ITB 2012-424<br />
UXOs and Solid Waste Management<br />
PAL 10-71646<br />
<strong>Short</strong> <strong>Term</strong> <strong>Rehabilitation</strong> <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> <strong>landfill</strong> <strong>in</strong> <strong>Gaza</strong><br />
<strong>Bill</strong> <strong>of</strong> Quantity<br />
<strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong><br />
PAL 10-71646 - UXOs and Solid Waste Management
ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 2<br />
A. Preamble<br />
1. The <strong>Bill</strong> <strong>of</strong> Quantities shall be read <strong>in</strong> conjunction with the Instructions to Bidders,<br />
General and Special Conditions <strong>of</strong> Contract, General and Technical Specifications, and<br />
Draw<strong>in</strong>gs.<br />
2. The quantities given <strong>in</strong> the <strong>Bill</strong> <strong>of</strong> Quantities are estimated and provisional, and are<br />
given to provide a common basis for bidd<strong>in</strong>g. The basis <strong>of</strong> payment will be the actual<br />
quantities <strong>of</strong> work ordered and carried out, as measured by the Contractor and verified by<br />
the Eng<strong>in</strong>eer and valued at the rates and prices bid <strong>in</strong> the priced <strong>Bill</strong> <strong>of</strong> Quantities, where<br />
applicable, and otherwise at such rates and prices as the Eng<strong>in</strong>eer may fix with<strong>in</strong> the terms<br />
<strong>of</strong> the Contract.<br />
3. The rates and prices bid <strong>in</strong> the priced <strong>Bill</strong> <strong>of</strong> Quantities shall, except <strong>in</strong>s<strong>of</strong>ar as it is<br />
otherwise provided under the Contract, <strong>in</strong>clude all Constructional Plant, labor, supervision,<br />
materials, erection, ma<strong>in</strong>tenance, <strong>in</strong>surance, pr<strong>of</strong>it, taxes, and duties, together with all<br />
general risks, liabilities, and obligations set out or implied <strong>in</strong> the Contract.<br />
4. A rate or price shall be entered aga<strong>in</strong>st each item <strong>in</strong> the priced <strong>Bill</strong> <strong>of</strong> Quantities,<br />
whether quantities are stated or not. The cost <strong>of</strong> Items aga<strong>in</strong>st which the Contractor has<br />
failed to enter a rate or price shall be deemed to be covered by other rates and prices<br />
entered <strong>in</strong> the <strong>Bill</strong> <strong>of</strong> Quantities.<br />
5. The whole cost <strong>of</strong> comply<strong>in</strong>g with the provisions <strong>of</strong> the Contract shall be <strong>in</strong>cluded <strong>in</strong><br />
the Items provided <strong>in</strong> the priced <strong>Bill</strong> <strong>of</strong> Quantities, and where no Items are provided, the<br />
cost shall be deemed to be distributed among the rates and prices entered for the related<br />
Items <strong>of</strong> Work.<br />
6. General directions and descriptions <strong>of</strong> work and materials are not necessarily<br />
repeated nor summarized <strong>in</strong> the <strong>Bill</strong> <strong>of</strong> Quantities. References to the relevant sections <strong>of</strong><br />
the Contract documentation shall be made before enter<strong>in</strong>g prices aga<strong>in</strong>st each item <strong>in</strong> the<br />
priced <strong>Bill</strong> <strong>of</strong> Quantities.<br />
7. Provisional Sums <strong>in</strong>cluded and so designated <strong>in</strong> the <strong>Bill</strong> <strong>of</strong> Quantities shall be<br />
expended <strong>in</strong> whole or <strong>in</strong> part at the direction and discretion <strong>of</strong> the Eng<strong>in</strong>eer.<br />
8. The method <strong>of</strong> measurement <strong>of</strong> completed work for payment shall be <strong>in</strong> accordance<br />
with Palest<strong>in</strong>ian Standards<br />
9. Errors will be corrected by the Employer for any arithmetic errors <strong>in</strong> computation or<br />
summation as follows:<br />
(a) Where there is a discrepancy between amounts <strong>in</strong> figures and <strong>in</strong> words, the<br />
amount <strong>in</strong> words will govern; and
ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 3<br />
(b) where there is a discrepancy between the unit rate and the total amount derived<br />
from the multiplication <strong>of</strong> the unit price and the quantity, the unit rate as quoted<br />
will govern, unless <strong>in</strong> the op<strong>in</strong>ion <strong>of</strong> the Employer, there is an obviously gross<br />
misplacement <strong>of</strong> the decimal po<strong>in</strong>t <strong>in</strong> the unit price, <strong>in</strong> which event the total<br />
amount as quoted will govern and the unit rate will be corrected.<br />
10. The Unit Prices given hereunder the BOQ shall also <strong>in</strong>clude erection, <strong>in</strong>stallation, fix<strong>in</strong>g,<br />
and re-fix<strong>in</strong>g <strong>of</strong> all elements. These prices shall also <strong>in</strong>clude taxes, visa for labor, gate passes,<br />
accommodations for the Contractor’s staff and labors, all required <strong>in</strong>surance and work<br />
permits, guarantees, bonds etc. and all requirements necessary to have the work ma<strong>in</strong>ta<strong>in</strong>ed<br />
until its f<strong>in</strong>al hand<strong>in</strong>g over.<br />
11. The Unit Prices given hereunder <strong>in</strong> the <strong>Bill</strong> <strong>of</strong> Quantities for this work shall also <strong>in</strong>clude<br />
overheads, risks, pr<strong>of</strong>it etc. and all other f<strong>in</strong>ancial matters to have all these civil works<br />
completed.<br />
12. The works, materials or activities listed <strong>in</strong> the follow<strong>in</strong>g shall always be considered as<br />
supportive works to be <strong>in</strong>cluded <strong>in</strong> the Unit Prices bid for any item <strong>in</strong> the <strong>Bill</strong> <strong>of</strong> Quantities:<br />
(a) Any measurement for execution and payment <strong>of</strong> the works, <strong>in</strong>clud<strong>in</strong>g the<br />
provision <strong>of</strong> measur<strong>in</strong>g <strong>in</strong>struments, gauges, sett<strong>in</strong>g out marks, mark<strong>in</strong>g pa<strong>in</strong>t<br />
and relevant tools, labor, etc., the ma<strong>in</strong>tenance and preservation <strong>of</strong> gauges and<br />
sett<strong>in</strong>g-out marks dur<strong>in</strong>g the execution <strong>of</strong> the works.<br />
(b) Provision <strong>of</strong> small tackle tools or any other equipment required for the<br />
execution <strong>of</strong> the works.<br />
(c) Supply <strong>of</strong> consumable materials for the Contractor’s equipment.<br />
(d) Removal <strong>of</strong> all contam<strong>in</strong>ation (refuse, debris, build<strong>in</strong>g rubbish and the like)<br />
aris<strong>in</strong>g from or <strong>in</strong> connection with the Contractor’s work.<br />
(e) Protection <strong>of</strong> the executed works and <strong>of</strong> the items made available for<br />
execution <strong>of</strong> the works from damage, fire, <strong>in</strong>clement weather, vandalism and<br />
theft etc., to the time <strong>of</strong> f<strong>in</strong>al acceptance.<br />
(f) Transportation <strong>of</strong> all materials and structural components from the storage<br />
places on site to the po<strong>in</strong>ts <strong>of</strong> use and return transportation, if required.<br />
(g) Submitt<strong>in</strong>g and transport<strong>in</strong>g any samples required.<br />
(h) Carry<strong>in</strong>g out tests on materials and works, etc., that is required by the<br />
Eng<strong>in</strong>eer.<br />
(i) Fuel and lubricants for operation <strong>of</strong> Contractor’s equipment.<br />
(j) <strong>Al</strong>l safety precautions and measures for safeguard<strong>in</strong>g labor as well as<br />
secur<strong>in</strong>g surround<strong>in</strong>g areas.<br />
(k) Light<strong>in</strong>g <strong>of</strong> the work site.<br />
13. RIGHTS OF EMPLOYER<br />
The follow<strong>in</strong>g rights are reserved to the Employer:
ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 4<br />
(a) To omit <strong>in</strong>dividual items mentioned <strong>in</strong> the Schedule <strong>of</strong> Prices if not required <strong>in</strong><br />
the op<strong>in</strong>ion <strong>of</strong> the Employer and/or to replace them should it be more<br />
advantageous to execute them <strong>in</strong> another way.<br />
(b) To order execution <strong>of</strong> alternative or provisional items as if they were ma<strong>in</strong> items.<br />
(c) To order execution <strong>of</strong> additional works as well as alternatives <strong>of</strong> works, always <strong>in</strong><br />
conformity with the conditions outl<strong>in</strong>ed <strong>in</strong> the Contract.<br />
Any order and/or delivery <strong>of</strong> material or equipment by the Contractor for performance <strong>of</strong> the<br />
works may only be based on <strong>in</strong>structions and/or approved execution draw<strong>in</strong>gs by the<br />
Employer/Eng<strong>in</strong>eer.<br />
<strong>Al</strong>l equipment and materials for <strong>in</strong>stallation and f<strong>in</strong>ish<strong>in</strong>g works to be <strong>in</strong>corporated <strong>in</strong> this<br />
contract shall prior to order<strong>in</strong>g and/or delivery by the Contractor, be approved by the<br />
Employer/Eng<strong>in</strong>eer both <strong>in</strong> respect <strong>of</strong> quality and type as well as <strong>of</strong> quantity.<br />
14. SITE ACCESS AND STORAGE<br />
The Tenderer shall visit the site and ascerta<strong>in</strong> the location <strong>of</strong> required access onto the site and<br />
the location <strong>of</strong> allowance for comply<strong>in</strong>g with the requirements and for the re<strong>in</strong>statement to<br />
orig<strong>in</strong>al condition <strong>of</strong> all roads and areas used or disturbed by the Contractor to the satisfaction<br />
<strong>of</strong> the Eng<strong>in</strong>eer.<br />
15. SITE INSTALLATION<br />
<strong>Al</strong>l costs <strong>of</strong> labor, works, provisions, materials and equipment for Site Installations required<br />
by the Contractor and stipulated <strong>in</strong> the Tender Documents shall be <strong>in</strong>cluded <strong>in</strong> the various<br />
unit prices <strong>of</strong> the <strong>Bill</strong> <strong>of</strong> Quantities. No extra payment will be allowed by the Employer for<br />
any <strong>of</strong> these activities.<br />
16. DURATION<br />
The total duration <strong>of</strong> the contract is N<strong>in</strong>e (9) calendar months <strong>in</strong>clud<strong>in</strong>g weekends, holidays<br />
and <strong>of</strong>ficial holidays.<br />
Special Note:<br />
<strong>Al</strong>l items <strong>in</strong>cluded <strong>in</strong> <strong>Bill</strong> 1, <strong>Bill</strong>2, <strong>Bill</strong>3, and <strong>Bill</strong> 4, for which no rate or price is required<br />
to be entered by the Bidder, will not be paid for by <strong>UNDP</strong> when executed and shall be<br />
deemed covered by the other rates and prices <strong>in</strong> the <strong>Bill</strong> <strong>of</strong> Quantities.
ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 5<br />
B. Work Items<br />
1. General items, general services .............................................................................. 4<br />
2. Field Investigations ................................................................................................... 10<br />
3. Test Field ....................................................................................................................... 13<br />
4. Site Clearance ............................................................................................................. 17<br />
5. Excavations .................................................................................................................. 19<br />
6. Bentonite Mat ............................................................................................................. 28<br />
7. Geo-membrane .......................................................................................................... 30<br />
8. Geotextile ..................................................................................................................... 34<br />
9. Dra<strong>in</strong>age Layer ............................................................................................................ 38<br />
10. PE-HD Works ................................................................................................................ 40<br />
11. Concrete Works .......................................................................................................... 53<br />
12. Leachate Recirculation ............................................................................................ 60<br />
13. Surface Water Collection ........................................................................................ 68<br />
14. Road Construction .................................................................................................... 72<br />
15. Gas Collection ............................................................................................................. 77<br />
16. Special Equipment .................................................................................................... 81<br />
Summary ....................................................................................................................... 85
ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 6<br />
<strong>Bill</strong> No. 1: General Items, general services<br />
Item no. Description Unit Quantity Rate Amount<br />
The Bidders have to consider the<br />
follow<strong>in</strong>g notes when complet<strong>in</strong>g<br />
their proposal:<br />
Note 1: <strong>Al</strong>l prices have to be given <strong>in</strong><br />
US$ (United States Dollars)<br />
Note 2: Explanation <strong>of</strong> punctuation:<br />
- Dot (".") means decimal po<strong>in</strong>t<br />
- Comma (",") means "thousands<br />
The contractor has to consider that<br />
the <strong>landfill</strong> is located <strong>in</strong> a region with<br />
special climatic and geological<br />
conditions. This concerns site design<br />
criteria as listed <strong>in</strong> the General and<br />
Technical Specification.<br />
Therefore the contractor should<br />
pro<strong>of</strong>, that all material and facilities<br />
supplied and all works carried out by<br />
the contractor or his subcontractor<br />
will consider above mentioned<br />
conditions and comply with<br />
applicable Palest<strong>in</strong>ian regulations and<br />
standards. If Palest<strong>in</strong>ian regulations<br />
and standards are not applicable or<br />
available the Contractor should pro<strong>of</strong><br />
best available technology.<br />
The Contractor shall be obliged to<br />
fulfil all Palest<strong>in</strong>ian Regulations<br />
<strong>in</strong>clud<strong>in</strong>g respective limit<strong>in</strong>g values.<br />
He has to prove the fulfilment<br />
whenever required, latest dur<strong>in</strong>g<br />
commission<strong>in</strong>g. <strong>Al</strong>l costs for the<br />
fulfilment <strong>of</strong> the Palest<strong>in</strong>ian<br />
Regulations shall be <strong>in</strong>cluded <strong>in</strong> the<br />
prices given <strong>in</strong> the bid.<br />
The above remark should be valid for<br />
all material and facilities supplied and<br />
all works carried out as listed <strong>in</strong> the<br />
BoQ even if not stated there<br />
specifically.
ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 7<br />
Item no. Description Unit Quantity Rate Amount<br />
1.1 <strong>Al</strong>low for ma<strong>in</strong>tenance <strong>of</strong> works for 12<br />
months after completion<br />
1.2 The cost price shall <strong>in</strong>clude the<br />
follow<strong>in</strong>g:<br />
- Worker's protection plan<br />
and emergency plan<br />
A worker's protection and emergency<br />
plan has to be drawn up <strong>in</strong><br />
accordance with the explanations <strong>of</strong><br />
the General and Technical<br />
Specifications for the whole<br />
construction time<br />
- Build<strong>in</strong>g site equipment for<br />
the Contractor<br />
Appliances, tools and other operat<strong>in</strong>g<br />
material, which is required to carry<br />
out the build<strong>in</strong>g works as<br />
contractually agreed, shall be placed<br />
on site, readily<br />
available and - except for the fact that<br />
the material's use is charged<br />
separately - be put <strong>in</strong>to operat<strong>in</strong>g<br />
condition <strong>in</strong>clusive <strong>of</strong> all works<br />
<strong>in</strong>volved here<strong>in</strong>. The required fix<br />
<strong>in</strong>stallations shall be provided.<br />
The costs aris<strong>in</strong>g to prepare, ma<strong>in</strong>ta<strong>in</strong><br />
and operate appliances, build<strong>in</strong>gs<br />
(<strong>of</strong>fices), storage and work<strong>in</strong>g areas,<br />
temporary roads for the build<strong>in</strong>g<br />
phase, tools and equipment <strong>in</strong>clud<strong>in</strong>g<br />
payments for rent, lease, fees and the<br />
like shall be <strong>in</strong>cluded <strong>in</strong> the lump sum.<br />
Build<strong>in</strong>gs (<strong>of</strong>fices), storage and<br />
work<strong>in</strong>g areas, preparation and<br />
ma<strong>in</strong>tenance <strong>of</strong> accommodation<br />
and social rooms for the Contractor's<br />
personnel, erection and preparation<br />
<strong>of</strong> scaffold<strong>in</strong>gs, platforms and the like<br />
as well as <strong>in</strong>stallation and preparation<br />
<strong>of</strong> an electronic data process<strong>in</strong>g unit<br />
shall be carried out <strong>in</strong> accordance<br />
with the stipulations by Project<br />
Manager
ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 8<br />
Item no. Description Unit Quantity Rate Amount<br />
- Build<strong>in</strong>gs for the Project<br />
Manager<br />
Temporary build<strong>in</strong>gs (<strong>of</strong>fices) and<br />
workshops for the Project Manager<br />
shall be supplied and ma<strong>in</strong>ta<strong>in</strong>ed<br />
for the length <strong>of</strong> the construction <strong>of</strong><br />
the first section <strong>of</strong> the <strong>landfill</strong>. Details<br />
<strong>of</strong> requirements for the build<strong>in</strong>gs are<br />
described <strong>in</strong> General Specifications.<br />
- Build<strong>in</strong>gs for geotechnical<br />
<strong>in</strong>stitute<br />
Temporary build<strong>in</strong>gs (<strong>of</strong>fices) and<br />
workshops for the external supervisor<br />
(geotechnical <strong>in</strong>stitute), who carries<br />
out the field <strong>in</strong>vestigations, shall be<br />
supplied and ma<strong>in</strong>ta<strong>in</strong>ed for the<br />
length <strong>of</strong> the construction <strong>of</strong> the first<br />
section <strong>of</strong> the <strong>landfill</strong> site. Details <strong>of</strong><br />
requirements for the build<strong>in</strong>gs are<br />
described <strong>in</strong> General Specifications.<br />
- Temporary supply and<br />
discharg<strong>in</strong>g facilities<br />
The construction site as well as the<br />
site <strong>of</strong>fices <strong>of</strong> the Constructor and the<br />
Project Manager shall be supplied<br />
with: electricity, dr<strong>in</strong>k<strong>in</strong>g water,<br />
service water, waste water disposal,<br />
telephone <strong>in</strong>stallation / transmitt<strong>in</strong>g<br />
and receiv<strong>in</strong>g set<br />
- Clear<strong>in</strong>g <strong>of</strong> construction site<br />
Clear<strong>in</strong>g <strong>of</strong> the entire construction<br />
site and all <strong>in</strong>stallations <strong>in</strong>clud<strong>in</strong>g the<br />
repair <strong>of</strong> damage as well as the<br />
recondition<strong>in</strong>g <strong>of</strong> all areas used.
ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 9<br />
Item no. Description Unit Quantity Rate Amount<br />
1.8 - Survey<strong>in</strong>g services<br />
<strong>Al</strong>l survey<strong>in</strong>g works which are to be<br />
supplied by the Constructor shall be<br />
provided such as control <strong>of</strong> the<br />
exist<strong>in</strong>g survey, extension <strong>of</strong> the<br />
exist<strong>in</strong>g survey to 10 m at the outside<br />
<strong>of</strong> the <strong>landfill</strong> area and fabrication <strong>of</strong> a<br />
digital 3-dimensional model <strong>of</strong> the<br />
terra<strong>in</strong>. For a detailed list <strong>of</strong> all works<br />
which are to be carried out please<br />
refer to the General and Technical<br />
Specifications.<br />
<strong>Al</strong>l documents (as-built plan etc) shall<br />
be handed over to the Project<br />
Manager <strong>in</strong> 3-fold as copies (one copy<br />
as pr<strong>in</strong>table copy). Furthermore, all<br />
documents and draw<strong>in</strong>gs shall be<br />
supplied to the Project Manager on a<br />
data carrier <strong>in</strong> a format to be<br />
determ<strong>in</strong>ed by the Project Manager.<br />
Remuneration <strong>of</strong> all result<strong>in</strong>g <strong>in</strong>voices<br />
<strong>in</strong> a lump sum.
ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 10<br />
Item no. Description Unit Quantity Rate Amount<br />
Fixed po<strong>in</strong>ts <strong>of</strong> altitude (for survey)<br />
The polygonal po<strong>in</strong>t <strong>of</strong> altitude shall<br />
be produced with the help <strong>of</strong> a bolt<br />
(round head) <strong>of</strong> at least 10 cm length,<br />
which has been put <strong>in</strong> a concrete<br />
foundation (m<strong>in</strong>imum cross section<br />
0.07 m², concrete quality C 25/30 EN<br />
206-1). The position <strong>of</strong> the fixed<br />
po<strong>in</strong>ts shall be determ<strong>in</strong>ed together<br />
with the Project Manager. The<br />
polygonal po<strong>in</strong>ts shall be measured<br />
prior to the first ground survey carries<br />
out by Constructor. Dur<strong>in</strong>g the entire<br />
time <strong>of</strong> construction the altitude <strong>of</strong><br />
the fixed po<strong>in</strong>ts shall be controlled at<br />
regular <strong>in</strong>tervals. <strong>Al</strong>l required works<br />
shall be <strong>in</strong>corporated <strong>in</strong>to the<br />
standard price. Depth <strong>of</strong> concrete<br />
foundation 100 cm, polygonal po<strong>in</strong>t<br />
<strong>of</strong> altitude shall be ma<strong>in</strong>ta<strong>in</strong>ed<br />
Static calculation <strong>of</strong> PE-HD pipes<br />
Static calculation for all PE-HD pipes.<br />
The calculation for all pipes shall be<br />
accomplished separately.<br />
Remuneration <strong>of</strong> all result<strong>in</strong>g <strong>in</strong>voices<br />
<strong>in</strong> a lump sum<br />
Pro<strong>of</strong> <strong>of</strong> static calculation <strong>of</strong> pipes<br />
<strong>Al</strong>l static calculations <strong>of</strong> PE-HD pipes<br />
shall be checked by an <strong>in</strong>dependent<br />
expert who shall be determ<strong>in</strong>ed by<br />
the Constructor. Remuneration <strong>of</strong> all<br />
result<strong>in</strong>g <strong>in</strong>voices <strong>in</strong> a lump sum.<br />
Execution design<br />
Execution design for all electrical<br />
works on and around the <strong>landfill</strong><br />
(especially for leachate recirculation)<br />
Remuneration <strong>in</strong> a lump sum
ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 11<br />
Item no. Description Unit Quantity Rate Amount<br />
Progress report, documentation<br />
<strong>Al</strong>l project progress reports,<br />
photographic documentation, etc.<br />
shall be prepared as expla<strong>in</strong>ed <strong>in</strong> the<br />
General Specifications. The<br />
equipment which is necessary to carry<br />
out these jobs (such as hardware,<br />
s<strong>of</strong>tware, copy<strong>in</strong>g and b<strong>in</strong>d<strong>in</strong>g<br />
mach<strong>in</strong>es) shall be <strong>in</strong>stalled and<br />
operated at the construction site.<br />
Detail draw<strong>in</strong>gs, plans <strong>of</strong> execution<br />
<strong>Al</strong>l detail draw<strong>in</strong>gs and plans <strong>of</strong><br />
execution which are to be supplied by<br />
the Constructor shall be handed over<br />
<strong>in</strong> 3-fold as copies (one copy as<br />
pr<strong>in</strong>table copy). <strong>Al</strong>l works which are to<br />
be carried out are listed <strong>in</strong> the<br />
Technical Specifications.<br />
Remuneration <strong>of</strong> all result<strong>in</strong>g <strong>in</strong>voices<br />
<strong>in</strong> a lump sum.<br />
As-built plan<br />
Preparation <strong>of</strong> as-built plan for the<br />
entire project based on governmental<br />
ground maps and as-built plans<br />
(survey <strong>of</strong> land, etc) provided by the<br />
Constructor. The scope <strong>of</strong> supply<br />
<strong>in</strong>cludes:<br />
Record<strong>in</strong>g <strong>in</strong> view <strong>of</strong> position and<br />
altitude <strong>of</strong> the pipel<strong>in</strong>e and supply<br />
l<strong>in</strong>e network produced <strong>in</strong>clusive <strong>of</strong><br />
<strong>in</strong>spection chambers, special<br />
chambers and all other build<strong>in</strong>gs with<br />
relevant height <strong>in</strong>dications, <strong>in</strong>dication<br />
<strong>of</strong> cross-sections, longitud<strong>in</strong>al<br />
sections, descents, etc., Record<strong>in</strong>g <strong>of</strong><br />
the entire area <strong>of</strong> the <strong>landfill</strong> by<br />
means <strong>of</strong> an electronic tachymeter on<br />
basis <strong>of</strong> the local map grid, which is to<br />
be provided by the Constructor.<br />
Preparation <strong>of</strong> plans show<strong>in</strong>g the<br />
prevail<strong>in</strong>g conditions and<br />
longitud<strong>in</strong>al pr<strong>of</strong>iles.
ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 12<br />
<strong>Bill</strong> No. 2: Field Investigations<br />
Item no. Description Unit Quantity Rate Amount<br />
The <strong>in</strong>dividual field <strong>in</strong>vestigations are<br />
described <strong>in</strong> more detail <strong>in</strong> the<br />
relevant chapters <strong>of</strong> the General and<br />
Technical Specifications. The external<br />
supervisor must be <strong>in</strong>dependent and<br />
shall be determ<strong>in</strong>ed already on order<br />
presentation. The relevant <strong>in</strong>stitute<br />
shall be presented (<strong>in</strong>stitute, address,<br />
contact person, telephone) and<br />
approved <strong>in</strong> written from.<br />
Base <strong>of</strong> <strong>landfill</strong> (fills) and r<strong>in</strong>g road<br />
Deformation module EV2 on base <strong>of</strong><br />
<strong>landfill</strong> site and sub-base <strong>of</strong> r<strong>in</strong>g road<br />
shall be executed accord<strong>in</strong>g to the<br />
specifications made by the<br />
<strong>in</strong>dependent geotechnical <strong>in</strong>stitute <strong>in</strong><br />
areas where material is filled.<br />
Base (planum) <strong>of</strong> <strong>landfill</strong><br />
Compaction degree Dpr and<br />
deformation module EV2 on base<br />
grade <strong>of</strong> <strong>landfill</strong> site shall be executed<br />
accord<strong>in</strong>g to the specifications made<br />
by the <strong>in</strong>dependent geotechnical<br />
<strong>in</strong>stitute.<br />
Gra<strong>in</strong> size distribution support<br />
layer<br />
Exam<strong>in</strong>ation <strong>of</strong> the particle size<br />
distribution and <strong>of</strong> the undersize<br />
particles (fractile <strong>of</strong> probability<br />
distribution 20%) at the support layer<br />
shall be executed accord<strong>in</strong>g to the<br />
specifications made by the<br />
<strong>in</strong>dependent geotechnical <strong>in</strong>stitute<br />
and the Technical Specifications.<br />
Gra<strong>in</strong> size distribution dra<strong>in</strong>age<br />
layer<br />
Exam<strong>in</strong>ation <strong>of</strong> the particle size distribution<br />
and <strong>of</strong> the undersize particles<br />
(fractile <strong>of</strong> probability distribution<br />
10%) at the filter gravel shall be executed<br />
accord<strong>in</strong>g to the specifications<br />
made by the <strong>in</strong>dependent<br />
geotechnical <strong>in</strong>stitute and the<br />
Technical Specifications.
ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 13<br />
Item no. Description Unit Quantity Rate Amount<br />
Calcium-Carbonate<br />
Exam<strong>in</strong>ation <strong>of</strong> the Calcium-<br />
Carbonate content at the filter gravel<br />
(dra<strong>in</strong>age layer) shall be executed<br />
accord<strong>in</strong>g to the specifications made<br />
by the <strong>in</strong>dependent geotechnical<br />
<strong>in</strong>stitute and the description <strong>of</strong><br />
construction.<br />
Compaction degree<br />
Exam<strong>in</strong>ation <strong>of</strong> the compaction<br />
degree Dpr <strong>of</strong> the m<strong>in</strong>eral base<br />
material <strong>of</strong> the leachate pond shall be<br />
executed accord<strong>in</strong>g to the<br />
specifications made by the<br />
<strong>in</strong>dependent geotechnical <strong>in</strong>stitute.<br />
Field <strong>in</strong>vestigation <strong>of</strong> permeability<br />
Exam<strong>in</strong>ation <strong>of</strong> the coefficient <strong>of</strong><br />
permeability for the m<strong>in</strong>eral base l<strong>in</strong>er<br />
material <strong>of</strong> the leachate pond shall be<br />
executed accord<strong>in</strong>g to specifications<br />
made by the <strong>in</strong>dependent<br />
geotechnical <strong>in</strong>stitute<br />
Water content<br />
Exam<strong>in</strong>ation <strong>of</strong> the water content for<br />
the m<strong>in</strong>eral base l<strong>in</strong>er material <strong>of</strong> the<br />
leachate pond shall be executed<br />
accord<strong>in</strong>g to the specifications made<br />
by the <strong>in</strong>dependent geotechnical<br />
<strong>in</strong>stitute.<br />
Gra<strong>in</strong> size distribution<br />
Exam<strong>in</strong>ation <strong>of</strong> the particle size<br />
distribution for the m<strong>in</strong>eral base l<strong>in</strong>er<br />
material <strong>of</strong> the leachate pond shall be<br />
executed accord<strong>in</strong>g to the<br />
specifications made by the<br />
<strong>in</strong>dependent geotechnical <strong>in</strong>stitute.
ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 14<br />
Item no. Description Unit Quantity Rate Amount<br />
Compaction degree<br />
Exam<strong>in</strong>ation <strong>of</strong> the compaction<br />
degree Dpr <strong>of</strong> the m<strong>in</strong>eral base<br />
material <strong>of</strong> the base seal<strong>in</strong>g system<br />
(for each layer) shall be executed<br />
accord<strong>in</strong>g to the specifications made<br />
by the <strong>in</strong>dependent geotechnical<br />
<strong>in</strong>stitute.<br />
Field <strong>in</strong>vestigation <strong>of</strong> permeability<br />
Exam<strong>in</strong>ation <strong>of</strong> the coefficient <strong>of</strong><br />
permeability for the m<strong>in</strong>eral base<br />
material <strong>of</strong> the base seal<strong>in</strong>g system<br />
(for each layer) shall be executed<br />
accord<strong>in</strong>g to specifications made by<br />
the <strong>in</strong>dependent geotechnical<br />
<strong>in</strong>stitute<br />
Water content<br />
Exam<strong>in</strong>ation <strong>of</strong> the water content for<br />
the m<strong>in</strong>eral base material <strong>of</strong> the base<br />
seal<strong>in</strong>g system (for each layer) shall be<br />
executed accord<strong>in</strong>g to the<br />
specifications made by the<br />
<strong>in</strong>dependent geotechnical <strong>in</strong>stitute.<br />
Gra<strong>in</strong> size distribution<br />
Exam<strong>in</strong>ation <strong>of</strong> the particle size<br />
distribution for the m<strong>in</strong>eral base<br />
material <strong>of</strong> the base seal<strong>in</strong>g system<br />
(for each layer) shall be executed<br />
accord<strong>in</strong>g to the specifications made<br />
by the <strong>in</strong>dependent geotechnical<br />
<strong>in</strong>stitute.
ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 15<br />
<strong>Bill</strong> No. 3: Test Field<br />
Item no. Description Unit Quantity Rate Amount<br />
The test field shall be produced as<br />
expla<strong>in</strong>ed <strong>in</strong> the Technical<br />
Specifications. The specifications<br />
stipulated by the <strong>in</strong>dependent<br />
geotechnical <strong>in</strong>stitute shall be<br />
followed most exactly. The standard<br />
prices mentioned below <strong>in</strong>clude the<br />
presentation <strong>of</strong> all <strong>in</strong>vestigations and<br />
all secondary work <strong>in</strong>volved. Possible<br />
h<strong>in</strong>drances caused by the fact that the<br />
<strong>in</strong>vestigations had to be carried out at<br />
different po<strong>in</strong>ts <strong>in</strong> time (<strong>in</strong>terruptions<br />
etc.) shall be considered.<br />
Base <strong>of</strong> <strong>landfill</strong> site, pla<strong>in</strong> base<br />
Base (planum) <strong>of</strong> <strong>landfill</strong> site shall be<br />
produced <strong>in</strong> the pla<strong>in</strong> base range <strong>of</strong><br />
the test field to support the base<br />
l<strong>in</strong>ers. Longitud<strong>in</strong>al gradient <strong>of</strong> the<br />
pla<strong>in</strong> base is 1 %.<br />
Material for base: sandy, silty material<br />
(“support layer”, see Technical<br />
Specifications) Permitted deviation<br />
from specified height: +/- 3 cm.<br />
Base (planum) <strong>of</strong> <strong>landfill</strong> site,<br />
slopes<br />
Base (planum) <strong>of</strong> <strong>landfill</strong> site <strong>in</strong> the<br />
slope area <strong>of</strong> the test field shall be<br />
produced to support the m<strong>in</strong>eral<br />
l<strong>in</strong>ers. Slope 1:2.5.<br />
Material for base: sandy, silty material<br />
(“support layer”, see Technical<br />
Specifications) Permitted deviation<br />
from specified height: +/- 3 cm.<br />
Compaction (planum), pla<strong>in</strong> base<br />
Compaction <strong>of</strong> base <strong>of</strong> <strong>landfill</strong> site <strong>in</strong><br />
the pla<strong>in</strong> base area <strong>of</strong> the <strong>landfill</strong>. Soil<br />
conditions are expla<strong>in</strong>ed <strong>in</strong> the<br />
subsoil test (please refer to the<br />
Technical Specifications).
ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 16<br />
Item no. Description Unit Quantity Rate Amount<br />
Compaction (planum), slopes<br />
Compaction <strong>of</strong> base <strong>of</strong> <strong>landfill</strong> site <strong>in</strong> the<br />
slope area <strong>of</strong> the <strong>landfill</strong>. Soil conditions<br />
are expla<strong>in</strong>ed <strong>in</strong> the subsoil test (please<br />
refer to the Technical Specifications).<br />
Slope: 1:2.5<br />
M<strong>in</strong>eral Seal<strong>in</strong>g, plan base area<br />
M<strong>in</strong>eral base l<strong>in</strong>er made from strongly<br />
b<strong>in</strong>d<strong>in</strong>g clay material shall be<br />
<strong>in</strong>corporated <strong>in</strong> layers <strong>of</strong> 0.275 m<br />
accord<strong>in</strong>g to the prevail<strong>in</strong>g pr<strong>of</strong>ile and<br />
shall be compacted layer by layer.<br />
Material requirements accord<strong>in</strong>g to<br />
Technical Specifications.<br />
Incorporation <strong>in</strong>to the pla<strong>in</strong> base area <strong>of</strong><br />
the test field<br />
The material to be compacted shall be<br />
supplied by a secondary storage site <strong>of</strong><br />
the Contractor.<br />
M<strong>in</strong>eral Seal<strong>in</strong>g, slope areas<br />
Incorporation <strong>of</strong> b<strong>in</strong>d<strong>in</strong>g clay material<br />
<strong>in</strong>to the slope areas <strong>of</strong> the test field,<br />
slope 1:2.5 - all other works as expla<strong>in</strong>ed<br />
<strong>in</strong> item no. 3.5<br />
Geomembrane layer<br />
A flexible geo-membrane made from<br />
PEHD shall be supplied, laid and<br />
<strong>in</strong>stalled (welded) <strong>in</strong> accordance with<br />
manufacturer's guidel<strong>in</strong>es on the<br />
bentonite mat <strong>in</strong> the pla<strong>in</strong> base areas <strong>of</strong><br />
the <strong>landfill</strong> site.<br />
The sheet<strong>in</strong>gs shall be laid out <strong>in</strong> full<br />
size and pla<strong>in</strong> on the base <strong>of</strong> <strong>landfill</strong> site.<br />
No wr<strong>in</strong>kl<strong>in</strong>g is allowed. The overlaps <strong>in</strong><br />
longitud<strong>in</strong>al and transverse direction<br />
shall be m<strong>in</strong>. 15 cm. Only the ground<br />
covered by the geotextile shall be<br />
remunerated, the overlapp<strong>in</strong>g part shall<br />
be <strong>in</strong>cluded <strong>in</strong> the standard price.<br />
The weld<strong>in</strong>g seams shall be executed as<br />
double seams with <strong>in</strong>spection channel.<br />
Each weld<strong>in</strong>g seam shall be tested for<br />
impermeability and cohesiveness<br />
accord<strong>in</strong>g to the exist<strong>in</strong>g regulations.
ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 17<br />
Item no. Description Unit Quantity Rate Amount<br />
A protocol for each seam test shall be<br />
given to the Project Manager.<br />
When the sheet<strong>in</strong>gs are welded<br />
attention has to be paid to restrictions<br />
due to unsuitable weather conditions.<br />
That the chemical resistance and<br />
physical properties shall be verified <strong>in</strong><br />
accordance with the relevant<br />
regulations (such as ASTM D 1593,<br />
ASTM D 638, etc.).<br />
The MFI Index (MFI 190/5) <strong>of</strong> the<br />
flexible geo-membrane layers shall be<br />
more than 2.<br />
Thickness <strong>of</strong> geo-membrane layer<br />
shall be m<strong>in</strong>. 1.5 mm, the width <strong>of</strong> a<br />
layer shall be 5 m.<br />
Area <strong>of</strong> <strong>in</strong>corporation: base and slope<br />
area<br />
Geo-textile 1200 g/m2<br />
Overlaps <strong>in</strong> longitud<strong>in</strong>al and<br />
transverse direction shall be m<strong>in</strong>. 50<br />
cm.<br />
Only the ground covered by the geotextile<br />
shall be remunerated, the<br />
overlapp<strong>in</strong>g parts shall be <strong>in</strong>cluded <strong>in</strong><br />
the standard price.<br />
The geo-textile shall be made <strong>of</strong><br />
mechanically bonded PEHD filaments.<br />
The chemical resistance and the<br />
physical properties <strong>in</strong> accordance<br />
with the relevant regulations (such as<br />
EN 10319, EN ISO 12236 etc.) shall be<br />
verified by both <strong>in</strong>ternal quality<br />
assurance and external quality control<br />
and assurance by an <strong>in</strong>dependent<br />
authorised laboratory.<br />
The specific weight <strong>of</strong> the geo-textile<br />
shall be m<strong>in</strong>. 1,200 g/m2.
ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 18<br />
Item no. Description Unit Quantity Rate Amount<br />
Filter gravel 16/32 mm, base area<br />
A surface filter made <strong>of</strong> filter gravel<br />
16/32 mm (CaCO3 content
ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 19<br />
<strong>Bill</strong> No. 4: Site Clearance<br />
Item no. Description Unit Quantity Rate Amount<br />
Lift<strong>in</strong>g up and stor<strong>in</strong>g <strong>of</strong> stone<br />
chips V
ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 20<br />
Item no. Description Unit Quantity Rate Amount<br />
4.5 Clear<strong>in</strong>g <strong>of</strong> paved areas<br />
Bitum<strong>in</strong>ous paved areas <strong>in</strong> the<br />
northern part <strong>of</strong> the exist<strong>in</strong>g <strong>landfill</strong><br />
area shall be cut, loaded and removed<br />
from the <strong>landfill</strong> site. The material<br />
becomes property <strong>of</strong> the Contractor<br />
and shall be removed to a disposal<br />
site <strong>of</strong> the Contractor.<br />
Thickness <strong>of</strong> paved areas about 20 to<br />
30 cm.<br />
The unit price conta<strong>in</strong>s all costs for<br />
the disposal.<br />
Delivery and <strong>in</strong>corporate ≈ its<br />
means Supply and <strong>in</strong>stall<br />
Supply <strong>of</strong> materials has to be secured<br />
before submitt<strong>in</strong>g relevant activities.<br />
It is anticipated that all materials<br />
supply to be completed with<strong>in</strong> three<br />
months from start<strong>in</strong>g <strong>of</strong> the contract.<br />
The environment sensitive materials<br />
will not be laid if they are not<br />
protected by subsequent layer.<br />
Payment will not be authorized for<br />
materials without execution.<br />
It is understood that the exist<strong>in</strong>g level<br />
<strong>in</strong> the dump site is chang<strong>in</strong>g and the<br />
contractor will carry out the works as<br />
the sections level<strong>in</strong>g for 3 meters cut<br />
and fill <strong>in</strong>dicated <strong>in</strong> the bill items.
ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 21<br />
<strong>Bill</strong> No. 5: Excavations<br />
Item no. Description Unit Quantity Rate Amount<br />
In the event that the quantity<br />
/measurement <strong>in</strong>dicated for some<br />
Item No.s should be reduced or<br />
entirely cancelled, the Contractor is<br />
not authorized to claim any loss <strong>in</strong><br />
pr<strong>of</strong>it.<br />
The soil <strong>in</strong> place is expla<strong>in</strong>ed <strong>in</strong> the<br />
Technical Specifications.<br />
The basis for the calculation <strong>of</strong> all<br />
positions shall be soil material<br />
characterized as ma<strong>in</strong>ly sandy (partly<br />
silty or gritty) materials, which allow<br />
excavation without blast<strong>in</strong>g.<br />
5.1 Excavat<strong>in</strong>g <strong>of</strong> soil, Leachate pond<br />
area<br />
The soil <strong>of</strong> the leachate pond area<br />
shall be excavated from all cutt<strong>in</strong>g<br />
pr<strong>of</strong>iles <strong>in</strong> the pla<strong>in</strong> ground area as<br />
well <strong>in</strong> the slope area accord<strong>in</strong>g to the<br />
Project Manager's requirements and<br />
<strong>in</strong> correspondence with the prevail<strong>in</strong>g<br />
pr<strong>of</strong>iles. The soil shall be loaded and<br />
transported and shall be <strong>in</strong>corporated<br />
and compacted as part <strong>of</strong> the support<br />
layer <strong>in</strong> all areas <strong>of</strong> the cell ST (subcells<br />
1 and 2).<br />
The soil <strong>in</strong> place is expla<strong>in</strong>ed <strong>in</strong> the<br />
Technical Specifications.<br />
The quantity <strong>of</strong> cleared soil shall be<br />
determ<strong>in</strong>ed by the measurement at<br />
the borrow area with the help <strong>of</strong><br />
digital model <strong>of</strong> the terra<strong>in</strong><br />
(tachymetric survey).<br />
m3 3,500
ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 22<br />
Item no. Description Unit Quantity Rate Amount<br />
5.2 Excavat<strong>in</strong>g <strong>of</strong> soil, seepage reservoir<br />
The soil <strong>of</strong> the seepage reservoir area shall<br />
be excavated from all cutt<strong>in</strong>g pr<strong>of</strong>iles <strong>in</strong><br />
the pla<strong>in</strong> ground area as well <strong>in</strong> the slope<br />
area accord<strong>in</strong>g to the Project Manager's<br />
requirements and <strong>in</strong> correspondence with<br />
the prevail<strong>in</strong>g pr<strong>of</strong>iles.<br />
The excavated soil shall become the<br />
property <strong>of</strong> the Contractor and shall be<br />
removed from site and shall be disposed<br />
<strong>of</strong> at the expense <strong>of</strong> the Contractor.<br />
<strong>Al</strong>l other works as expla<strong>in</strong>ed <strong>in</strong> item no.<br />
5.1.<br />
5.3 Excavat<strong>in</strong>g <strong>of</strong> soil, new hazardous<br />
waste area<br />
The soil <strong>of</strong> the new hazardous waste cell<br />
area shall be excavated <strong>in</strong> the pla<strong>in</strong><br />
ground area as well <strong>in</strong> the slope area<br />
accord<strong>in</strong>g to the Project Manager's<br />
requirements.<br />
The soil shall be loaded, transported,<br />
<strong>in</strong>corporated and compacted as part <strong>of</strong><br />
the support layer <strong>in</strong> all areas <strong>of</strong> the cell ST<br />
(sub-cells 1 and 2).<br />
Total area <strong>of</strong> new hazardous waste cell:<br />
2,500 m², depth: 2.0 m, slopes 1:2<br />
<strong>Al</strong>l other works as expla<strong>in</strong>ed <strong>in</strong> item no.<br />
5.1<br />
5.4 Waste shift<strong>in</strong>g on plateau area, sub-cell<br />
1<br />
Level<strong>in</strong>g <strong>of</strong> exist<strong>in</strong>g waste surface with<br />
suitable equipment on top <strong>of</strong> the total<br />
relatively flat plateau <strong>in</strong> the area <strong>of</strong> the<br />
(future base-sealed) sub-cell 1, <strong>in</strong>clud<strong>in</strong>g<br />
the transport <strong>of</strong> the disposed, ma<strong>in</strong>ly<br />
burned waste <strong>in</strong>side the plateau area.<br />
Thickness <strong>of</strong> fills and cuts: 0 to 3 m<br />
Waste pr<strong>of</strong>il<strong>in</strong>g with an <strong>in</strong>cl<strong>in</strong>ation <strong>of</strong><br />
about 1 %; a waste volume <strong>of</strong> about 5,000<br />
m³ has to be shifted (waste is cut and<br />
filled),allowed tolerance + 20 cm, <strong>in</strong> max<br />
m3 2,000<br />
m3 5,000<br />
m2<br />
45,000
ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 23<br />
Item no. Description Unit Quantity Rate Amount<br />
5.5 Waste shift<strong>in</strong>g on plateau area,<br />
sub-cell 2<br />
Level<strong>in</strong>g <strong>of</strong> exist<strong>in</strong>g waste surface<br />
with suitable equipment on top <strong>of</strong> the<br />
total relatively flat plateau <strong>in</strong> the area<br />
<strong>of</strong> the (future base-sealed) sub-cell 2,<br />
<strong>in</strong>clud<strong>in</strong>g the transport <strong>of</strong> the<br />
disposed, ma<strong>in</strong>ly burned waste <strong>in</strong>side<br />
the plateau area.<br />
Thickness <strong>of</strong> cut: 0 to 3 m<br />
Thickness <strong>of</strong> fill: 0 to 3 m<br />
Waste pr<strong>of</strong>il<strong>in</strong>g with an <strong>in</strong>cl<strong>in</strong>ation <strong>of</strong><br />
about 1.4 %; a waste volume <strong>of</strong> about<br />
12,000 m³ has to be shifted (waste is<br />
cut and filled),<br />
allowed tolerance + 20 cm, <strong>in</strong> max<br />
5.6 Waste shift<strong>in</strong>g <strong>in</strong> sloped area<br />
Exist<strong>in</strong>g waste <strong>in</strong> northern sloped<br />
areas has to be pr<strong>of</strong>iled accord<strong>in</strong>g to<br />
given plans and Project Managers<br />
requirements;<br />
Load<strong>in</strong>g and transport<strong>in</strong>g with<strong>in</strong> the<br />
<strong>landfill</strong> area form sub-cell 1 to sub-cell<br />
2 and <strong>in</strong>corporation <strong>in</strong>side the area <strong>of</strong><br />
sub-cell 2 accord<strong>in</strong>g to Project<br />
Managers requirements<br />
Height <strong>of</strong> waste cut: up to about 8 m<br />
Pr<strong>of</strong>il<strong>in</strong>g <strong>in</strong> sloped area with<br />
<strong>in</strong>cl<strong>in</strong>ation from 1:1.5 to 1:2.0<br />
Material: ma<strong>in</strong>ly burned waste<br />
m2<br />
45,000<br />
m3 16,000
ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 24<br />
Item no. Description Unit Quantity Rate Amount<br />
5.7 Soil <strong>in</strong>corporation, support layer<br />
Suitable soil (sandy-silty material)<br />
shall be supplied, <strong>in</strong>corporated and<br />
compacted <strong>in</strong> correspondence with<br />
the prevail<strong>in</strong>g pr<strong>of</strong>iles or as required<br />
by the Project Manager as follow:<br />
- Fill<strong>in</strong>g material <strong>in</strong> the northern and<br />
southern sloped area (for slope<br />
reduction and creat<strong>in</strong>g a<br />
homogenous shape <strong>of</strong> Cell ST)<br />
- Fill<strong>in</strong>g material for rais<strong>in</strong>g the northwestern<br />
part <strong>of</strong> Cell ST<br />
- Support layer<br />
- <strong>Dik</strong>e surround<strong>in</strong>g the disposal area<br />
The <strong>in</strong>corporation areas are sub-cell 1<br />
and sub-cell 2.<br />
The soil <strong>in</strong> place (excavation areas)<br />
respectively the soil necessary for the<br />
support layer is expla<strong>in</strong>ed <strong>in</strong> the<br />
Technical Specifications.<br />
The <strong>in</strong>corporation shall be carried out<br />
layer by layer as described <strong>in</strong> the<br />
Technical Specifications.<br />
Total thickness <strong>of</strong> the support layer to<br />
be <strong>in</strong>corporated is at least 0.5 m, <strong>in</strong><br />
slope areas up to 15 m.<br />
At the outside end <strong>of</strong> the support<br />
layer an end dike shall be pr<strong>of</strong>iled<br />
accord<strong>in</strong>g to detail plan C-01.<br />
With each layer or at a m<strong>in</strong>imum <strong>of</strong><br />
3,000 m3 <strong>in</strong>corporated soil a test for<br />
the deformation module EV2 has to<br />
be carried out by the contractor (unit<br />
price given <strong>in</strong> item no. 2.1 and 2.2).<br />
Copies <strong>of</strong> the protocols shall be given<br />
to the Project Manager.<br />
The quantity <strong>of</strong> compacted soil shall<br />
be determ<strong>in</strong>ed by the measurement<br />
at the <strong>in</strong>corporation area with the<br />
help <strong>of</strong> digital model <strong>of</strong> the terra<strong>in</strong><br />
(tachymetry survey).<br />
m3 430,000
ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 25<br />
Item no. Description Unit Quantity Rate Amount<br />
5.8 Soil <strong>in</strong>corporation, leachate pond<br />
area<br />
Suitable soil (sandy-silty material)<br />
shall be supplied and <strong>in</strong>corporated<br />
Area <strong>of</strong> <strong>in</strong>corporation: leachate pond<br />
area with its access road, all other<br />
works as expla<strong>in</strong>ed <strong>in</strong> item no. 5.7. m3 200<br />
5.9 Soil <strong>in</strong>corporation, support layer<br />
for temporary leachate pipes<br />
Suitable soil (sandy-silty material)<br />
shall be supplied and <strong>in</strong>corporated<br />
Area <strong>of</strong> <strong>in</strong>corporation: base grade for<br />
temporary leachate pipes <strong>in</strong>side the<br />
southern sloped area <strong>of</strong> Cell ST,<br />
length about 120 m, horizontal width:<br />
1.0 m,<br />
all other works as expla<strong>in</strong>ed <strong>in</strong> item<br />
no. 5.7.<br />
5.10 Extra Charge for Production <strong>of</strong> a<br />
Deepen<strong>in</strong>g<br />
Extra charge regard<strong>in</strong>g earthworks for<br />
the production <strong>of</strong> a deepen<strong>in</strong>g<br />
(cavity) <strong>in</strong> the area <strong>of</strong> the leachate<br />
pipes on excavated/<strong>in</strong>corporated soil<br />
or made ground.<br />
Width <strong>of</strong> deepen<strong>in</strong>g <strong>in</strong> the centre 4 m,<br />
depth from 0.1 m up to 0.35 m.<br />
5.11 Compact<strong>in</strong>g <strong>of</strong> the subsoil<br />
The subsoil shall be compacted <strong>in</strong><br />
areas before <strong>in</strong>corporation <strong>of</strong> earth<br />
material starts.<br />
The soil <strong>in</strong> place is expla<strong>in</strong>ed <strong>in</strong> the<br />
Technical Specifications.<br />
Specified compaction degree Dpr <strong>of</strong><br />
m<strong>in</strong>. 95% or 97 % (depend<strong>in</strong>g <strong>of</strong> the<br />
soil <strong>in</strong> place).<br />
Unit price for test is given <strong>in</strong> item 2.1<br />
and 2.2.<br />
Execut<strong>in</strong>g shall be carried out <strong>in</strong><br />
sections <strong>of</strong> different sizes.<br />
m3 300<br />
m 1,700<br />
m2 15,000
ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 26<br />
Item no. Description Unit Quantity Rate Amount<br />
5.12 Production <strong>of</strong> the base <strong>of</strong> the <strong>landfill</strong><br />
site, pla<strong>in</strong> base areas<br />
Base <strong>of</strong> the <strong>landfill</strong> site <strong>in</strong>clud<strong>in</strong>g the<br />
leachate pond shall be produced <strong>in</strong> the<br />
pla<strong>in</strong> base areas to create a plane on top<br />
<strong>of</strong> the support layer <strong>in</strong> sub-cell 1 and<br />
sub-cell 2 and under the m<strong>in</strong>eral seal<strong>in</strong>g<br />
layer <strong>of</strong> the leachate pond.<br />
Longitud<strong>in</strong>al gradient <strong>of</strong> the pla<strong>in</strong> base is<br />
about 1 %. Permitted deviation from<br />
specified height: +/- 3 cm.<br />
Verification is carried out via the digital<br />
model <strong>of</strong> the terra<strong>in</strong> (tachymeric survey).<br />
The result<strong>in</strong>g costs shall be <strong>in</strong>cluded <strong>in</strong><br />
the standard unit price.<br />
m2 90,000<br />
5.13 Production <strong>of</strong> the base <strong>of</strong> the <strong>landfill</strong><br />
site, slope areas<br />
Base <strong>of</strong> the <strong>landfill</strong> site <strong>in</strong>clud<strong>in</strong>g the<br />
leachate pond shall be produced <strong>in</strong> the<br />
slope areas to create a plane on top <strong>of</strong><br />
the support layer <strong>in</strong> sub-cell 1 and subcell<br />
2 and under the m<strong>in</strong>eral seal<strong>in</strong>g layer<br />
<strong>of</strong> the leachate pond.<br />
Slope gradient 1:2 to 1:2.5.; all other<br />
works as expla<strong>in</strong>ed <strong>in</strong> item no. 5.12.<br />
m2 6,000<br />
5.14 M<strong>in</strong>eral seal<strong>in</strong>g, base area <strong>of</strong> the<br />
leachate pond<br />
M<strong>in</strong>eral l<strong>in</strong>er made from strongly<br />
cohesive clay material shall be supplied<br />
and <strong>in</strong>corporated <strong>in</strong> a layer <strong>of</strong> 0.44 m<br />
accord<strong>in</strong>g to the prevail<strong>in</strong>g pr<strong>of</strong>ile and<br />
shall be compacted such that after<br />
compact<strong>in</strong>g and under consideration <strong>of</strong><br />
tolerances the m<strong>in</strong>. required layer<br />
thickness <strong>of</strong> 40 cm shall be kept at all<br />
po<strong>in</strong>ts. The material must have a<br />
coefficient <strong>of</strong> permeability equal or<br />
below 1 x 10-8 m/s. Incorporation <strong>in</strong>to<br />
the pla<strong>in</strong> base area <strong>of</strong> the leachate pond.<br />
Specified compaction degree Dpr >=<br />
95%. The material to be compacted shall<br />
be supplied by a secondary storage site<br />
<strong>of</strong> the Contractor. The required tests will<br />
be remunerated accord<strong>in</strong>g to Section 2. m2 2,000
ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 27<br />
Item<br />
Description Unit Quantit<br />
no.<br />
y<br />
5.15 M<strong>in</strong>eral seal<strong>in</strong>g, slope areas <strong>of</strong> the<br />
leachate pond<br />
M<strong>in</strong>eral l<strong>in</strong>er shall be supplied and<br />
<strong>in</strong>corporated <strong>in</strong> a layer <strong>of</strong> 0.44 m accord<strong>in</strong>g<br />
to the prevail<strong>in</strong>g pr<strong>of</strong>ile and shall be<br />
compacted.<br />
Total thickness <strong>of</strong> layer to be <strong>in</strong>corporated<br />
0.44 m, however m<strong>in</strong>. 0.40 m.<br />
Incorporation <strong>in</strong> the slope area <strong>of</strong> the<br />
leachate pond, Slope gradient: 1:2<br />
<strong>Al</strong>l other works as expla<strong>in</strong>ed <strong>in</strong> item no.<br />
5.14.<br />
m2 2,000<br />
5.16 M<strong>in</strong>eral seal<strong>in</strong>g, base area <strong>of</strong> Cell ST<br />
M<strong>in</strong>eral seal<strong>in</strong>g layer made from strongly<br />
b<strong>in</strong>d<strong>in</strong>g clay material has to be delivered<br />
and <strong>in</strong>corporated <strong>in</strong> layers <strong>of</strong> 0.27 m (after<br />
compaction) accord<strong>in</strong>g to the prevail<strong>in</strong>g<br />
pr<strong>of</strong>ile and has to be compacted layer by<br />
layer (2 layers) such that after compact<strong>in</strong>g<br />
and under consideration <strong>of</strong> tolerances the<br />
m<strong>in</strong>imal required layer thickness <strong>of</strong> 25 cm<br />
has to be kept at all po<strong>in</strong>ts.<br />
The material must have a coefficient <strong>of</strong><br />
permeability below 1 x 10-8 m/s.<br />
Total thickness <strong>of</strong> layers to be<br />
<strong>in</strong>corporated 0.55 m, however m<strong>in</strong>imal<br />
0.50 m.<br />
Incorporation <strong>in</strong>to the base (bottom) area<br />
<strong>of</strong> Cell ST<br />
Specified compaction degree Dpr >= 95%<br />
The material to be compacted has to be<br />
supplied by a temporary storage area <strong>of</strong><br />
the Contractor. The Contractor must certify<br />
that the quality and quantity are sufficient.<br />
The material has to be cont<strong>in</strong>uously<br />
verified accord<strong>in</strong>g to the specifications <strong>of</strong><br />
an <strong>in</strong>dependent geotechnical <strong>in</strong>stitute.<br />
The required tests will be paid accord<strong>in</strong>g<br />
to Section 2.<br />
m2 88,000<br />
Rate Amount
ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 28<br />
Item no. Description Unit Quantity Rate Amount<br />
5.17 M<strong>in</strong>eral seal<strong>in</strong>g, slope area Cell ST<br />
M<strong>in</strong>eral l<strong>in</strong>er shall be supplied and<br />
<strong>in</strong>corporated <strong>in</strong> two layer <strong>of</strong> 0.27 m,<br />
each accord<strong>in</strong>g to the prevail<strong>in</strong>g<br />
pr<strong>of</strong>ile and shall be compacted.<br />
Total thickness <strong>of</strong> layer to be<br />
<strong>in</strong>corporated 0.55 m, however m<strong>in</strong>.<br />
0.50 m.<br />
Incorporation <strong>in</strong> the slope area <strong>of</strong> Cell<br />
ST, Slope gradient: 1:2.5<br />
<strong>Al</strong>l other works as expla<strong>in</strong>ed <strong>in</strong> item<br />
no. 5.16.<br />
m2 4,000<br />
5.18 Sand 0/2 for leachate pipe support<br />
Sand 0/2 mm shall be supplied,<br />
<strong>in</strong>corporated and compacted for the<br />
bedd<strong>in</strong>g <strong>of</strong> leachate dra<strong>in</strong> pipes and<br />
leachate ma<strong>in</strong> pipes,<br />
The material shall be <strong>in</strong>corporated<br />
between two geotextiles <strong>in</strong> the area<br />
<strong>of</strong> the deepen<strong>in</strong>g produced.<br />
Width <strong>of</strong> <strong>in</strong>corporation is approx. 5 m,<br />
thickness <strong>of</strong> <strong>in</strong>corporation 0 to 30 cm. m3 1,700<br />
5.19 Trench, leachate collection pipe<br />
Excavation <strong>of</strong> trenches <strong>in</strong>clud<strong>in</strong>g the<br />
production <strong>of</strong> a base grade for the<br />
ma<strong>in</strong> leachate pipe.<br />
The accounted depth <strong>of</strong> excavation<br />
shall be calculated by tak<strong>in</strong>g the<br />
measure <strong>of</strong> the surface <strong>of</strong> the trench<br />
section which is to be excavated<br />
down to the planned base <strong>of</strong> this<br />
section (lower edge <strong>of</strong> pipe support).<br />
The accounted width <strong>of</strong> trenches shall<br />
be calculated on basis <strong>of</strong> the external<br />
diameter <strong>of</strong> the pipe + 60 cm.<br />
The soil <strong>in</strong> place is expla<strong>in</strong>ed <strong>in</strong> the<br />
Technical Specifications.
ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 29<br />
Item no. Description Unit Quantity Rate Amount<br />
The soil shall be stored temporarily, if<br />
this is necessary, loaded, transported<br />
and <strong>in</strong>corporated as trench fill<strong>in</strong>g<br />
accord<strong>in</strong>gly. Surplus soil or soil which<br />
is unsuitable for fill<strong>in</strong>g purposes shall<br />
become the property <strong>of</strong> the<br />
Contractor and shall be removed from<br />
site and shall be disposed <strong>of</strong> on<br />
expense <strong>of</strong> the Contractor.<br />
Excavation <strong>of</strong> trench for leachate<br />
ma<strong>in</strong> pipes with an <strong>in</strong>ternal diameter<br />
<strong>of</strong> 400 mm, total depth <strong>of</strong> the<br />
trenches vary<strong>in</strong>g from 0.5 m to about<br />
2.0 m.<br />
m3 50<br />
5.20 Sand 0/8 for Pipe Embedment <strong>of</strong><br />
Leachate Collection Pipes<br />
Sand 0/8 mm shall be supplied,<br />
<strong>in</strong>corporated and compacted as pipe<br />
embedment <strong>of</strong> leachate ma<strong>in</strong> pipes<br />
outside the <strong>landfill</strong>.<br />
The material shall be <strong>in</strong>corporated<br />
under trench conditions and also<br />
under dam conditions.<br />
The accounted width <strong>of</strong> the pipe<br />
embedment shall be calculated<br />
accord<strong>in</strong>g to the respective trench<br />
width (trench conditions). Under dam<br />
conditions the pipe must be covered<br />
30 cm on both sides with embedment<br />
material.<br />
The thickness <strong>of</strong> the pipe support<br />
shall be l5 cm. The depth <strong>of</strong> coverage<br />
above the pipe shall be 30 cm.<br />
m3 150<br />
Total for <strong>Bill</strong> No. 5<br />
(carried forward to Summary)
ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 30<br />
<strong>Bill</strong> No. 6: Bentonite Mat<br />
Item no. Description Unit Quantity Rate Amount<br />
6.1 Geo-synthetic clay l<strong>in</strong>er (GCL), pla<strong>in</strong><br />
base <strong>of</strong> new hazardous waste cell<br />
A geo-synthetic clay l<strong>in</strong>er (GCL) shall<br />
be supplied and <strong>in</strong>stalled <strong>in</strong><br />
accordance with manufacturer's<br />
guidel<strong>in</strong>es on the pla<strong>in</strong> base areas <strong>of</strong><br />
the new hazardous waste cell.<br />
The GCL shall be a geo-synthetic clay<br />
l<strong>in</strong>er <strong>in</strong> geocomposite sandwich<br />
format.<br />
The seal<strong>in</strong>g efficiency shall ne based<br />
on a high-swell activated sodium<br />
bentonite layer.<br />
Both carrier- and cover geotextiles <strong>of</strong><br />
the geocomposite shall be PP-woven<br />
materials with high friction surface<br />
coat<strong>in</strong>g, each approx. 450 g/m².<br />
Between the top and bottom<br />
geotextile shall be a 60 g/m²<br />
support<strong>in</strong>g polyester-aer<strong>of</strong>leece, <strong>in</strong>to<br />
which 4,500 g/m² <strong>of</strong> dry high-swell<br />
sodium bentonite powder shall be<br />
placed.<br />
<strong>Al</strong>l layers shall be strongly bound<br />
together by sew<strong>in</strong>g.<br />
Material properties:<br />
� carrier- and cover geotextile:<br />
PP-woven, with high friction<br />
surface coat<strong>in</strong>g<br />
� support<strong>in</strong>g layer:<br />
60 g “aero fleece<br />
� seal<strong>in</strong>g layer:<br />
approx. 4.500 g/m² activated<br />
sodium bentonite<br />
� total weight per unit area (EN<br />
965):<br />
approx. 5.500 g/m²<br />
� Tensile strength (EN ISO 10 319):<br />
approx. 20/30 kN/m (long./trans.)<br />
� Stra<strong>in</strong> at nom<strong>in</strong>al strength:<br />
< 25/25 % (long./trans.)
ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 31<br />
Item no. Description Unit Quantity Rate Amount<br />
� CBR puncture resistance (EN ISO<br />
12236):<br />
3,500 N<br />
� thickness (dry condition EN ISO<br />
9863-2):<br />
8.0 mm<br />
� <strong>in</strong>ternal shear resistance <strong>of</strong><br />
hydrated GCL (direct shear test)<br />
� Angle <strong>of</strong> friction: 36 °<br />
� Cohesion: 25 kN/m²<br />
� Permeability coefficient at 30 kPa<br />
load and 300 mm water head:<br />
5 x 10-11 m/s<br />
The mechanical properties <strong>of</strong> the GCL<br />
shall be verified by both <strong>in</strong>ternal<br />
quality assurance and external quality<br />
control and assurance by an<br />
<strong>in</strong>dependent authorised laboratory.<br />
The production <strong>of</strong> the supplier shall<br />
be EN ISO 9001:2000 certified. Each<br />
roll should have at least one<br />
identification label with roll number<br />
and product type <strong>in</strong> accordance to EN<br />
10320<br />
An adequate <strong>in</strong>surance cover<strong>in</strong>g the<br />
performance risks <strong>of</strong> the GCL related<br />
to product defaults shall be provided<br />
by the supplier.<br />
m2 1,700<br />
6.2 Geo-synthetic clay l<strong>in</strong>er (GCL),<br />
slope area <strong>of</strong> new hazardous waste<br />
cell<br />
A geo-synthetic clay l<strong>in</strong>er (GCL) shall<br />
be supplied and <strong>in</strong>stalled <strong>in</strong><br />
accordance with manufacturer's<br />
guidel<strong>in</strong>es on the slope areas <strong>of</strong> the<br />
new hazardous waste cell (slopes<br />
about 1:2.5, partly 1:2).<br />
<strong>Al</strong>l other works as expla<strong>in</strong>ed <strong>in</strong> item<br />
no. 6.1.<br />
m2 800<br />
Total for <strong>Bill</strong> No. 6<br />
(carried forward to Summary)
ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 32<br />
<strong>Bill</strong> No. 7: Geo-membrane<br />
Item no. Description Unit Quantity Rate Amount<br />
7.1 Geo-membrane layer, pla<strong>in</strong> base<br />
areas<br />
A flexible geo-membrane made from<br />
PEHD shall be supplied, laid and<br />
<strong>in</strong>stalled (welded) <strong>in</strong> accordance with<br />
manufacturer's guidel<strong>in</strong>es on the<br />
m<strong>in</strong>eral seal<strong>in</strong>g <strong>in</strong> the pla<strong>in</strong> base areas<br />
<strong>of</strong> the <strong>landfill</strong> site.<br />
The sheet<strong>in</strong>gs shall be laid out <strong>in</strong> full<br />
size and pla<strong>in</strong> on the base <strong>of</strong> <strong>landfill</strong><br />
site. No wr<strong>in</strong>kl<strong>in</strong>g is allowed. The<br />
overlaps <strong>in</strong> longitud<strong>in</strong>al and<br />
transverse direction shall be m<strong>in</strong>. 15<br />
cm. Only the ground covered by the<br />
geotextile shall be remunerated, the<br />
overlapp<strong>in</strong>g part shall be <strong>in</strong>cluded <strong>in</strong><br />
the standard price.<br />
The weld<strong>in</strong>g seams shall be executed<br />
as double seams with <strong>in</strong>spection<br />
channel. Each weld<strong>in</strong>g seam shall be<br />
tested for impermeability and<br />
cohesiveness accord<strong>in</strong>g to the<br />
exist<strong>in</strong>g regulations. A protocol for<br />
each seam test shall be given to the<br />
Project Manager.<br />
When the sheet<strong>in</strong>gs are welded<br />
attention has to be paid to restrictions<br />
due to unsuitable weather conditions.<br />
That the chemical resistance and<br />
physical properties shall be verified <strong>in</strong><br />
accordance with the relevant<br />
regulations (such as ASTM D 1593,<br />
ASTM D 638, etc.).<br />
The MFI Index (MFI 190/5) <strong>of</strong> the<br />
flexible geo-membrane layers shall be<br />
more than 2.<br />
Thickness <strong>of</strong> geo-membrane layer<br />
shall m<strong>in</strong>. 1.5 mm, the width <strong>of</strong> a layer<br />
shall be 5 m.<br />
m2 88,000
ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 33<br />
Item no. Description Unit Quantity Rate Amount<br />
7.2 Geo-membrane layer, slope areas<br />
A flexible geo-membrane made from<br />
PEHD shall be supplied, laid and<br />
<strong>in</strong>stalled (welded) <strong>in</strong> accordance with<br />
manufacturer's guidel<strong>in</strong>es on the<br />
m<strong>in</strong>eral seal<strong>in</strong>g <strong>in</strong> the slope areas <strong>of</strong><br />
the <strong>landfill</strong> site (slopes about 1:2.5).<br />
<strong>Al</strong>l other works as expla<strong>in</strong>ed <strong>in</strong> item<br />
no. 7.1.<br />
7.3 Geo-membrane layer, leachate<br />
pond, pla<strong>in</strong> base<br />
A flexible geo-membrane made from<br />
PEHD shall be supplied, laid and<br />
<strong>in</strong>stalled (welded) <strong>in</strong> accordance with<br />
manufacturer's guidel<strong>in</strong>es on the<br />
m<strong>in</strong>eral seal<strong>in</strong>g <strong>in</strong> the pla<strong>in</strong> base area<br />
<strong>of</strong> the leachate pond.<br />
<strong>Al</strong>l other works as expla<strong>in</strong>ed <strong>in</strong> item<br />
no. 7.1.<br />
7.4 Geo-membrane layer, leachate<br />
pond, slope areas<br />
A flexible geo-membrane made from<br />
PEHD shall be supplied, laid and<br />
<strong>in</strong>stalled (welded) <strong>in</strong> accordance with<br />
manufacturer's guidel<strong>in</strong>es on the<br />
m<strong>in</strong>eral seal<strong>in</strong>g <strong>in</strong> the pla<strong>in</strong> slope<br />
areas <strong>of</strong> the leachate pond (slopes<br />
1:2).<br />
<strong>Al</strong>l other works as expla<strong>in</strong>ed <strong>in</strong> item<br />
no. 7.1.<br />
7.5 Geo-membrane layer, new<br />
hazardous waste cell, pla<strong>in</strong> base<br />
A flexible geo-membrane made from<br />
PEHD shall be supplied, laid and<br />
<strong>in</strong>stalled (welded) <strong>in</strong> accordance with<br />
manufacturer's guidel<strong>in</strong>es on the<br />
bentonite mat <strong>in</strong> the pla<strong>in</strong> base area<br />
<strong>of</strong> the new hazardous waste cell.<br />
<strong>Al</strong>l other works as expla<strong>in</strong>ed <strong>in</strong> item<br />
no. 7.1.<br />
m2<br />
4,000<br />
m2 2,000<br />
m2<br />
2,000<br />
m2 1,700
ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 34<br />
7.6 Geo-membrane layer, new<br />
hazardous waste cell, slope areas<br />
A flexible geo-membrane made from<br />
PEHD shall be supplied, laid and<br />
<strong>in</strong>stalled (welded) <strong>in</strong> accordance with<br />
manufacturer's guidel<strong>in</strong>es on the<br />
bentonite mat <strong>in</strong> the pla<strong>in</strong> slope areas<br />
<strong>of</strong> the new hazardous waste cell<br />
(slopes 1:2).<br />
<strong>Al</strong>l other works as expla<strong>in</strong>ed <strong>in</strong> item<br />
no. 7.1.<br />
7.7 Open<strong>in</strong>g to lead through pipe<br />
d=315 mm / d = 250 mm<br />
The above mentioned geo-membrane<br />
shall be <strong>in</strong>stalled <strong>in</strong> a way that an<br />
open<strong>in</strong>g can be produced which<br />
allows to lead through PE-HD pipes<br />
with an external diameter <strong>of</strong> 315 mm<br />
respectively <strong>in</strong>ternal diameter <strong>of</strong> 250<br />
mm (e. a. leachate dra<strong>in</strong> pipe) <strong>in</strong> the<br />
area <strong>of</strong> the outside dams <strong>of</strong> the<br />
support layer as well as <strong>in</strong> the outlet<br />
<strong>of</strong> the leachate pond.<br />
The <strong>in</strong>corporation shall be carried out<br />
impermeable accord<strong>in</strong>g to the<br />
manufacturer's guidel<strong>in</strong>es.<br />
7.8 Open<strong>in</strong>g to lead through Pipe<br />
d=400 mm / d = 350 mm<br />
The above mentioned geo-membrane<br />
shall be <strong>in</strong>stalled <strong>in</strong> a way that an<br />
open<strong>in</strong>g can be produced which<br />
allows a lead<strong>in</strong>g through PE-HD pipes<br />
with an external diameter <strong>of</strong> 400 mm<br />
respectively <strong>in</strong>ternal diameter <strong>of</strong> 350<br />
mm (f. e. leachate ma<strong>in</strong> pipe) <strong>in</strong> the<br />
area <strong>of</strong> the outside dams <strong>of</strong> the<br />
support layer as well as <strong>in</strong> the <strong>in</strong>let <strong>of</strong><br />
the leachate pond.<br />
The <strong>in</strong>corporation shall be carried out<br />
impermeable accord<strong>in</strong>g to the<br />
manufacturer's guidel<strong>in</strong>es.<br />
m2 800<br />
pieces 11<br />
pieces 7
ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 35<br />
Item no. Description Unit Quantity Rate Amount<br />
7.9 Extra charge for embedd<strong>in</strong>g geomembrane<br />
Extra charge for embedd<strong>in</strong>g the<br />
above mentioned geo-membrane <strong>in</strong><br />
the m<strong>in</strong>eral seal<strong>in</strong>g layer on the upper<br />
edge <strong>of</strong> the leachate pond accord<strong>in</strong>g<br />
to the relevant detail draw<strong>in</strong>g and to<br />
the Project Manager's requirements.<br />
The payment has to be calculated<br />
based on l<strong>in</strong>ear meters <strong>of</strong> embedd<strong>in</strong>g.<br />
<strong>Al</strong>l costs for the required works and<br />
services to be supplied for this<br />
process have to be <strong>in</strong>cluded <strong>in</strong> the<br />
standard price.<br />
The embedd<strong>in</strong>g must be also done for<br />
the new hazardous waste cell<br />
m 440<br />
Total for <strong>Bill</strong> No. 7<br />
(carried forward to Summary)
ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 36<br />
<strong>Bill</strong> No. 8: Geo-textiles<br />
Item no. Description Unit Quantity Rate Amount<br />
8.1 Geo-textile 400 g/m2, seal<strong>in</strong>g <strong>of</strong><br />
sand bed<br />
A geo-textile shall be supplied and<br />
laid out as a cover layer for the sand<br />
bed <strong>in</strong> the area <strong>of</strong> the leachate pipes<br />
and leachate ma<strong>in</strong> pipes and as cover<br />
<strong>in</strong> the area <strong>of</strong> the end <strong>of</strong> the base<br />
seal<strong>in</strong>g system.<br />
Overlaps <strong>in</strong> longitud<strong>in</strong>al and<br />
transverse direction shall be m<strong>in</strong>. 50<br />
cm.<br />
Only the ground covered by the geotextile<br />
shall be remunerated, the<br />
overlapp<strong>in</strong>g parts shall be <strong>in</strong>cluded <strong>in</strong><br />
the standard price.<br />
The geo-textile shall be made <strong>of</strong><br />
mechanically bonded polypropylene<br />
filaments.<br />
The geo-textile shall be made <strong>of</strong><br />
mechanically bonded PEHD filaments.<br />
The chemical resistance and the<br />
physical properties <strong>in</strong> accordance<br />
with the relevant regulations (such as<br />
EN 10319, EN ISO 12236 etc.) shall be<br />
verified by both <strong>in</strong>ternal quality<br />
assurance and external quality control<br />
and assurance by an <strong>in</strong>dependent<br />
authorised laboratory.<br />
The strip tensile strength accord<strong>in</strong>g to<br />
EN ISO 10319 shall be m<strong>in</strong>. 20 kN/m<br />
(mach<strong>in</strong>e direction/cross mach<strong>in</strong>e<br />
direction)<br />
The specific weight <strong>of</strong> the geo-textile<br />
shall be about 400 g/m2.<br />
m2 12,000
ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 37<br />
Item no. Description Unit Quantit<br />
y<br />
8.2 Open<strong>in</strong>g to lead through pipes<br />
The above mentioned geo-textile<br />
with weight <strong>of</strong> 400 g/m2 shall be<br />
<strong>in</strong>stalled <strong>in</strong> a way that an open<strong>in</strong>g can<br />
be produced which allows to lead<br />
through PE-HD pipes with an external<br />
diameter <strong>of</strong> 400 mm resp. <strong>in</strong>ternal<br />
diameter <strong>of</strong> 350 mm (leachate<br />
collection pipe) or 315 mm (leachate<br />
dra<strong>in</strong> pipes) resp. <strong>in</strong>ternal diameter <strong>of</strong><br />
250 mm to lead the pipe out <strong>of</strong> the<br />
<strong>landfill</strong> site.<br />
The <strong>in</strong>corporation shall be carried out<br />
accord<strong>in</strong>g to the manufacturer's<br />
guidel<strong>in</strong>es.<br />
pieces 13<br />
8.3 Geo-textile 1,200 g/m2, pla<strong>in</strong> base<br />
<strong>of</strong> <strong>landfill</strong> site<br />
A geo-textile shall be supplied and<br />
laid out as a protection layer above<br />
the geo-membrane <strong>in</strong> the pla<strong>in</strong> base<br />
areas <strong>of</strong> the <strong>landfill</strong> site <strong>in</strong> accordance<br />
with the manufacturer’s guidel<strong>in</strong>es.<br />
Overlaps <strong>in</strong> longitud<strong>in</strong>al and<br />
transverse direction shall be m<strong>in</strong>. 50<br />
cm.<br />
Only the ground covered by the geotextile<br />
shall be remunerated, the<br />
overlapp<strong>in</strong>g parts shall be <strong>in</strong>cluded <strong>in</strong><br />
the standard price.<br />
The geo-textile shall be made <strong>of</strong><br />
mechanically bonded PEHD filaments.<br />
The chemical resistance and the<br />
physical properties <strong>in</strong> accordance<br />
with the relevant regulations (such as<br />
EN 10319, EN ISO 12236 etc.) shall be<br />
verified by both <strong>in</strong>ternal quality<br />
assurance and external quality control<br />
and assurance by an <strong>in</strong>dependent<br />
authorised laboratory.<br />
The specific weight <strong>of</strong> the geo-textile<br />
shall be m<strong>in</strong>. 1,200 g/m2.<br />
m2 88,000<br />
Rate Amount
ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 38<br />
Item<br />
Description Unit Quanti<br />
no.<br />
ty<br />
8.4 Geo-textile 1,200 g/m2, pla<strong>in</strong> base <strong>of</strong><br />
leachate pond<br />
A geo-textile shall be supplied and laid out<br />
as a protection layer above the geomembrane<br />
<strong>in</strong> the pla<strong>in</strong> base areas <strong>of</strong> the<br />
leachate pond.<br />
<strong>Al</strong>l other works as expla<strong>in</strong>ed <strong>in</strong> item no. 8.3. m2 2,000<br />
8.5 Geo-textile 1,200 g/m2, pla<strong>in</strong> base <strong>of</strong><br />
new hazardous waste cell<br />
A geo-textile shall be supplied and laid out<br />
as a protection layer above the geomembrane<br />
<strong>in</strong> the pla<strong>in</strong> base areas <strong>of</strong> the<br />
new hazardous waste cell.<br />
<strong>Al</strong>l other works as expla<strong>in</strong>ed <strong>in</strong> item no. 8.3. m2 1,700<br />
8.6 Geo-textile 1,200 g/m2, slope areas <strong>of</strong><br />
<strong>landfill</strong> site and leachate pond<br />
A geo-textile shall be supplied and laid out<br />
as a protection layer above the geomembrane<br />
<strong>in</strong> the slope areas <strong>of</strong> the <strong>landfill</strong><br />
site and the leachate pond.<br />
<strong>Al</strong>l other works as expla<strong>in</strong>ed <strong>in</strong> item no. 8.3.<br />
8.7 Geo-textile 1,200 g/m2, slope area <strong>of</strong><br />
new hazardous waste cell<br />
A geo-textile shall be supplied and laid out<br />
as a protection layer above the geomembrane<br />
<strong>in</strong> the slope areas <strong>of</strong> the new<br />
hazardous waste cell.<br />
<strong>Al</strong>l other works as expla<strong>in</strong>ed <strong>in</strong> item no. 8.3.<br />
8.8 Open<strong>in</strong>g to lead through pipe d=400 mm<br />
The above mentioned geo-textile with<br />
weight <strong>of</strong> 1,200 g/m2 shall be <strong>in</strong>stalled <strong>in</strong> a<br />
way that an open<strong>in</strong>g can be produced<br />
which allows to lead through PE-HD pipes<br />
with an external diameter <strong>of</strong> 400 mm<br />
respectively with an <strong>in</strong>ternal diameter <strong>of</strong><br />
350 mm <strong>in</strong> the area <strong>of</strong> the separat<strong>in</strong>g dams<br />
or the leachate pond. The <strong>in</strong>corporation<br />
shall be carried out accord<strong>in</strong>g to the<br />
manufacturer's guidel<strong>in</strong>es.<br />
m2<br />
m2<br />
pieces 7<br />
12,000<br />
800<br />
Rate Amount
ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 39<br />
Item no. Description Unit Quanti<br />
ty<br />
Rate Amount<br />
8.9 Open<strong>in</strong>g to lead through pipe d=315<br />
mm<br />
The above mentioned geo-textile with<br />
weight <strong>of</strong> 1,200 g/m2 shall be <strong>in</strong>stalled<br />
<strong>in</strong> a way that an open<strong>in</strong>g can be<br />
produced which allows to lead through<br />
PE-HD pipes with an external diameter<br />
<strong>of</strong> 315 mm respectively with an <strong>in</strong>ternal<br />
diameter <strong>of</strong> 250 mm <strong>in</strong> the area <strong>of</strong> the<br />
separat<strong>in</strong>g dams and the leachate pond.<br />
The <strong>in</strong>corporation shall be carried out<br />
accord<strong>in</strong>g to the manufacturer's<br />
guidel<strong>in</strong>es.<br />
pieces 11<br />
8.10 Extra charge for embedd<strong>in</strong>g<br />
geotextile<br />
Extra charge for embedd<strong>in</strong>g the above<br />
mentioned geotextile with weight<br />
1,200 g/m2 <strong>in</strong> the m<strong>in</strong>eral seal<strong>in</strong>g layer<br />
on the upper edge <strong>of</strong> the leachate pond<br />
accord<strong>in</strong>g to the relevant detail draw<strong>in</strong>g<br />
and to the Project Manager's<br />
requirements.<br />
The end <strong>of</strong> the geo-membrane shall be<br />
covered with suitable soil.<br />
The payment has to be calculated based<br />
on l<strong>in</strong>ear meters <strong>of</strong> embedd<strong>in</strong>g.<br />
<strong>Al</strong>l costs for the required works and<br />
services to be supplied for this process<br />
have to be <strong>in</strong>cluded <strong>in</strong> the standard<br />
price.<br />
The embedd<strong>in</strong>g must be also done for<br />
the new hazardous waste cell<br />
m 440<br />
Total for <strong>Bill</strong> No. 8<br />
(carried forward to Summary)
ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 40<br />
<strong>Bill</strong> No. 9: Dra<strong>in</strong>age layer<br />
Item no. Description Unit Quantity Rate Amount<br />
9.1 Filter gravel 16/32 mm, pla<strong>in</strong> base<br />
areas<br />
A surface filter made <strong>of</strong> filter gravel<br />
16/32 mm shall be supplied and<br />
<strong>in</strong>corporated on the geotextile <strong>in</strong> the<br />
pla<strong>in</strong> base areas <strong>of</strong> the <strong>landfill</strong> site.<br />
Prior the <strong>in</strong>corporation, a qualification<br />
exam<strong>in</strong>ation <strong>of</strong> the material used shall<br />
be supplied by the Contractor.<br />
The thickness <strong>of</strong> the layer applied<br />
shall be m<strong>in</strong>. 30 cm. The CaCO3content<br />
<strong>of</strong> the material shall be<br />
smaller than 20%.<br />
Installation shall be carried out as<br />
described below:<br />
Application <strong>of</strong> gravel shall be started<br />
from the edge <strong>of</strong> the application area.<br />
The application device must always<br />
stand on the already applied filter<br />
gravel and it shall distribute the<br />
material to be applied from this<br />
position.<br />
The application device must never be<br />
positioned onto the geotextile. m2 88,000<br />
9.2 Filter gravel 16/32 mm, slope areas<br />
A surface filter made <strong>of</strong> filter gravel<br />
16/32 mm shall be supplied and<br />
<strong>in</strong>corporated on the geotextile on<br />
slope areas <strong>of</strong> the <strong>landfill</strong> site and on<br />
the separation dams, slope gradient<br />
1:2 to 1:2.5, all other works as<br />
expla<strong>in</strong>ed <strong>in</strong> item 9.1.<br />
m2 4,000
ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 41<br />
Item no. Description Unit Quantity Rate Amount<br />
9.3 Filter gravel 16/32 mm, protection<br />
dam above dra<strong>in</strong> pipes<br />
Filter gravel 16/32 mm shall be<br />
supplied and <strong>in</strong>corporated as a<br />
protection dam above the leachate<br />
dra<strong>in</strong> pipes and the leachate ma<strong>in</strong><br />
pipe.<br />
The height <strong>of</strong> dam shall be from<br />
0.60m to 0.80m above the pipes, the<br />
slope gradient shall be 1:1.5, the<br />
width <strong>of</strong> berm crown shall be from<br />
0.60m to 0.80m. The CaCO3-content<br />
<strong>of</strong> the material shall be smaller than<br />
20%.<br />
m3<br />
1,700<br />
Total for <strong>Bill</strong> No. 9<br />
(carried forward to Summary)
ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 42<br />
<strong>Bill</strong> No. 10: PE-HD Works<br />
Item no. Description Unit Quantity Rate Amount<br />
For all pipel<strong>in</strong>es and connect<strong>in</strong>g<br />
elements (fitt<strong>in</strong>gs etc) a pipe static<br />
calculation shall be provided by the<br />
Contractor. The remuneration shall be<br />
calculated accord<strong>in</strong>g to a separate<br />
position <strong>in</strong> bill no. 1.<br />
The pipes must not be stored <strong>in</strong> areas<br />
where they are exposed to direct<br />
sunlight. If no place <strong>in</strong> the shadow is<br />
available they have to be covered<br />
accord<strong>in</strong>g to the Project Manager's<br />
<strong>in</strong>structions.<br />
For every s<strong>in</strong>gle welded jo<strong>in</strong>t (sockets<br />
for resistance weld<strong>in</strong>g and heated<br />
tool butt weld<strong>in</strong>g) a weld<strong>in</strong>g record<br />
shall be provided accord<strong>in</strong>g to<br />
Technical Specification. This record is<br />
to be handed over to the Project<br />
Manager.<br />
After the weld<strong>in</strong>g process all <strong>in</strong>ternal<br />
burrs at the weld<strong>in</strong>g seams shall be<br />
completely removed.<br />
This work shall be <strong>in</strong>cluded <strong>in</strong> the<br />
follow<strong>in</strong>g standard prices.<br />
The standard prices also <strong>in</strong>clude all<br />
necessary cutt<strong>in</strong>g and weld<strong>in</strong>g <strong>of</strong> the<br />
pipes, when fitt<strong>in</strong>g lengths are<br />
required.
ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 43<br />
Item no. Description Unit Quantity Rate Amount<br />
10.1 PE-HD leachate dra<strong>in</strong> pipe<br />
315*28,6, SDR 11<br />
A leachate dra<strong>in</strong> pipe made from<br />
extruded PE-HD shall be supplied and<br />
<strong>in</strong>corporated <strong>in</strong> the entire cell for the<br />
leachate collection accord<strong>in</strong>g to the<br />
manufacturer's guidel<strong>in</strong>es and/or the<br />
Project Manager's <strong>in</strong>structions.<br />
The pipes shall be <strong>in</strong>stalled <strong>in</strong><br />
different <strong>in</strong>cl<strong>in</strong>ations.<br />
The leachate dra<strong>in</strong> pipe shall be 2/3<br />
slotted, with 3 circumferential slots,<br />
gradient <strong>of</strong> the lower slots with 2%<br />
<strong>in</strong>cl<strong>in</strong>ation with respect to the pipe<br />
<strong>in</strong>vert.<br />
The slot length shall be 80 mm, the<br />
slot width shall be 10 mm.<br />
The <strong>in</strong>dividual pipes are connected by<br />
means <strong>of</strong> the heated tool butt<br />
weld<strong>in</strong>g process. <strong>Al</strong>l required works<br />
and services to be supplied for this<br />
process have to be <strong>in</strong>cluded <strong>in</strong> the<br />
standard price.<br />
The external pipe diameter shall be<br />
315 mm, the wall thickness shall be<br />
28.6 mm. The pipe shall be suitable<br />
for pressure class SDR 11.<br />
The follow<strong>in</strong>g parameters have to be<br />
considered for the static calculation:<br />
- Weight <strong>of</strong> unit volume <strong>of</strong> waste<br />
approximately 10 kN/m³<br />
- Waste cover<strong>in</strong>g <strong>of</strong> the pipe up to 30<br />
m<br />
- Lay<strong>in</strong>g conditions as for dam<br />
- Gravel layer up to approximately<br />
60 to 90 cm above pipe<br />
- Pipe support made from sand,<br />
support angle 120 degrees<br />
m 800
ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 44<br />
Item no. Description Unit Quantity Rate Amount<br />
10.2 PE-HD leachate dra<strong>in</strong> pipe di 250<br />
Leachate dra<strong>in</strong> pipe made from<br />
extruded PE-HD material shall be<br />
supplied and <strong>in</strong>corporated <strong>in</strong> the<br />
entire<br />
cell for leachate collection accord<strong>in</strong>g<br />
to the manufacturer's guidel<strong>in</strong>es<br />
and/or the Project Manager's<br />
<strong>in</strong>structions.<br />
The pipes shall be <strong>in</strong>stalled <strong>in</strong><br />
different<br />
<strong>in</strong>cl<strong>in</strong>ations.<br />
The leachate dra<strong>in</strong> pipe shall be 2/3<br />
slotted, with 3 circumferential slots,<br />
gradient <strong>of</strong> the lower slots with 2%<br />
<strong>in</strong>cl<strong>in</strong>ation with respect to the pipe<br />
<strong>in</strong>vert.<br />
The slot length shall be 80 mm, the<br />
slot width shall be 10 mm.<br />
The <strong>in</strong>dividual pipes are connected by<br />
means <strong>of</strong> the heated tool butt<br />
weld<strong>in</strong>g process. <strong>Al</strong>l required works<br />
and services to be supplied for this<br />
process have to be <strong>in</strong>cluded <strong>in</strong> the<br />
standard price.<br />
The <strong>in</strong>ternal pipe diameter shall be<br />
250 mm, the wall thickness shall be<br />
accord<strong>in</strong>g to the static requirements<br />
for cover<strong>in</strong>g from 30 to 55 m.<br />
The follow<strong>in</strong>g parameters shall be<br />
considered for the static calculation:<br />
- Weight <strong>of</strong> unit volume <strong>of</strong> waste<br />
approximately 10 kN/m³<br />
- Waste cover<strong>in</strong>g up to 50 m<br />
- Lay<strong>in</strong>g conditions as for dam<br />
- Gravel layer up to approximately<br />
60 to 90 cm above pipe<br />
- Pipe support made from sand,<br />
support angle 120 degrees<br />
m 280
ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 45<br />
Item no. Description Unit Quantity Rate Amount<br />
10.3 PE-HD leachate ma<strong>in</strong> pipe<br />
400*36.3, SDR 11<br />
Leachate ma<strong>in</strong> pipe made from<br />
extruded PE-HD shall be supplied and<br />
<strong>in</strong>corporated <strong>in</strong> the entire cell for the<br />
leachate collection accord<strong>in</strong>g to the<br />
manufacturer's guidel<strong>in</strong>es and/or the<br />
Project Manager's <strong>in</strong>structions.<br />
The pipes shall be <strong>in</strong>stalled <strong>in</strong><br />
different <strong>in</strong>cl<strong>in</strong>ations.<br />
The external pipe diameter shall be<br />
400 mm, the wall thickness shall be<br />
36.3 mm. The pipe shall be suitable<br />
for pressure class SDR 11.<br />
<strong>Al</strong>l other works as expla<strong>in</strong>ed <strong>in</strong> item<br />
no. 10.1<br />
10.4 PE-HD leachate ma<strong>in</strong> pipe di 350<br />
Leachate ma<strong>in</strong> pipe made from<br />
extruded PE-HD material shall be<br />
supplied and <strong>in</strong>corporated <strong>in</strong> the<br />
entire<br />
cell for leachate collection accord<strong>in</strong>g<br />
to the manufacturer's guidel<strong>in</strong>es<br />
and/or the Project Manager's<br />
<strong>in</strong>structions.<br />
The pipes shall be <strong>in</strong>stalled <strong>in</strong><br />
different<br />
<strong>in</strong>cl<strong>in</strong>ations.<br />
The <strong>in</strong>ternal pipe diameter shall be<br />
350 mm, the wall thickness shall be<br />
accord<strong>in</strong>g to the static requirements<br />
for cover<strong>in</strong>g from 30 to 50 m.<br />
<strong>Al</strong>l other works as expla<strong>in</strong>ed <strong>in</strong> item<br />
no. 10.2<br />
m<br />
m<br />
400<br />
200
ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 46<br />
Item no. Description Unit Quantity Rate Amount<br />
10.5 PEHD monobloc pipe 315*28.6 mm<br />
A monobloc pipe made from<br />
extruded PE-HD shall be supplied and<br />
<strong>in</strong>corporated as end pieces for the<br />
leachate dra<strong>in</strong> pipes respectively<br />
accord<strong>in</strong>g to the manufacturer's<br />
guidel<strong>in</strong>es and/or the <strong>in</strong>structions <strong>of</strong><br />
the Project Manager.<br />
The <strong>in</strong>dividual pipes shall be<br />
connected by means <strong>of</strong> the heated<br />
tool butt weld<strong>in</strong>g process. <strong>Al</strong>l<br />
required works and services to be<br />
supplied for this process shall be<br />
<strong>in</strong>cluded <strong>in</strong> the standard price.<br />
The external pipe diameter shall be<br />
315 mm, the wall thickness shall be<br />
28.6 mm. The pipe shall be suitable<br />
for pressure class SDR 11.<br />
The follow<strong>in</strong>g parameters have to be<br />
considered for the static calculation:<br />
- Weight <strong>of</strong> unit volume <strong>of</strong> waste<br />
approximately 10 kN/m³<br />
- Waste cover<strong>in</strong>g <strong>of</strong> the pipe up to 10<br />
m<br />
- Lay<strong>in</strong>g conditions as for dam<br />
- Gravel layer up to approximately<br />
60 to 90 cm above pipe<br />
- Pipe support made from sand,<br />
support angle 120 degrees<br />
m 20<br />
10.6 PEHD monobloc pipe 400*36.3 mm<br />
Monobloc pipes made from extruded<br />
PE-HD shall be supplied as end pieces<br />
for the leachate ma<strong>in</strong> pipes accord<strong>in</strong>g<br />
to the manufacturer's guidel<strong>in</strong>es<br />
and/or the <strong>in</strong>structions <strong>of</strong> the Project<br />
Manager.<br />
The external pipe diameter shall be<br />
400 mm, the wall thickness shall be<br />
36.3 mm. The pipe shall be suitable<br />
for pressure class SDR 11.<br />
- Waste cover<strong>in</strong>g <strong>of</strong> the pipe up to 10<br />
m<br />
<strong>Al</strong>l other works as expla<strong>in</strong>ed <strong>in</strong> item<br />
no. 10.5.<br />
m 20
ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 47<br />
Item<br />
Description Unit Quantit<br />
no.<br />
y<br />
10.7 PEHD monobloc pipe di 250 mm<br />
Monobloc pipes made from extruded PE-<br />
HD shall be supplied as end pieces for<br />
the leachate pipes <strong>of</strong> item 10.2,<br />
accord<strong>in</strong>g to the manufacturer's<br />
guidel<strong>in</strong>es and/or the <strong>in</strong>structions <strong>of</strong> the<br />
Project Manager.<br />
The <strong>in</strong>ternal pipe diameter shall be<br />
250 mm, the pipe shall be suitable for<br />
pressure class SDR 11.<br />
- Waste cover<strong>in</strong>g <strong>of</strong> the pipe up to 10 m<br />
<strong>Al</strong>l other works as expla<strong>in</strong>ed <strong>in</strong> item no.<br />
10.5.<br />
m 200<br />
10.8 PEHD monobloc pipe di 350 mm<br />
Monobloc pipes made from extruded PE-<br />
HD shall be supplied as end pieces for<br />
the leachate pipes <strong>of</strong> item 10.4,<br />
accord<strong>in</strong>g to the manufacturer's<br />
guidel<strong>in</strong>es and/or the <strong>in</strong>structions <strong>of</strong> the<br />
Project Manager.<br />
The <strong>in</strong>ternal pipe diameter shall be<br />
350 mm, the pipe shall be suitable for<br />
pressure class SDR 11.<br />
- Waste cover<strong>in</strong>g <strong>of</strong> the pipe up to 10 m<br />
<strong>Al</strong>l other works as expla<strong>in</strong>ed <strong>in</strong> item no.<br />
10.5.<br />
m 5<br />
10.9 PEHD monobloc pipe 400*36.3 mm<br />
Monobloc pipes made from extruded PE-<br />
HD shall be supplied as temporary<br />
leachate ma<strong>in</strong> pipes outside the <strong>landfill</strong><br />
(connection from <strong>landfill</strong> to leachate<br />
pond) accord<strong>in</strong>g to the manufacturer's<br />
guidel<strong>in</strong>es and/or the <strong>in</strong>structions <strong>of</strong> the<br />
Project Manager.<br />
The external pipe diameter shall be<br />
400 mm, the wall thickness shall be 36.3<br />
mm. The pipe shall be suitable for<br />
pressure class SDR 11.<br />
- no waste coverage, pipes are laid <strong>in</strong><br />
trenches (depth about 2 m) or on top <strong>of</strong><br />
waste slopes<br />
<strong>Al</strong>l other works as expla<strong>in</strong>ed <strong>in</strong> item no.<br />
10.5.<br />
m 140<br />
Rate Amount
ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 48<br />
Item no. Description Unit Quantity Rate Amount<br />
10.10 T-Piece PE-HD, external diameter<br />
400/315, SDR 11<br />
A t-piece with a reduced end piece made<br />
from <strong>in</strong>jection-moulded PE-HD shall be<br />
supplied and <strong>in</strong>stalled for the connections<br />
<strong>of</strong> the leachate dra<strong>in</strong> pipes to the ma<strong>in</strong><br />
leachate pipe accord<strong>in</strong>g to the<br />
manufacturer's guidel<strong>in</strong>es and/or the<br />
Project Manager's <strong>in</strong>structions.<br />
The <strong>in</strong>dividual pipes are connected by<br />
means <strong>of</strong> sockets for resistance weld<strong>in</strong>g.<br />
<strong>Al</strong>l required works have to be <strong>in</strong>cluded <strong>in</strong><br />
the standard price.<br />
The external pipe diameter shall be<br />
400 mm, the wall thickness <strong>in</strong> the ma<strong>in</strong><br />
leachate pipe shall be 36.3 mm.<br />
The external pipe diameter <strong>of</strong> the end<br />
piece (for the leachate dra<strong>in</strong> pipe) shall be<br />
315 mm, the wall thickness shall be 28.6<br />
mm.<br />
Waste coverage amounts to about 30 m<br />
(for static calculation)<br />
piece 4<br />
10.11 T-Piece PE-HD, <strong>in</strong>ternal diameter<br />
350/250<br />
A t-piece with a reduced end piece made<br />
from <strong>in</strong>jection-moulded PE-HD shall be<br />
supplied and <strong>in</strong>stalled for the connections<br />
<strong>of</strong> the leachate dra<strong>in</strong> pipes to the ma<strong>in</strong><br />
leachate pipe accord<strong>in</strong>g to the<br />
manufacturer's guidel<strong>in</strong>es and/or the<br />
Project Manager's <strong>in</strong>structions.<br />
The <strong>in</strong>dividual pipes are connected by<br />
means <strong>of</strong> sockets for resistance weld<strong>in</strong>g.<br />
<strong>Al</strong>l required works have to be <strong>in</strong>cluded <strong>in</strong><br />
the standard price.<br />
The <strong>in</strong>ternal pipe diameter shall be<br />
350 mm, the wall thickness accord<strong>in</strong>g to<br />
static requirements.<br />
The <strong>in</strong>ternal pipe diameter <strong>of</strong> the end<br />
piece shall be 250 mm, the wall thickness<br />
accord<strong>in</strong>g to static requirements.<br />
Waste coverage amounts to about 50 m<br />
(for static calculation)<br />
piece<br />
4
ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 49<br />
Item no. Description Unit Quantity Rate Amount<br />
10.12 T-Piece PE-HD, external diameter<br />
400/400, SDR 11<br />
A t-piece made from <strong>in</strong>jectionmoulded<br />
PE-HD shall be supplied and<br />
<strong>in</strong>stalled for the connections <strong>of</strong> the<br />
leachate ma<strong>in</strong> pipes to the temporary<br />
leachate pipe accord<strong>in</strong>g to the<br />
manufacturer's guidel<strong>in</strong>es and/or the<br />
Project Manager's <strong>in</strong>structions.<br />
The external pipe diameter shall be<br />
400 mm, the wall thickness shall be<br />
36.3 mm on all sides.<br />
<strong>Al</strong>l other works as expla<strong>in</strong>ed <strong>in</strong> item<br />
no. 10.10 resp. 10.9<br />
10.13 PE-HD pipe bend, 400*36,3 SDR 11<br />
A pipe bend made from PE-HD shall<br />
be supplied and <strong>in</strong>stalled <strong>in</strong> the<br />
temporary leachate pipe accord<strong>in</strong>g to<br />
the manufacturer's guidel<strong>in</strong>es and/or<br />
the Project Manager's <strong>in</strong>structions.<br />
The <strong>in</strong>dividual pipe pieces shall be<br />
connected by means <strong>of</strong> heated tool<br />
butt weld<strong>in</strong>g. <strong>Al</strong>l required works have<br />
to be <strong>in</strong>cluded <strong>in</strong> the standard price.<br />
The pipe bend shall be supplied <strong>in</strong> all<br />
necessary angles (15 and 90 degrees).<br />
The external pipe diameter shall be<br />
400 mm, the wall thickness shall be<br />
36.3 mm.<br />
The fitt<strong>in</strong>g shall be suitable for<br />
pressure class SDR 11.<br />
piece<br />
piece<br />
2<br />
2
ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 50<br />
Item no. Description Unit Quantity Rate Amount<br />
10.14 Weld<strong>in</strong>g neck 315*28.6 with<br />
movable flange<br />
A weld<strong>in</strong>g neck made from PE-HD<br />
with a movable flange shall be<br />
supplied and <strong>in</strong>stalled <strong>in</strong> the leachate<br />
pipe system accord<strong>in</strong>g to the<br />
manufacturer's guidel<strong>in</strong>es and/or the<br />
Project Manager's <strong>in</strong>structions.<br />
The connection to the pipe shall be<br />
done by means <strong>of</strong> sockets <strong>of</strong><br />
resistance weld<strong>in</strong>g. <strong>Al</strong>l required works<br />
have to be <strong>in</strong>cluded <strong>in</strong> the standard<br />
price.<br />
The movable flange shall be made <strong>of</strong><br />
glass fiber re<strong>in</strong>forced PP with steel<br />
re<strong>in</strong>forcement.<br />
The fitt<strong>in</strong>g shall have an external pipe<br />
piece 4<br />
diameter <strong>of</strong> 315 mm<br />
10.15 Weld<strong>in</strong>g neck 400*36.3 with<br />
movable flange<br />
A weld<strong>in</strong>g neck made from PE-HD<br />
with a movable flange shall be<br />
supplied and <strong>in</strong>stalled <strong>in</strong> the leachate<br />
pipe system accord<strong>in</strong>g to the<br />
manufacturer's guidel<strong>in</strong>es and/or the<br />
Project Manager's <strong>in</strong>structions.<br />
The fitt<strong>in</strong>g shall have an external pipe<br />
diameter <strong>of</strong> 400 mm.<br />
<strong>Al</strong>l other works as expla<strong>in</strong>ed <strong>in</strong> item<br />
no. 10.14.<br />
10.16 Weld<strong>in</strong>g di 250 with movable<br />
flange<br />
A weld<strong>in</strong>g neck made from PE-HD<br />
with a movable flange shall be<br />
supplied and <strong>in</strong>stalled <strong>in</strong> the leachate<br />
pipe system accord<strong>in</strong>g to the<br />
manufacturer's guidel<strong>in</strong>es and/or the<br />
Project Manager's <strong>in</strong>structions.<br />
The fitt<strong>in</strong>g shall have an <strong>in</strong>ternal pipe<br />
diameter <strong>of</strong> 250 mm (l<strong>in</strong>ked to pipes<br />
<strong>of</strong> item no. 10.2).<br />
<strong>Al</strong>l other works as expla<strong>in</strong>ed <strong>in</strong> item<br />
no. 10.14.<br />
piece<br />
piece<br />
2<br />
4
ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 51<br />
Item no. Description Unit Quantity Rate Amount<br />
