Bachelorarbeit
Bachelorarbeit
Bachelorarbeit
Erfolgreiche ePaper selbst erstellen
Machen Sie aus Ihren PDF Publikationen ein blätterbares Flipbook mit unserer einzigartigen Google optimierten e-Paper Software.
Abstract<br />
This essay discusses the reconstruction of the GWIKU 18 Haizingergasse, and the users’<br />
reaction.<br />
First of all the execution architecture office Treberspurg & Partner and his general orientation<br />
get presented. After a short biography of the office founder Martin Treberspurg, and the<br />
responsible project manager Christian Wolfert, follow two chosen buildings realized by the<br />
office: A large residential neighborhood in Vienna, and a passive house in Canada, who shall<br />
point out the philosophy of the office.<br />
In the second part of the essay, the school itself gets presented. It gets described how the<br />
lacks of free space lead to the reconstruction, how first plans about a new construction were<br />
born, and in the end these plans got circumvented. Problems before and during the<br />
construction get described which lead to a delayed completion. It gets pointed out, which<br />
parts of the building were new, and which parts got reconstructed, and what functions got<br />
packed in to the small building lot. Also all renovation measure since the finishing are listed.<br />
At the end of the chapter the reconstruction gets compared to the reconstruction of a school<br />
at the Parhamerplatz, and the conformity with the current ÖISS guidelines gets examined.<br />
In the last part of the essay the experiences of students and teachers with the building get<br />
described. It gets clarified if the location works out and if the school is easily reachable with<br />
public transports. The schools embedding into its surrounding gets just as well discussed as<br />
the existing free space. The satisfaction with the look of the building and the working places<br />
gets just as well outlined, as the satisfaction with the functionality of the building.