HYDRAULIKPRESSE 1/2013 – PDF einseitig - Hansa Flex
HYDRAULIKPRESSE 1/2013 – PDF einseitig - Hansa Flex
HYDRAULIKPRESSE 1/2013 – PDF einseitig - Hansa Flex
Erfolgreiche ePaper selbst erstellen
Machen Sie aus Ihren PDF Publikationen ein blätterbares Flipbook mit unserer einzigartigen Google optimierten e-Paper Software.
FaSCInatIon teChnoloGy FasZiNaTiON TeCHNik<br />
FrOM deMOliTiON CaNdidaTe TO<br />
VisiTOr aTTraCTiON<br />
the colossus was built and commissioned in 1991,<br />
the last of five identical conveyor bridges. Its four sisters<br />
are still operating and remove overburden at the<br />
opencast mines at welzow-Süd, nochten, Jänschwalde<br />
and reichwalde. Fate had other plans for<br />
this F60. after a service period of just 15 months, in<br />
which it removed 27 million cubic metres of overburden,<br />
the klettwitz-nord opencast mine was closed.<br />
It seemed that the end was nigh for the 13,500 ton<br />
steel behemoth. Plans were already being made to<br />
blow the F60 up. but these plans were cancelled<br />
thanks to a group of enthusiasts who recognised its<br />
potential. today, the conveyor bridge stands not only<br />
as a symbol of the industrial history of the region, but<br />
also as a sign of structural change.<br />
In 2000, the concept of a visitors’ mine was definitively<br />
adopted. accompanied by over 4,000 interested<br />
spectators, the F60 was moved from the mine<br />
to its current location. the area around the F60 was<br />
opened to visitors for the first time at easter of the<br />
same year. but it would be another two years before<br />
the former F60 overburden conveyor bridge opened<br />
earth Was MoVed<br />
at a rate oF 29,000 cuBic<br />
Metres eVery hour<br />
as a visitors’ mine. on 4 may 2002, the first visitors<br />
were able to climb onto the bridge and walk the<br />
1.3 kilometres from one end to the other and back.<br />
Specially built viewing platforms provide a vast view<br />
over the region, which is still undergoing extraordinary<br />
changes.<br />
Varied prOGraMMe<br />
besides walks on the bridge and guided tours, the<br />
operators of the F60 also offer their visitors adventure,<br />
entertainment, even romance. For example,<br />
the viewing platform at a height of 60 metres can<br />
be booked for exclusive, atmospheric family dinners<br />
or intimate suppers for two. daring guests can abseil<br />
from the dizzying heights. the F60 is also a popular<br />
destination for works outings, as a meeting centre,<br />
or it may serve as a one-of-a-kind backdrop for seminars.<br />
the steel giant also serves as a venue for concerts<br />
and other entertainment events. hanSa-FleX<br />
has taken advantage of these offerings in the past,<br />
with great enjoyment.<br />
So there is much to see and experience at the F60 visitors’<br />
mine, and the varied agenda is well supported.<br />
the 100,000th visitor was welcomed back in 2009.<br />
In <strong>2013</strong>, the F60 will host the european Celtic music<br />
Festival and the uS Car & Custom bike meeting, as<br />
well as many other events. the night presentations,<br />
in which the F60 is transformed into a sculpture of<br />
light and sound, are spectacular highlights. whether<br />
the purpose of your visit is for romance, adventure,<br />
or simply curiosity, the conveyor bridge in lichterfeld<br />
will not disappoint. •<br />
Foto/Photo: Förderverein besucherbergwerk F60 e.v.<br />
die F60 dient auch als einzigartige kulisse für kulturelle Veranstaltungen.<br />
The F60 also serves as a unique backdrop for cultural events.<br />
<strong>HYDRAULIKPRESSE</strong> 1|<strong>2013</strong><br />
43