10.17 Weld<strong>in</strong>g di 350 with movable<br />
flange<br />
A weld<strong>in</strong>g neck made from PE-HD<br />
with a movable flange shall be<br />
supplied and <strong>in</strong>stalled <strong>in</strong> the leachate<br />
pipe system accord<strong>in</strong>g to the<br />
manufacturer's guidel<strong>in</strong>es and/or the<br />
Project Manager's <strong>in</strong>structions.<br />
The fitt<strong>in</strong>g shall have an <strong>in</strong>ternal pipe<br />
diameter <strong>of</strong> 350 mm (l<strong>in</strong>ked to pipes<br />
<strong>of</strong> item no. 10.4).<br />
<strong>Al</strong>l other works as expla<strong>in</strong>ed <strong>in</strong> item piece 1<br />
no. 10.14.<br />
10.18 Bl<strong>in</strong>d Flange, Diameter 315 mm<br />
A bl<strong>in</strong>d flange shall be supplied and<br />
<strong>in</strong>stalled <strong>in</strong> the leachate pipe system.<br />
The flange shall have an external pipe<br />
diameter 315 mm.<br />
The fitt<strong>in</strong>g shall be made <strong>of</strong> glass fiber<br />
re<strong>in</strong>forced PP with steel<br />
re<strong>in</strong>forcement.<br />
<strong>Al</strong>l required works as well as supply<br />
and <strong>in</strong>corporation <strong>of</strong> required<br />
sta<strong>in</strong>less connections and<br />
correspond<strong>in</strong>g seal<strong>in</strong>g materials shall<br />
be <strong>in</strong>cluded <strong>in</strong> the standard price.<br />
10.19 Bl<strong>in</strong>d Flange, Diameter 400 mm<br />
A bl<strong>in</strong>d flange shall be supplied and<br />
<strong>in</strong>stalled <strong>in</strong> the leachate pipe system.<br />
The flange shall have an external pipe<br />
diameter 400 mm.<br />
<strong>Al</strong>l other works as expla<strong>in</strong>ed <strong>in</strong> item<br />
no. 10.18<br />
10.20 Bl<strong>in</strong>d Flange, Diameter 250 mm<br />
A bl<strong>in</strong>d flange shall be supplied and<br />
<strong>in</strong>stalled <strong>in</strong> the leachate pipe system.<br />
The flange shall have an <strong>in</strong>ternal pipe<br />
diameter <strong>of</strong> 250 mm.<br />
<strong>Al</strong>l other works as expla<strong>in</strong>ed <strong>in</strong> item<br />
no. 10.18<br />
piece<br />
piece<br />
piece<br />
4<br />
2<br />
4
ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 52<br />
Item no. Description Unit Quantity Rate Amount<br />
10.21 Bl<strong>in</strong>d Flange, Diameter 350 mm<br />
A bl<strong>in</strong>d flange shall be supplied and<br />
<strong>in</strong>stalled <strong>in</strong> the leachate pipe system.<br />
The flange shall have an <strong>in</strong>ternal pipe<br />
diameter <strong>of</strong> 350 mm.<br />
<strong>Al</strong>l other works as expla<strong>in</strong>ed <strong>in</strong> item<br />
no. 10.18<br />
piece 1<br />
10.22 PE-HD Inspection (revision) box<br />
with seal<br />
An <strong>in</strong>spection box with seal and with<br />
V2A quick release coupl<strong>in</strong>g, fabricated<br />
from PEHD pipes and sheets, shall be<br />
supplied and <strong>in</strong>stalled <strong>in</strong> the leachate<br />
pipe system <strong>in</strong>side manhole 1<br />
accord<strong>in</strong>g to the manufacturer's<br />
guidel<strong>in</strong>es and/or the Project<br />
Manager's <strong>in</strong>structions.<br />
The <strong>in</strong>dividual pipe pieces shall be<br />
connected by means <strong>of</strong> heated tool<br />
butt weld<strong>in</strong>g. <strong>Al</strong>l required works have<br />
to be <strong>in</strong>cluded <strong>in</strong> the standard price.<br />
The external pipe diameter shall be<br />
400 mm, the wall thickness shall be<br />
36.3 mm.<br />
10.23 Impermeability Test, PE-HD Pipes<br />
Impermeability test shall be executed<br />
<strong>in</strong> the ma<strong>in</strong> leachate pipe accord<strong>in</strong>g<br />
to EN 1610 with air and <strong>in</strong>clud<strong>in</strong>g all<br />
required <strong>in</strong>stallations and seals.<br />
The process LD accord<strong>in</strong>g to EN 1610<br />
shall be applied (pressur<strong>in</strong>g with air<br />
and an overpressure <strong>of</strong> 0.2 bar) for PE-<br />
HD pipe with an <strong>in</strong>ternal pipe<br />
diameter <strong>of</strong> 250-400 mm<br />
Piece<br />
sum<br />
1<br />
1
ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 53<br />
Item no. Description Unit Quantity Rate Amount<br />
10.24 PE-HD ventilation<br />
Ventilation pipes made <strong>of</strong> PE-HD shall<br />
be supllied and <strong>in</strong>corporated.<br />
The pipes shall be split <strong>in</strong> two parts.<br />
The standard price <strong>in</strong>cludes all fix<strong>in</strong>g<br />
devices for wall and ro<strong>of</strong> as well as all<br />
necessary seal<strong>in</strong>gs and pipe ducts<br />
(pass<strong>in</strong>g <strong>of</strong> the pipe through the<br />
concrete wall). The external pipe<br />
diameter shall be 200 mm, the wall<br />
thickness shall be 11.4 mm.<br />
The length <strong>of</strong> pipe shall be<br />
approximately 3.0 m. One air dome<br />
(cover <strong>of</strong> the pipes) shall be <strong>in</strong>cluded.<br />
Installation accord<strong>in</strong>g to draw<strong>in</strong>g /<br />
plan. Constructional unit:<br />
<strong>in</strong>spection manhole for ma<strong>in</strong> leachate<br />
pipe and pump station<br />
10.25 PEHD l<strong>in</strong><strong>in</strong>g<br />
A PEHD l<strong>in</strong><strong>in</strong>g shall be supplied and<br />
<strong>in</strong>stalled as a surface cover on the<br />
base and the walls <strong>in</strong> the pump<br />
station and on the outlet structure at<br />
the leachate pond.<br />
The plates shall be made <strong>of</strong> PEHD<br />
with a thickness <strong>of</strong> 5 mm. They shall<br />
be applied to the <strong>in</strong>side <strong>of</strong> the<br />
board<strong>in</strong>g for the concrete. They must<br />
have naps on the <strong>in</strong>ner side so they<br />
can bond well with the concrete.<br />
The standard price shall <strong>in</strong>clude all<br />
necessary equipment and works for<br />
adapt<strong>in</strong>g to the different slopes and<br />
structures <strong>in</strong> the area <strong>in</strong> <strong>in</strong>corporation.<br />
piece<br />
m2<br />
2<br />
50
ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 54<br />
Item no. Description Unit Quantity Rate Amount<br />
10.26 Weld<strong>in</strong>g Neck 400*36.3 with<br />
Movable Flange<br />
A weld<strong>in</strong>g neck made from PE-HD<br />
with a movable flange shall be<br />
supplied and <strong>in</strong>stalled <strong>in</strong> the gas<br />
collection pipe accord<strong>in</strong>g to the<br />
manufacturer's guidel<strong>in</strong>es and/or the<br />
Project Manager's <strong>in</strong>structions.<br />
The fitt<strong>in</strong>g shall have an external pipe<br />
diameter <strong>of</strong> 400 mm.<br />
Facilities for gas collection are<br />
described <strong>in</strong> Chapter 15<br />
<strong>Al</strong>l other works as expla<strong>in</strong>ed <strong>in</strong> item<br />
no. 10.14.<br />
piece<br />
10.27 Bl<strong>in</strong>d Flange, Diameter 400 mm<br />
A bl<strong>in</strong>d flange shall be supplied and<br />
<strong>in</strong>stalled <strong>in</strong> the leachate pipe system.<br />
The flange shall have an external pipe<br />
diameter 400 mm.<br />
The fitt<strong>in</strong>g shall be made <strong>of</strong> glass fiber<br />
re<strong>in</strong>forced PP with steel<br />
re<strong>in</strong>forcement.<br />
<strong>Al</strong>l required works as well as supply<br />
and <strong>in</strong>corporation <strong>of</strong> required<br />
sta<strong>in</strong>less connections and<br />
correspond<strong>in</strong>g seal<strong>in</strong>g materials shall<br />
be <strong>in</strong>cluded <strong>in</strong> the standard price.<br />
Facilities for gas collection are<br />
described <strong>in</strong> Chapter 15<br />
piece 1<br />
Total for <strong>Bill</strong> No. 10<br />
(carried forward to Summary)<br />
1
ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 55<br />
<strong>Bill</strong> No. 11: Concrete Works<br />
Item no. Description Unit Quantity Rate Amount<br />
Instructions For Execution:<br />
1) General<br />
For all structures the necessary<br />
structural analysis and detail draw<strong>in</strong>gs<br />
shall be supplied by the Contractor.<br />
The result<strong>in</strong>g costs shall be <strong>in</strong>cluded<br />
<strong>in</strong> the standard prices.<br />
Check<strong>in</strong>g <strong>of</strong> the compressive strength<br />
and bend<strong>in</strong>g tensile strength shall be<br />
done by an authorized material<br />
test<strong>in</strong>g <strong>in</strong>stitute chosen by the<br />
Contractor. <strong>Al</strong>l required tests are to be<br />
executed accord<strong>in</strong>g to applicable law.<br />
The result<strong>in</strong>g costs are to be part <strong>of</strong><br />
the flat rate.<br />
2) Concrete Works<br />
The concrete shall be supplied and<br />
<strong>in</strong>corporated accord<strong>in</strong>g to EN 206.<br />
The quality shall be m<strong>in</strong>. C 30/37.<br />
The production <strong>of</strong> concrete shall take<br />
<strong>in</strong>to account the exposure classes<br />
XF1, XA3 and XC1 accord<strong>in</strong>g to EN<br />
206.<br />
Structurally connected parts shall be<br />
concreted <strong>in</strong> one stretch without<br />
payment <strong>of</strong> over-time or night work<br />
result<strong>in</strong>g from this. This is also true for<br />
build<strong>in</strong>g components between<br />
expansion and stra<strong>in</strong> jo<strong>in</strong>ts. For<br />
exceptions the Contractor shall<br />
consult with the stress analyst.<br />
The hight <strong>of</strong> the layers <strong>of</strong> concrete<br />
<strong>in</strong>corporation shall be max. 40 cm.<br />
Pour<strong>in</strong>g pipes shall be used when the<br />
pour<strong>in</strong>g height is bigger than 2.0 m
ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 56<br />
Item no. Description Unit Quantity Rate Amount<br />
An even compaction by means <strong>of</strong> an<br />
<strong>in</strong>ternal vibrator is necessary<br />
The concrete shall be protected from<br />
exsiccation. The concrete must be kept<br />
wet for at least 7 days after pour<strong>in</strong>g.<br />
Vibrations <strong>of</strong> the new concrete shall be<br />
avoided.<br />
<strong>Al</strong>l surfaces shall be made <strong>of</strong> fairfaced<br />
concrete except for those concrete<br />
surfaces touched by soil.<br />
Indicated board<strong>in</strong>g for a smooth<br />
surface shall be chosen by the<br />
Contractor (<strong>in</strong> consultation with the<br />
Project<br />
Manager!).<br />
<strong>Al</strong>l visible concrete edges shall be<br />
broken by means <strong>of</strong> a three square or<br />
trapeze ledge. This is also true for all<br />
seams.<br />
A sub-base made <strong>of</strong> non-re<strong>in</strong>forced site<br />
concrete (C 8/10 EN 206) shall be<br />
supplied and <strong>in</strong>corporated under all<br />
concrete structures.<br />
The thickness <strong>of</strong> the subbase shall be:<br />
10 cm.<br />
3) Re<strong>in</strong>forcement Steel<br />
The re<strong>in</strong>forcement steel shall be<br />
supplied accord<strong>in</strong>g to relevant<br />
regulations have to be delivered and<br />
<strong>in</strong>corporated accord<strong>in</strong>g to the<br />
structural requirements.<br />
The re<strong>in</strong>forcement steel shall have a<br />
tensile strength <strong>of</strong> at least 420 N/mm².<br />
It shall be formed with two rows <strong>of</strong> rips<br />
(strips), which are located diagonal and<br />
situated opposite each other.<br />
The supply and <strong>in</strong>corporation <strong>of</strong> all<br />
diameters and lengths as well as the<br />
<strong>in</strong>corporation <strong>in</strong> all constructional units<br />
shall be <strong>in</strong>cluded <strong>in</strong> the standard prices<br />
<strong>of</strong> the structures.
ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 57<br />
Item no. Description Unit Quantity Rate Amount<br />
4) Earthworks<br />
<strong>Al</strong>l necessary earthworks <strong>in</strong>clud<strong>in</strong>g<br />
excavations and fill<strong>in</strong>gs accord<strong>in</strong>g to<br />
the relevant regulations and accord<strong>in</strong>g<br />
to the requirements on site shall be<br />
<strong>in</strong>cluded <strong>in</strong> the standard prices for the<br />
structures. The excavated soil shall<br />
become the property <strong>of</strong> the Contractor<br />
and shall be removed from site and<br />
shall be disposed <strong>of</strong> on expense <strong>of</strong> the<br />
Contractor.<br />
After completion <strong>of</strong> the build<strong>in</strong>gs the<br />
build<strong>in</strong>g pits shall be filled with soil<br />
supplied by the Contractor.<br />
The fill<strong>in</strong>g material shall consist <strong>of</strong><br />
friable soil, coarse-gra<strong>in</strong>ed or mix<br />
gra<strong>in</strong>ed. Is mix gra<strong>in</strong>ed soil supplied, it<br />
shall conta<strong>in</strong> material with a gra<strong>in</strong><br />
diameter smaller than 0.06 mm at a<br />
max. rate <strong>of</strong> 15 % (<strong>of</strong> the weight).<br />
The soil shall be <strong>in</strong>corporated and<br />
compacted layer by layer, each with a<br />
thickness <strong>of</strong> max. 30 cm.<br />
5) Pipe Connections / Pipe Wall Ducts<br />
<strong>Al</strong>l pipe connections and pipe wall<br />
ducts shall be impermeable. It is<br />
recommended to use special r<strong>in</strong>g<br />
seal<strong>in</strong>g systems to guarantee the<br />
impermeability.<br />
11.1 Manhole 1<br />
The complete structure <strong>of</strong> the<br />
manhole 1 shall be built accord<strong>in</strong>g to<br />
the draw<strong>in</strong>gs and the above listed<br />
<strong>in</strong>structions by the Project Manager<br />
and accord<strong>in</strong>g to the f<strong>in</strong>al draw<strong>in</strong>gs<br />
and the structural analysis supplied by<br />
the Contractor.<br />
<strong>Al</strong>l necessary supplies and works<br />
(<strong>in</strong>clud<strong>in</strong>g earthworks, concrete works<br />
with board<strong>in</strong>g and re<strong>in</strong>forcement<br />
steel, fabrication <strong>of</strong> the necessary<br />
recesses and pipe wall ducts) shall be<br />
<strong>in</strong>cluded <strong>in</strong> the standard price.
ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 58<br />
Item no. Description<br />
The follow<strong>in</strong>g item shall also be<br />
<strong>in</strong>cluded <strong>in</strong> the standard price:<br />
Unit Quantity Rate Amount<br />
- Manhole cover, weatherpro<strong>of</strong>,<br />
square <strong>in</strong> shape with dimensions<br />
<strong>of</strong> 1.0 / 1.0 m, completely made <strong>of</strong><br />
sta<strong>in</strong>less steel. The cover shall be<br />
supplied with a self-retract<strong>in</strong>g<br />
lock, sta<strong>in</strong>less steel gas assisted<br />
spr<strong>in</strong>g damper, self engag<strong>in</strong>g door<br />
latch and robust, concealed<br />
h<strong>in</strong>ges. In the centre <strong>of</strong> the cover<br />
shall be an <strong>in</strong>tegrated air vent<br />
made <strong>of</strong> sta<strong>in</strong>less steel. The frame<br />
shall consist <strong>of</strong> a Z-section with a<br />
circumferential totally<br />
weatherpro<strong>of</strong> rubber seal (frostpro<strong>of</strong><br />
and weather-resistant),<br />
designed for <strong>in</strong>corporat<strong>in</strong>g <strong>in</strong><br />
concrete etc. The operat<strong>in</strong>g keys<br />
shall be <strong>in</strong>cluded <strong>in</strong> the standard<br />
price.<br />
Earth<strong>in</strong>g strip made from V2A<br />
sta<strong>in</strong>less steel placed <strong>in</strong> concrete<br />
foundations, foundation slabs<br />
respectively <strong>in</strong> soil trenches to be dug<br />
out.<br />
The cross section shall be<br />
30 x 3.5 mm<br />
piece 1<br />
11.2 Leachate Pump Station<br />
The complete structure <strong>of</strong> the pump<br />
station at the leachate pond shall be<br />
built accord<strong>in</strong>g to the draw<strong>in</strong>gs and<br />
the above listed <strong>in</strong>structions by the<br />
Project Manager and accord<strong>in</strong>g to the<br />
f<strong>in</strong>al draw<strong>in</strong>gs and the structural<br />
analysis supplied by the Contractor.<br />
<strong>Al</strong>l necessary supplies and works<br />
(<strong>in</strong>clud<strong>in</strong>g earthworks, concrete works<br />
with board<strong>in</strong>g and re<strong>in</strong>forcement<br />
steel, fabrication <strong>of</strong> the necessary<br />
recesses and pipe wall ducts) shall be<br />
<strong>in</strong>cluded <strong>in</strong> the standard price.
ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 59<br />
Item no. Description<br />
The follow<strong>in</strong>g item shall also be<br />
<strong>in</strong>cluded <strong>in</strong> the standard price:<br />
Unit Quantity Rate Amount<br />
- Manhole cover, weatherpro<strong>of</strong>,<br />
square <strong>in</strong> shape with dimensions<br />
<strong>of</strong> 1.0 / 1.0 m, completely made <strong>of</strong><br />
sta<strong>in</strong>less steel. The cover shall be<br />
supplied with a self-retract<strong>in</strong>g<br />
lock, sta<strong>in</strong>less steel gas assisted<br />
spr<strong>in</strong>g damper, self engag<strong>in</strong>g door<br />
latch and robust, concealed<br />
h<strong>in</strong>ges. In the centre <strong>of</strong> the cover<br />
shall be an <strong>in</strong>tegrated air vent<br />
made <strong>of</strong> sta<strong>in</strong>less steel. The frame<br />
shall consist <strong>of</strong> a Z-section with a<br />
circumferential totally<br />
weatherpro<strong>of</strong> rubber seal (frostpro<strong>of</strong><br />
and weather-resistant),<br />
designed for <strong>in</strong>corporat<strong>in</strong>g <strong>in</strong><br />
concrete etc. The operat<strong>in</strong>g keys<br />
shall be <strong>in</strong>cluded <strong>in</strong> the standard<br />
price.<br />
Earth<strong>in</strong>g strip made from V2A<br />
sta<strong>in</strong>less steel placed <strong>in</strong> concrete<br />
foundations, foundation slabs<br />
respectively <strong>in</strong> soil trenches to be dug<br />
out. The cross section shall be 30 x 3.5<br />
mm.<br />
piece 1<br />
11.3 Strip Foundations<br />
Re<strong>in</strong>forced concrete C 20/25 (EN 206)<br />
shall be supplied and <strong>in</strong>corporated as<br />
strip foundations for different<br />
constructional units.<br />
The upper concrete surface shall be<br />
horizontal and smoothed.<br />
Necessary board<strong>in</strong>g shall be <strong>in</strong>cluded<br />
<strong>in</strong> the standard price.<br />
<strong>Al</strong>l necessary supplies and works<br />
(<strong>in</strong>clud<strong>in</strong>g earthworks, concrete works<br />
and re<strong>in</strong>forcement steel, fabrication <strong>of</strong><br />
the necessary recesses and pipe wall<br />
ducts) is <strong>in</strong>cluded <strong>in</strong> the standard<br />
price.<br />
m3 5
ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 60<br />
Item no. Description Unit Quantity Rate Amount<br />
11.4 Culvert <strong>in</strong>let structure (Manhole for<br />
surface water)<br />
The complete culvert <strong>in</strong>let structure<br />
shall be built accord<strong>in</strong>g to the<br />
draw<strong>in</strong>gs and the above listed<br />
<strong>in</strong>structions by the Project Manager<br />
and accord<strong>in</strong>g to the f<strong>in</strong>al draw<strong>in</strong>gs<br />
and the structural analysis supplied<br />
by the Contractor.<br />
The manhole cover shall consist <strong>of</strong> a<br />
grat<strong>in</strong>g made <strong>of</strong> galvanized steel.<br />
<strong>Al</strong>l necessary supplies and works<br />
(<strong>in</strong>clud<strong>in</strong>g earthworks, concrete works<br />
with board<strong>in</strong>g and re<strong>in</strong>forcement<br />
steel, fabrication <strong>of</strong> the necessary<br />
recesses and pipe wall ducts) shall be<br />
piece 1<br />
<strong>in</strong>cluded <strong>in</strong> the standard price.<br />
11.5 Slide valve with an <strong>in</strong>ternal<br />
diameter <strong>of</strong> 350 mm<br />
Slide valve (gate valve) for example<br />
made <strong>of</strong> sta<strong>in</strong>less steel (material<br />
1.4571) with an <strong>in</strong>ternal diameter <strong>of</strong><br />
350 mm shall be supplied and<br />
<strong>in</strong>stalled for clos<strong>in</strong>g the ma<strong>in</strong> leachate<br />
pipe <strong>in</strong> the <strong>in</strong>spection manhole 1.<br />
<strong>Al</strong>l <strong>in</strong>stallation works <strong>in</strong>clud<strong>in</strong>g the<br />
necessary fixation <strong>in</strong>side the manhole,<br />
the <strong>in</strong>corporation <strong>in</strong>to the PEHD pipe<br />
with an external diameter <strong>of</strong> 400 mm<br />
through flanged connections, all<br />
seal<strong>in</strong>gs and all necessary equipment<br />
shall be <strong>in</strong>cluded <strong>in</strong> the standard<br />
price.<br />
The regulation <strong>of</strong> the slide valve shall<br />
be done manually from outside the<br />
manhole structure with a suitable<br />
stem extension and the applicable<br />
surface box.<br />
Construction depth from pipe base to<br />
top edge <strong>of</strong> manhole 1: 205 mm.<br />
piece<br />
1
ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 61<br />
Item no. Description Unit Quantity Rate Amount<br />
11.6 Slide valve with an <strong>in</strong>ternal<br />
diameter <strong>of</strong> 250 mm<br />
Slide valve (gate valve) for example<br />
made <strong>of</strong> sta<strong>in</strong>less steel (material<br />
1.4571) with an <strong>in</strong>ternal diameter <strong>of</strong><br />
250 mm shall be supplied and<br />
<strong>in</strong>stalled for clos<strong>in</strong>g the outlet pipe <strong>of</strong><br />
the leachate pond <strong>in</strong> the pump<br />
station.<br />
<strong>Al</strong>l <strong>in</strong>stallation works <strong>in</strong>clud<strong>in</strong>g the<br />
necessary fixation <strong>in</strong>side the manhole<br />
and the <strong>in</strong>corporation <strong>in</strong>to the PEHD<br />
pipe with an external diameter <strong>of</strong> 315<br />
mm through flanged connections, all<br />
seal<strong>in</strong>gs and all necessary equipment<br />
shall be <strong>in</strong>cluded <strong>in</strong> the standard<br />
price.<br />
The regulation <strong>of</strong> the slide valve shall<br />
be done manually from outside the<br />
structure through the manhole cover<br />
with a suitable stem extension, which<br />
shall be fixated to the concrete wall.<br />
Construction depth from pipe base to<br />
the end po<strong>in</strong>t <strong>of</strong> the extension: 220-<br />
230 mm.<br />
piece<br />
1<br />
Total for <strong>Bill</strong> No. 11<br />
(carried forward to Summary)
ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 62<br />
<strong>Bill</strong> No. 12: Leachate Recirculation<br />
Item no. Description<br />
Instructions For Execution:<br />
For the leachate recirculation a<br />
execution design has to be prepared<br />
by the Contractor (see item no. 1:18).<br />
This design has to be prepared with<br />
the real used facilities.<br />
Unit Quantity Rate Amount<br />
12.1 Water pump<br />
Supply and Installation <strong>of</strong> water<br />
pumps <strong>in</strong> work<strong>in</strong>g conditions,<br />
<strong>in</strong>clud<strong>in</strong>g all necessary equipment and<br />
works for <strong>in</strong>stallation and operation.<br />
Two Submersible pumps have to be<br />
delivered and <strong>in</strong>stalled for the recirculation<br />
<strong>of</strong> leachate from the<br />
leachate pond to the <strong>landfill</strong>. One <strong>of</strong><br />
the pumps is redundant <strong>in</strong> case <strong>of</strong><br />
failure.<br />
The submersible pumps should have<br />
the follow<strong>in</strong>g specifications:<br />
Type Submersible pumps (e.g. RITZ<br />
pumps, Schwäbisch Gmünd, Germany<br />
Type U8 100.Z/6+121/37,00/2) to fit <strong>in</strong><br />
exist<strong>in</strong>g manhole (refer detailed<br />
draw<strong>in</strong>g). The pumps should be<br />
equipped with an check valve. The<br />
supply side <strong>of</strong> the pump must be<br />
equipped with a stop valve. Both<br />
pumps must be fitted to be operated<br />
simultaneously for higher flow rates <strong>in</strong><br />
case <strong>of</strong> heavy ra<strong>in</strong>falls.<br />
� Pressure High 70 m by flow rate 100<br />
m³/h<br />
� Electric power max. 50 kW<br />
The contractor has to specify the<br />
suitability <strong>of</strong> the pumps.<br />
The pumps should be delivered and<br />
<strong>in</strong>stalled <strong>in</strong>clud<strong>in</strong>g all fitt<strong>in</strong>gs and<br />
pipes (<strong>in</strong>ternal diameter di 150)<br />
piece 2
ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 63<br />
Item no. Description Unit Quantity Rate Amount<br />
12.2 High pressure pipe, diam. 150 mm<br />
Monobloc pipe made from extruded<br />
PE-HD has to be delivered and has to<br />
be laid out as a high pressure pipe for<br />
the above mentioned pumps. The<br />
<strong>in</strong>dividual pipes have to be connected<br />
by means <strong>of</strong> the heated tool butt<br />
weld<strong>in</strong>g process.<br />
<strong>Al</strong>l required works and services to be<br />
supplied for this process have to be<br />
<strong>in</strong>cluded <strong>in</strong> the standard price. Length<br />
<strong>of</strong> pipe approximately 35 m, three<br />
pipe bends (90 °) have to be <strong>in</strong>cluded<br />
<strong>in</strong> the standard price.<br />
External pipe diameter 180 mm, wall<br />
thickness 16.4 mm. Pipe is suitable for<br />
pressure class SDR 11.<br />
The unit price also <strong>in</strong>cludes all<br />
necessary earthworks (excavations<br />
and fill<strong>in</strong>gs <strong>of</strong> the necessary trenches<br />
<strong>in</strong>clud<strong>in</strong>g the pipe embedment) <strong>in</strong> the<br />
outside slope <strong>of</strong> the <strong>landfill</strong>. The pipe<br />
embedment shall consist <strong>of</strong> soil with a<br />
maximum gra<strong>in</strong> size <strong>of</strong> 8 mm. The<br />
pipe shall be covered at least 20 cm<br />
with embedment material on all sides.<br />
Width <strong>of</strong> the excavation works as<br />
required for <strong>in</strong>corporat<strong>in</strong>g a proper<br />
pipe embedment as described above.<br />
Depth <strong>of</strong> the trench as necessary for a<br />
depth <strong>of</strong> coverage above the pipes <strong>of</strong><br />
at least<br />
50 cm.<br />
The surplus <strong>of</strong> excavated soil or soil<br />
which is unsuitable for fill<strong>in</strong>g<br />
purposes shall become the property<br />
<strong>of</strong> the Contractor and shall be<br />
removed from site and shall be<br />
disposed <strong>of</strong> at the expense <strong>of</strong> the<br />
Contractor.<br />
<strong>Al</strong>l excavation works and all trench<br />
fill<strong>in</strong>gs <strong>in</strong>clud<strong>in</strong>g the pipe<br />
embedment have to be <strong>in</strong>cluded <strong>in</strong><br />
the unit price<br />
m 35
ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 64<br />
Item no. Description Unit Quantity Rate Amount<br />
12.3 Concrete obstruction (base), distribution<br />
platform<br />
Deliver and <strong>in</strong>corporate a concrete<br />
obstruction (base) on a 30 cm gravel<br />
bear<strong>in</strong>g course. Length / width = 1.5 x<br />
1.5 m, 25 cm high,<br />
The base must conta<strong>in</strong> a hole to lead<br />
through the pipe made <strong>of</strong> PEHD with<br />
an external diameter <strong>of</strong> 180 mm with<br />
the necessary r<strong>in</strong>g seal<strong>in</strong>g system.<br />
12.4 Distribution jo<strong>in</strong>t PEHD<br />
Deliver and <strong>in</strong>corporate a distribution<br />
jo<strong>in</strong>t made <strong>of</strong> PEHD or sta<strong>in</strong>less steel.<br />
This connections piece will be placed<br />
between the flexible pipes and the fix<br />
pipe DN 100 PEHD, Distribution jo<strong>in</strong>t<br />
with 1 entrance (pipe with external<br />
diameter <strong>of</strong> 180 mm) and 3 exits<br />
(<strong>in</strong>ternal diameter DN 100) with the<br />
necessary coupl<strong>in</strong>gs for the below<br />
mentioned flexible pipes and slide<br />
valves to shut <strong>of</strong>f the unused pipes.<br />
The standard price <strong>in</strong>cludes material<br />
costs, weld<strong>in</strong>g, connections etc.<br />
12.5 flexible pipes, length 50 m<br />
Deliver flexible pipes (hoses) with a<br />
complete length <strong>of</strong> appr. 50 m per<br />
unit, The hoses have to be delivered<br />
with a coupl<strong>in</strong>g to connect them with<br />
one another respectively with the<br />
below mentioned water distribution<br />
system (wide area spr<strong>in</strong>kler) and the<br />
distribution jo<strong>in</strong>t (item 12.4). The<br />
hoses have to be w<strong>in</strong>ded up on a tray<br />
(drum) for easy transport. Diameter <strong>of</strong><br />
the pipes appr. 100 mm. <strong>Al</strong>l delivered<br />
pieces must be available on the spot,<br />
so replacement pieces can be bought<br />
easily<br />
piece<br />
piece<br />
piece<br />
1<br />
1<br />
3
ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 65<br />
Item no. Description Unit Quantity Rate Amount<br />
12.6 Magnetic - <strong>in</strong>ductive flow meter<br />
MID DN 150<br />
MID has to be delivered and <strong>in</strong>corporated<br />
<strong>in</strong> PE-HD pipes, flow meter<br />
regulated with microprocessor and<br />
supervised, compacted construction<br />
pr<strong>in</strong>cipal <strong>of</strong> measurement accord<strong>in</strong>g to<br />
<strong>in</strong>ductive low <strong>of</strong> Farrady construction:<br />
compact meter, registration <strong>of</strong><br />
measurements together with adapted<br />
equipment for transformation <strong>of</strong><br />
measurements, pipe diameter DN 100,<br />
length <strong>of</strong> construction: accord<strong>in</strong>g to<br />
DVGW, supply for processor: flange<br />
accord<strong>in</strong>g to DIN 2501, <strong>in</strong> steel ST 37.2,<br />
pressure class SDR 11, cas<strong>in</strong>g:<br />
alum<strong>in</strong>ium die-cast<strong>in</strong>g metal, varnished<br />
surfac<strong>in</strong>g with hard rubber electrodes<br />
made <strong>of</strong> sta<strong>in</strong>less steel 1.4571<br />
Temperature <strong>of</strong> leachate: 0 to 50 °C,<br />
protection code: IP 65 range <strong>of</strong><br />
measurement <strong>in</strong> m³/h, accuracy <strong>of</strong><br />
measurement: +/- 0,5 %, dynamic <strong>of</strong><br />
measurement: 1000:1<br />
exit: analogous: 0/4 ... 20 mA, bidirectional<br />
and impulse frequency:<br />
ipen collector, programmable<br />
energy supply: 85 260 V, 50/60 Hz piece 1<br />
12.7 OP-Panel<br />
Supply and <strong>in</strong>stallation <strong>in</strong> work<strong>in</strong>g<br />
conditions <strong>of</strong> a digital operation<br />
equipment (OP-panel) with liquid<br />
crystal (text) display, 4 l<strong>in</strong>es and 20<br />
symbols per l<strong>in</strong>e have to be describeable.<br />
Foil keyboard with 22 system<br />
keys and 8 free function keys that can<br />
be parametered and signed, <strong>of</strong> it 4<br />
keys with LED-display 128 kB FEPROM<br />
user memory<br />
<strong>in</strong>terface: pro data bus DP and RS232<br />
TTY and transmission rate: 1,5<br />
MBit/sec. <strong>in</strong> m<strong>in</strong>imum<br />
protective system: IP 65, item <strong>in</strong>cludes<br />
all accessories<br />
piece 1
ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 66<br />
Item no. Description Unit Quantity Rate Amount<br />
12.8 Central Process<strong>in</strong>g Unit CPU<br />
Supply and <strong>in</strong>stallation <strong>in</strong> work<strong>in</strong>g<br />
conditions <strong>of</strong> a central processor unit<br />
(CPU) with a system (data) bus for<br />
several transfers at the same time and<br />
an additional PROFIBUS-DP-<strong>in</strong>terface,<br />
able for configuration as master or<br />
slave. Work<strong>in</strong>g time: 300 ns for each<br />
b<strong>in</strong>ary <strong>in</strong>struction <strong>in</strong>terface (MPI) for 4<br />
static and 8 dynamic l<strong>in</strong>ks for network<br />
with 16 processor assemblies <strong>in</strong><br />
maximum (rate <strong>of</strong> transition: 187,5<br />
kBit/sec);<br />
The de-central periphery (at the<br />
PROFIBUS) has to be handled like the<br />
central periphery, data storage free <strong>of</strong><br />
ma<strong>in</strong>tenance without battery <strong>of</strong> all<br />
important data (NVRAM);<br />
LED display for show<strong>in</strong>g mistakes <strong>in</strong><br />
hardware, programs, time, periphery,<br />
battery or data bus and for state <strong>of</strong><br />
operation for run, stop etc., the<br />
assembly has to be <strong>of</strong>fered and<br />
delivered for the necessary operation<br />
system and all supplement systems,<br />
<strong>in</strong>clud<strong>in</strong>g all licences.<br />
12.9 Memory Card<br />
Supply and <strong>in</strong>stallation <strong>in</strong> work<strong>in</strong>g<br />
conditions <strong>of</strong> a memory card memory<br />
capacity: 256 kByte, FEPROM<br />
implementation card has to be <strong>in</strong><br />
accordance to the total data storage<br />
<strong>of</strong> the bided CPU;<br />
12.10 Analogues Input Assembly<br />
Supply and <strong>in</strong>stallation <strong>in</strong> work<strong>in</strong>g<br />
conditions <strong>of</strong> an analogous <strong>in</strong>put<br />
assembly; 8 analogous <strong>in</strong>puts (4 by<br />
resistance measur<strong>in</strong>g) with potential<br />
division between the channels and<br />
an <strong>in</strong>put/output system (data) bus;<br />
piece<br />
piece<br />
piece<br />
1<br />
1<br />
1
ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 67<br />
Item no. Description Unit Quantity Rate Amount<br />
12.11 Analogues Output Assembly<br />
Supply and <strong>in</strong>stallation <strong>in</strong> work<strong>in</strong>g<br />
conditions <strong>of</strong> an analogous output<br />
assembly; 4 analogous outputs with<br />
potential division between the<br />
channels, a voltage supply and a<br />
<strong>in</strong>put/output system (data) bus<br />
ranges <strong>of</strong> outputs have to be able for<br />
regulation for each channe<br />
12.12 Vibration Limit Circuit<br />
Supply and <strong>in</strong>stallation <strong>in</strong> work<strong>in</strong>g<br />
conditions <strong>of</strong> a vibration limit circuit<br />
for liquids,<br />
resistance aga<strong>in</strong>st leachate <strong>of</strong> a<br />
<strong>landfill</strong> us<strong>in</strong>g as protection for<br />
runn<strong>in</strong>g without liquid construction<br />
with lengthened pipe with pressured<br />
encased cas<strong>in</strong>g, item <strong>in</strong>cludes all<br />
necessary accessories<br />
12.13 Water Pilot<br />
Supply and <strong>in</strong>stallation <strong>in</strong> work<strong>in</strong>g<br />
conditions <strong>of</strong> a hydrostatic water<br />
pilot for permanent measur<strong>in</strong>g <strong>of</strong><br />
fill<strong>in</strong>g level <strong>in</strong>side a shaft<br />
for regulation <strong>of</strong> the limited fill<strong>in</strong>g<br />
levels and for <strong>in</strong>tegration to the<br />
different automatic systems,<br />
construction with lengthened pipe<br />
(up to 3 m) and thread or flange item<br />
<strong>in</strong>cludes all necessary accessories<br />
piece<br />
piece<br />
piece<br />
1<br />
1<br />
1
ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 68<br />
Item<br />
no.<br />
Description Unit Quantity Rate Amount<br />
12.14 Outside Switch Board<br />
Supply and <strong>in</strong>stallation <strong>in</strong> work<strong>in</strong>g<br />
conditions <strong>of</strong> a detached outside distributor<br />
for SPS-registration, <strong>in</strong>clud<strong>in</strong>g all<br />
safeties protection code: IP 65, cas<strong>in</strong>g<br />
made <strong>of</strong> strengthened fibreglass<br />
<strong>in</strong>clud<strong>in</strong>g lock, thermo-static airconditioned<br />
with sufficient air change,<br />
<strong>in</strong>clud<strong>in</strong>g lightn<strong>in</strong>g for switchboard,<br />
door switch, socket (system schuko) and<br />
bag for plans, <strong>in</strong>clud<strong>in</strong>g necessary base<br />
made <strong>of</strong> prefabricated concrete and<br />
<strong>in</strong>sert <strong>of</strong> cables (from bottom), <strong>in</strong>clud<strong>in</strong>g<br />
<strong>in</strong>stallation <strong>of</strong> the described SPSassembly,<br />
safeties and all other<br />
equipment, <strong>in</strong>clud<strong>in</strong>g <strong>in</strong>stallation <strong>of</strong> a<br />
chang<strong>in</strong>g operation <strong>of</strong> the leachate<br />
pumps (each 50 kW)<br />
piece 1<br />
12.15 Pressure Gauge<br />
Supply and <strong>in</strong>stallation <strong>in</strong> work<strong>in</strong>g<br />
conditions <strong>of</strong> a pressure gauge (manometer)<br />
with spr<strong>in</strong>g (feather), bayonet<br />
socket made <strong>of</strong> sta<strong>in</strong>less steel,<br />
connection with G ½´´, <strong>in</strong>dication <strong>of</strong><br />
measurement DN 100 mm,<br />
measurement range 0 - 16 bar and three<br />
step tap DN 25, on both sides female<br />
thread R ½´´ with control flanges<br />
piece 2<br />
12.16 Connection <strong>of</strong> all Equipment to<br />
Control and Monitor<strong>in</strong>g Central<br />
<strong>Al</strong>l equipment (pumps, slide valves, MID,<br />
water pilot, vibration limit circuit,<br />
pressure gage etc.) have to be<br />
connected via cable to the control and<br />
monitor<strong>in</strong>g central; <strong>in</strong> this item all<br />
connections <strong>of</strong> cables to the appropriate<br />
equipment have to be <strong>of</strong>fered; therefore<br />
from each equipment an appropriate<br />
cable with a length <strong>of</strong> about 30 m has to<br />
be calculated, distribution switchboard<br />
will be located nearby the pump station;<br />
<strong>in</strong>clud<strong>in</strong>g lay<strong>in</strong>g <strong>of</strong> all requested cables<br />
piece<br />
1
ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 69<br />
Item no. Description Unit Quantity Rate Amount<br />
12.17 Program<strong>in</strong>g and Implementation <strong>of</strong><br />
Control and Monitor<strong>in</strong>g Central<br />
programm<strong>in</strong>g and implementation <strong>of</strong><br />
total control and regulation central<br />
(for pumps, slide valves and all other<br />
necessary equipment) has to be done;<br />
def<strong>in</strong>ition <strong>of</strong> parameter, <strong>in</strong>troduction<br />
<strong>of</strong> <strong>landfill</strong> staff and eventually<br />
necessary changes <strong>of</strong> parameters<br />
dur<strong>in</strong>g a period <strong>of</strong> time <strong>of</strong> 6 month<br />
after start<strong>in</strong>g up (test<strong>in</strong>g phase)<br />
documentation <strong>in</strong>cludes all work<strong>in</strong>g<br />
draw<strong>in</strong>gs, construction plans,<br />
diagrams, operat<strong>in</strong>g <strong>in</strong>structions and<br />
all additional documents (on CD-Rom<br />
piece 1<br />
and hard copy, <strong>in</strong> triplicate)<br />
12.18 Test and Commission<strong>in</strong>g <strong>of</strong> total<br />
Recirculation System<br />
Leachate Recirculation System has to<br />
be cleaned after construction tested.<br />
The commission<strong>in</strong>g phase has to<br />
<strong>in</strong>clude all necessary tests to prove<br />
