conveyor bridge opened<br />

earth Was MoVed<br />

at a rate oF 29,000 cuBic<br />

Metres eVery hour<br />

as a visitors’ mine. on 4 may 2002, the first visitors<br />

were able to climb onto the bridge and walk the<br />

1.3 kilometres from one end to the other and back.<br />

Specially built viewing platforms provide a vast view<br />

over the region, which is still undergoing extraordinary<br />

changes.<br />

Varied prOGraMMe<br />

besides walks on the bridge and guided tours, the<br />

operators of the F60 also offer their visitors adventure,<br />

entertainment, even romance. For example,<br />

the viewing platform at a height of 60 metres can<br />

be booked for exclusive, atmospheric family dinners<br />

or intimate suppers for two. daring guests can abseil<br />

from the dizzying heights. the F60 is also a popular<br />

destination for works outings, as a meeting centre,<br />

or it may serve as a one-of-a-kind backdrop for seminars.<br />

the steel giant also serves as a venue for concerts<br />

and other entertainment events. hanSa-FleX<br />

has taken advantage of these offerings in the past,<br />

with great enjoyment.<br />

So there is much to see and experience at the F60 visitors’<br />

mine, and the varied agenda is well supported.<br />

the 100,000th visitor was welcomed back in 2009.<br />

In <strong>2013</strong>, the F60 will host the european Celtic music<br />

Festival and the uS Car & Custom bike meeting, as<br />

well as many other events. the night presentations,<br />

in which the F60 is transformed into a sculpture of<br />

light and sound, are spectacular highlights. whether<br />

the purpose of your visit is for romance, adventure,<br />

or simply curiosity, the conveyor bridge in lichterfeld<br />

will not disappoint. •<br />

Foto/Photo: Förderverein besucherbergwerk F60 e.v.<br />

die F60 dient auch als einzigartige kulisse für kulturelle Veranstaltungen.<br />

The F60 also serves as a unique backdrop for cultural events.<br />

<strong>HYDRAULIKPRESSE</strong> 1|<strong>2013</strong><br />

43

Hurra! Ihre Datei wurde hochgeladen und ist bereit für die Veröffentlichung.

Erfolgreich gespeichert!

Leider ist etwas schief gelaufen!