functionality <strong>of</strong> the system.<br />
piece<br />
1<br />
Total for <strong>Bill</strong> No. 12<br />
(carried forward to Summary)
ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 70<br />
<strong>Bill</strong> No. 13: Surface Water Collection<br />
Item no. Description Unit Quantity Rate Amount<br />
13.1 Dra<strong>in</strong>age ditch, earthworks<br />
A dra<strong>in</strong>age ditch or trench along the<br />
outer side <strong>of</strong> the <strong>landfill</strong> r<strong>in</strong>g road has<br />
to be produced (north-western area<br />
<strong>of</strong> cell ST). The separated material has<br />
to be loaded, transported to a storage<br />
place <strong>of</strong> the Contractor.<br />
The width <strong>of</strong> the ditch is<br />
approximately 2.0 m, the bottom<br />
width is 1.0 m, the average depth is<br />
0.5 m. The produc<strong>in</strong>g has to be done<br />
<strong>in</strong> sections <strong>of</strong> different length.<br />
13.2 Excavation for trapezoidal ditch<br />
Excavation respectively earthworks<br />
for the trapezoidal ditch has to be<br />
done.<br />
The average depth <strong>of</strong> excavation is up<br />
to 0.6 m, the width is 1.2 to 1.5 m.<br />
<strong>Al</strong>l other works <strong>in</strong> 13.1.,<br />
The payment has to be calculated<br />
accord<strong>in</strong>g to the length <strong>of</strong> the chute,<br />
regardless <strong>of</strong> width. The length will be<br />
measured along the axis <strong>of</strong> the<br />
trapezoidal chute.<br />
13.3 Trapezoidal ditch, 30 cm high<br />
A trapezoidal ditch made <strong>of</strong> prefabricated<br />
concrete units has to be<br />
delivered and placed <strong>in</strong> the specified<br />
slope on a 20 cm gravel bear<strong>in</strong>g<br />
course. In the area <strong>of</strong> the <strong>in</strong>cl<strong>in</strong>ed side<br />
walls a gravel bear<strong>in</strong>g course has to<br />
be done also. The jo<strong>in</strong>ts have to be<br />
closed tight with cement mortar. The<br />
trapezoidal chute has to be<br />
constructed with clear dimensions <strong>of</strong>:<br />
- width on top: 1.00 m<br />
- width <strong>in</strong> bottom area: 0.40 m<br />
- tap (depth): 0.30 m<br />
The <strong>in</strong>corporation has to be done<br />
along the <strong>landfill</strong> r<strong>in</strong>g road for surface<br />
water discharge<br />
m<br />
m<br />
m<br />
150<br />
650<br />
650
ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 71<br />
Item no. Description Unit Quantity Rate Amount<br />
13.4 Natural stone pav<strong>in</strong>g around<br />
culverts etc.<br />
Natural stones (granite or lime quarry<br />
stone) have to be delivered and<br />
placed as paved area on slopes, <strong>in</strong><br />
hollows and ditches, or as an<br />
enclosure <strong>of</strong> constructional units or<br />
culverts at erratically distances. The<br />
pav<strong>in</strong>g has to be done true to pr<strong>of</strong>ile<br />
and level on thick bedd<strong>in</strong>g made <strong>of</strong><br />
concrete, thickness 15 cm, and with<br />
jo<strong>in</strong>ts with a width <strong>of</strong> 5 cm <strong>in</strong><br />
maximum. Natural cleft quarry stones<br />
<strong>of</strong> largely cubical shape and with<br />
edge lengths between 10 cm and 30<br />
cm have to be used.<br />
Jo<strong>in</strong>ts have to be filled with a mixture<br />
made <strong>of</strong> sand and cement.<br />
<strong>Al</strong>l works <strong>in</strong>cluded<br />
13.5 Stones for hydraulic structures for<br />
erosion protection<br />
Granite stones with an edge length<br />
from 30 cm to 50 cm have to be<br />
delivered and <strong>in</strong>corporated as an<br />
erosion protection <strong>in</strong> the outlet area<br />
<strong>of</strong> culverts made <strong>of</strong> site concrete (as<br />
rubble layer).<br />
Jo<strong>in</strong>ts have to be filled with b<strong>in</strong>d<strong>in</strong>g<br />
soil taken from the job-site.<br />
Payment accord<strong>in</strong>g to supply notes.<br />
m2<br />
tons<br />
25<br />
10
ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 72<br />
Item no. Description Unit Quantity Rate Amount<br />
13.6 Re<strong>in</strong>forced concrete pipes with an<br />
<strong>in</strong>ternal diameter 800 mm<br />
Re<strong>in</strong>forced concrete pipes with a<br />
circular cross section, with a bell and<br />
spigot jo<strong>in</strong>t ("bell" sleeve) and an<br />
<strong>in</strong>ternal diameter <strong>of</strong> 800 mm have to<br />
be delivered and <strong>in</strong>corporated as a<br />
(dra<strong>in</strong>age) culvert underneath along<br />
the <strong>landfill</strong> r<strong>in</strong>g road. The concrete<br />
cover <strong>of</strong> re<strong>in</strong>forcement has to be<br />
m<strong>in</strong>imum 30 mm on the <strong>in</strong>side and<br />
outside. The pipe connections have to<br />
be done with a seal<strong>in</strong>g r<strong>in</strong>g <strong>of</strong><br />
elastomer plastic which is<br />
<strong>in</strong>corporated <strong>in</strong> the sleeve by the<br />
manufacturer. The pipe support shall<br />
be made <strong>of</strong> concrete C 12/15 EN 206-<br />
1 with a support<strong>in</strong>g angle <strong>of</strong> 120<br />
degrees, thickness <strong>of</strong> the pipe support<br />
m<strong>in</strong>imum 15 cm.<br />
The pipes shall be laid <strong>in</strong> a trench. The<br />
pipe embedment shall consist <strong>of</strong><br />
coarse-gra<strong>in</strong>ed soil with a maximum<br />
gra<strong>in</strong> size <strong>of</strong> 32 mm. The pipe shall be<br />
covered at least 20 cm with<br />
embedment material on all sides.<br />
The rema<strong>in</strong><strong>in</strong>g trench fill<strong>in</strong>g shall<br />
consist <strong>of</strong> coarse-gra<strong>in</strong>ed soil with a<br />
maximum gra<strong>in</strong> size <strong>of</strong> 63 mm.<br />
Width and depth <strong>of</strong> the excavation<br />
works as required for <strong>in</strong>corporat<strong>in</strong>g<br />
the pipes under trench conditions.<br />
The surplus <strong>of</strong> excavated soil or soil<br />
which is unsuitable for fill<strong>in</strong>g<br />
purposes shall become the property<br />
<strong>of</strong> the Contractor and shall be<br />
removed from site and shall be<br />
disposed <strong>of</strong> at the expense <strong>of</strong> the<br />
Contractor.<br />
<strong>Al</strong>l excavation works and all trench<br />
fill<strong>in</strong>gs <strong>in</strong>clud<strong>in</strong>g the pipe<br />
embedment have to be <strong>in</strong>cluded <strong>in</strong><br />
the unit price.<br />
m 40
ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 73<br />
Item no. Description Unit Quantity Rate Amount<br />
13.7 Re<strong>in</strong>forced concrete pipes with an<br />
<strong>in</strong>ternal diameter 300 mm<br />
A re<strong>in</strong>forced concrete pipe with a<br />
circular cross section and an <strong>in</strong>ternal<br />
diameter <strong>of</strong> 300 mm shall to be<br />
delivered and <strong>in</strong>corporated as an <strong>in</strong>let<br />
system for the <strong>in</strong>let structure <strong>of</strong> the<br />
culvert underneath the r<strong>in</strong>g road<br />
accord<strong>in</strong>g to the respective detail<br />
plan<br />
The concrete cover <strong>of</strong> re<strong>in</strong>forcement<br />
has to be m<strong>in</strong>imum 30 mm on the<br />
<strong>in</strong>side and outside.<br />
The length <strong>of</strong> the pipe piece shall be<br />
about 2 meters. The pipe shall be<br />
without a jo<strong>in</strong>t.<br />
The pipe support shall be made <strong>of</strong><br />
concrete C 12/15 EN 206-1, thickness<br />
<strong>of</strong> the pipe support m<strong>in</strong>imum 15 cm.<br />
The price for the pipe support shall be<br />
<strong>in</strong>cluded <strong>in</strong> the unit price.<br />
13.8 Quarry stones for protection <strong>of</strong><br />
slope area leachate pond<br />
Quarry stones have to be delivered<br />
and <strong>in</strong>corporated as a protection <strong>in</strong><br />
the slope area <strong>of</strong> the leachate pond.<br />
Slope 1:2<br />
Height <strong>of</strong> the stones 8 to 10 cm, edge<br />
length from 25 to 30 cm, square form.<br />
The stones have to be as uniform as<br />
possible.<br />
piece<br />
s<br />
m2<br />
2<br />
4,000<br />
Total for <strong>Bill</strong> No. 13<br />
(carried forward to Summary)
ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 74<br />
<strong>Bill</strong> No. 14: Gas Collection<br />
Item no. Description Unit Quantity Rate Amount<br />
14.1 Perforated PE-HD pipe (external<br />
pipe diameter: 180 mm), SDR 11<br />
Perforated PE-HD pipe has to be<br />
delivered and stored protected<br />
aga<strong>in</strong>st weather conditions accord<strong>in</strong>g<br />
to the Project Manager’s<br />
specifications.<br />
PE-HD pipe with an external pipe<br />
diameter <strong>of</strong> 180 mm, suitable for<br />
pressure class SDR 11.<br />
Pipe perforated across the whole<br />
circumference, slot width: 10 mm,<br />
pipe length: about 4.0 m.<br />
Each pipe has to be provided with an<br />
adequate cover (welded, <strong>of</strong> HDPE).<br />
Pipe will be used as filter pipe for gas<br />
piece 90<br />
collection.<br />
14.2 Steel pipe DN 800<br />
Pipe made <strong>of</strong> steel with an <strong>in</strong>ternal<br />
diameter <strong>of</strong> 800 mm and a wall<br />
thickness <strong>of</strong> 8 mm <strong>in</strong> m<strong>in</strong>imum has to<br />
be delivered and stored protected<br />
aga<strong>in</strong>st weather conditions accord<strong>in</strong>g<br />
to the Project Manager’s<br />
specifications.<br />
Pipe has to be made <strong>of</strong> galvanized<br />
steel and <strong>in</strong>clud<strong>in</strong>g a gas-tight cover<br />
(with screwed connection and<br />
seal<strong>in</strong>g, see detail plan gas collection).<br />
A connection piece for pipes with an<br />
<strong>in</strong>ternal diameter <strong>of</strong> 80 mm has to be<br />
provided at the steel pipe.<br />
Pipe overall length: 4.0 m.<br />
Lugs (eyelets accord<strong>in</strong>g to detail plan)<br />
have to be welded at the top <strong>of</strong> the<br />
steel pipe for pull<strong>in</strong>g.<br />
Pipe will be used as protection pipe<br />
for the gas filter pipe and as pull pipe<br />
for lengthen<strong>in</strong>g the gas filter pipe<br />
(accord<strong>in</strong>g to the height <strong>of</strong> the waste).<br />
piece<br />
18
ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 75<br />
Item no. Description Unit Quantit<br />
y<br />
14.3 PE-HD EL pipes with an external<br />
diameter <strong>of</strong> 90 mm<br />
Monobloc (non perforated) pipes<br />
made <strong>of</strong> extruded PE-HD have to be<br />
delivered and stored protected<br />
aga<strong>in</strong>st weather conditions accord<strong>in</strong>g<br />
to the Project Manager’s<br />
specifications.<br />
The pipes have to be delivered <strong>in</strong><br />
bundles.<br />
Pipe with an external pipe diameter <strong>of</strong><br />
90 mm, wall thickness 5.1 mm, pipe<br />
suitable for pressure class SDR 17,6.<br />
The pipes have to be electrically<br />
conductive (EL). Surface resistivity
ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 76<br />
Item no. Description Unit Quantit<br />
y<br />
14.6 Support<strong>in</strong>g cone <strong>of</strong> crushed stone<br />
(32/56 mm)<br />
A support<strong>in</strong>g cone (see detail plan gas<br />
collection) for a pull pipe made <strong>of</strong><br />
steel has to be made for every gas<br />
vent. The material must be <strong>of</strong> limefree<br />
crushed stone <strong>of</strong> 32/56 mm gra<strong>in</strong><br />
size.<br />
The material has to be delivered,<br />
<strong>in</strong>corporated compacted accord<strong>in</strong>g to<br />
the Project Manager’s specifications.<br />
Fill<strong>in</strong>g height approximately 1.0 m,<br />
floor space approximately 5.0 x 5.0 m,<br />
Incl<strong>in</strong>ation <strong>of</strong> slope 1:1.5.<br />
piece 18<br />
14.7 PEHD Monobloc Pipe 400*36.3 mm<br />
A monobloc pipe made from<br />
extruded PE-HD shall be supplied and<br />
<strong>in</strong>corporated as a gas collection pipe<br />
accord<strong>in</strong>g to the manufacturer's<br />
guidel<strong>in</strong>es and/or the <strong>in</strong>structions <strong>of</strong><br />
the Project Manager.<br />
The external pipe diameter shall be<br />
400 mm, the wall thickness 36.3 mm<br />
and suitable for pressure class SDR 11.<br />
<strong>Al</strong>l other works as expla<strong>in</strong>ed <strong>in</strong> item<br />
no. 10.2.<br />
The unit price also <strong>in</strong>cludes all<br />
necessary earthworks (excavations<br />
and fill<strong>in</strong>gs <strong>of</strong> the necessary trenches<br />
<strong>in</strong>clud<strong>in</strong>g the pipe embedment) <strong>in</strong> the<br />
area between the r<strong>in</strong>g road and the<br />
<strong>landfill</strong>. The pipe embedment shall<br />
consist <strong>of</strong> soil with a maximum gra<strong>in</strong><br />
size <strong>of</strong> 8 mm. The pipe shall be<br />
covered at least 20 cm with<br />
embedment material on all sides.<br />
Width <strong>of</strong> the excavation works as<br />
required for <strong>in</strong>corporat<strong>in</strong>g a proper<br />
pipe embedment as described above.<br />
Depth <strong>of</strong> the trench as necessary for a<br />
depth <strong>of</strong> coverage above the pipes <strong>of</strong><br />
at least 50 cm.<br />
Rate Amount
ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 77<br />
Item no. Description<br />
The surplus <strong>of</strong> excavated soil or soil<br />
which is unsuitable for fill<strong>in</strong>g<br />
purposes shall become the property<br />
<strong>of</strong> the Contractor and shall be<br />
removed from site and shall be<br />
disposed <strong>of</strong> at the expense <strong>of</strong> the<br />
Contractor.<br />
<strong>Al</strong>l excavation works and all trench<br />
Unit Quantit<br />
y<br />
Rate Amount<br />
fill<strong>in</strong>gs <strong>in</strong>clud<strong>in</strong>g the pipe<br />
embedment have to be <strong>in</strong>cluded <strong>in</strong><br />
the unit price.<br />
m 150<br />
14.8 T-Piece PE-HD, external diameter<br />
400/400, SDR 11<br />
A t-piece with made from <strong>in</strong>jectionmoulded<br />
PE-HD shall be supplied and<br />
<strong>in</strong>stalled <strong>in</strong> the gas collection pipe<br />
accord<strong>in</strong>g to the manufacturer's<br />
guidel<strong>in</strong>es and/or the Project<br />
Manager's <strong>in</strong>structions.<br />
The external pipe diameter shall be<br />
315 mm, the wall thickness shall be<br />
36.3 mm on all sides.<br />
<strong>Al</strong>l other works as expla<strong>in</strong>ed <strong>in</strong> item<br />
no. 10.4 resp. 10.1<br />
piece 1<br />
Total for <strong>Bill</strong> No. 14<br />
(carried forward to Summary)
ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 78<br />
<strong>Bill</strong> No. 15: Special Equipment<br />
Item no. Description Unit Quantity Rate Amount<br />
15.1 Truck weighbridge<br />
Ma<strong>in</strong>tenance-free flush-mounted electro<br />
mechanic truck weighbridge with deep<br />
foundation. Designed for mount<strong>in</strong>g <strong>in</strong> a<br />
prefabricated foundation.<br />
Consist<strong>in</strong>g <strong>of</strong>:<br />
foundation<br />
- 4 compressive load balance cells NL<br />
35t made <strong>of</strong> sta<strong>in</strong>less steel, C4 quality<br />
- <strong>in</strong>sulation panel for the foundation<br />
- 1 term<strong>in</strong>al box IP 54<br />
- 8 bumpers for limitation <strong>of</strong> vibrations<br />
- 4 gap transitions for shock free<br />
pass<strong>in</strong>g over the weigh bridge<br />
- 1 central traversable vestibule<br />
open<strong>in</strong>g<br />
- 1 circumferential edge protection<br />
guard 60/60/8 mm<br />
precast concrete component bridge<br />
- bridge size 20 x 3 m<br />
- accessible from all directions<br />
- prefabricated concrete foundation<br />
approx. 20 x 3 m<br />
specifications:<br />
- maximum load: 60 tons<br />
- measur<strong>in</strong>g range: 0,2 to 30 tons<br />
- scale <strong>in</strong>terval: 0,01 tons<br />
- measur<strong>in</strong>g range: 30 to 60 tons<br />
- scale <strong>in</strong>terval: 0,02 tons<br />
- bridge size: 20 x 3 m<br />
The price <strong>in</strong>cludes all freight costs, all<br />
necessary equipment and works for<br />
<strong>in</strong>stallation <strong>of</strong> the weigh bridge and the<br />
foundation.<br />
<strong>Al</strong>so all wir<strong>in</strong>g and concrete works are<br />
<strong>in</strong>cluded as well as the acceptance test,<br />
statics and calibration.<br />
Foundation <strong>of</strong> weighbridge accord<strong>in</strong>g to<br />
item no. 11.3<br />
such as Pfister (Augsburg) "Classic"<br />
model or similar<br />
piece 1
ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 79<br />
Item no. Description Unit Quantity Rate Amount<br />
15.2 Control system for truck<br />
weighbridge<br />
Supply and <strong>in</strong>stallation <strong>of</strong> the technical<br />
equipment for the truck weighbridge.<br />
Consist<strong>in</strong>g <strong>of</strong>:<br />
Digital weigh<strong>in</strong>g term<strong>in</strong>al<br />
Commercially verifiable to precision<br />
class III, CE-tested, PTB-approved,<br />
verifiable upgradeable MPP data<br />
memory, impact-resistant ABS plastic<br />
hous<strong>in</strong>g, CE-approval, EMC-tested to<br />
EN 45501, radiance-pro<strong>of</strong> up to 10<br />
V/m, protection class IP 20, protection<br />
class front IP 65, analogue and digital<br />
load cells may be connected<br />
user languages: English, German,<br />
French, Italian, Spanish, Portuguese<br />
Weigh<strong>in</strong>g: Gross / Tare / Net<br />
4 possible operat<strong>in</strong>g modes: standard,<br />
sum,<br />
additive weigh<strong>in</strong>g,<br />
subtractive weigh<strong>in</strong>g<br />
Technical features<br />
- 6 operation-dependent s<strong>of</strong>t<br />
keys<br />
(several menu levels)<br />
- background-illum<strong>in</strong>ated LCD<br />
display, 135 x 32 mm<br />
- weight display 16 or 32 mm<br />
digit height selectable<br />
- ma<strong>in</strong>s connection 85 - 265 V<br />
AC, 50/60 Hz, 40 W, stra<strong>in</strong><br />
gauge load cell connection<br />
with 6-phase system, 12 load<br />
cells, 350 Ohms each<br />
- operat<strong>in</strong>g temperature: -10°C<br />
to + 40°C<br />
- storage temperature: -<br />
20°C to + 70 °C<br />
- relative humidity: max. 85%,<br />
non-condens<strong>in</strong>g<br />
- date / time <strong>of</strong> day: <strong>in</strong>tegrated,<br />
battery-buffered clock chip
ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 80<br />
Item no. Description Unit Quantity Rate Amount<br />
Data <strong>in</strong>terfaces<br />
- 1 serial <strong>in</strong>terface EIA RS 232<br />
- 1 serial <strong>in</strong>terface configurable<br />
EIA RS 232/422/485<br />
- 1 analogue output 0-10V/ 4–<br />
20mA, alternatively 0–20mA<br />
- 2 <strong>in</strong>puts opto-decoupled; 24 V<br />
DC, low active<br />
- 2 outputs potential-free relais<br />
contact, max 110V AC DC, 200<br />
mA, e.g. configurable for traffic<br />
lights or barrier control<br />
such as Pfister (Augsburg) "DWT 400"<br />
Pr<strong>in</strong>ter for digital weigh<strong>in</strong>g term<strong>in</strong>al<br />
Accord<strong>in</strong>g to the requirements <strong>of</strong> the<br />
customer and to be connected to the<br />
digital weigh<strong>in</strong>g term<strong>in</strong>al <strong>in</strong>clud<strong>in</strong>g all<br />
necessary cables.<br />
The price <strong>in</strong>cludes:<br />
- ready to use <strong>in</strong>stallation and<br />
calibration<br />
- <strong>in</strong>itiation and brief<strong>in</strong>g <strong>of</strong> the<br />
operat<strong>in</strong>g personal<br />
- production <strong>of</strong> an <strong>in</strong>struction<br />
manual <strong>in</strong>clud<strong>in</strong>g the<br />
construction, specifications,<br />
ma<strong>in</strong>tenance and possible<br />
technical failures.<br />
piece<br />
1
ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 81<br />
Item no. Description Unit Quantity Rate Amount<br />
15.3 Wheel Clean<strong>in</strong>g Unit<br />
Supply and <strong>in</strong>stallation <strong>of</strong> all required<br />
equipment for the truck wheel<br />
clean<strong>in</strong>g unit.<br />
The wheel clean<strong>in</strong>g unit has to be<br />
<strong>in</strong>stalled as a drive through bath that<br />
requires no power.<br />
Consist<strong>in</strong>g <strong>of</strong>:<br />
- 10 m long bath section<br />
- Width <strong>of</strong> bath section: 3.5 m<br />
- Height <strong>of</strong> bath section: about 52<br />
cm<br />
- Bath made as a steel construction<br />
- Bath section equipped with<br />
angled steel grids on <strong>in</strong>ternal<br />
sections<br />
- Removable <strong>in</strong>ternal grid sections<br />
for clean<strong>in</strong>g<br />
In addition:<br />
- Supply and <strong>in</strong>stallation <strong>of</strong> a 7,000<br />
litre header tank<br />
The price <strong>in</strong>cludes all freight costs, all<br />
necessary equipment and works for<br />
<strong>in</strong>stallation <strong>of</strong> the wheel clean<strong>in</strong>g unit<br />
and its foundation.<br />
Pr<strong>in</strong>ciple foundation <strong>of</strong> unit accord<strong>in</strong>g<br />
to item no. 14.6<br />
such as Wheel wash (Chesire UK)<br />
Drive Through Bath model or similar<br />
piece 1<br />
Total for <strong>Bill</strong> No. 15<br />
(carried forward to Summary)
ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 82<br />
<strong>Bill</strong> No. 16: Electrical Works<br />
Item no. Description<br />
A)Ma<strong>in</strong> Distribution board (MDB):<br />
Supply, <strong>in</strong>stall and commission ma<strong>in</strong><br />
and control panel board, the panel<br />
made <strong>of</strong> galvanized steel sheet 2mm<br />
thick, pa<strong>in</strong>ted with anti-rust primer<br />
pa<strong>in</strong>t and 2<br />
coats <strong>of</strong> f<strong>in</strong>al polyester pa<strong>in</strong>t with<br />
colour RAL …. As required by the<br />
eng<strong>in</strong>eer. The panel should be factory<br />
assembled c/w pvc coated cu bus<br />
bars <strong>of</strong> adequate sizes and all other<br />
accessories that may needed to<br />
complete the job and hand over <strong>in</strong><br />
operable conditions trenches, power<br />
and control wires, term<strong>in</strong>als bus bars<br />
neutral bus bar, earth<strong>in</strong>g bus bar<br />
ducts, supports, labels and numbers<br />
and all necessary accessories to<br />
complete<br />
the work as per draw<strong>in</strong>g and eng<strong>in</strong>eer<br />
Instruction.<br />
The panel sizes should be 210 cm<br />
height, 50 cm depth while the width<br />
to be determ<strong>in</strong>ed after shop draw<strong>in</strong>gs<br />
and<br />
that all <strong>in</strong>ternal components were<br />
agreed upon.<br />
the panel shall <strong>in</strong>clude but not<br />
limited to the follow<strong>in</strong>gs:<br />
Unit Quantity Rate Amount<br />
16.1 Three phase ma<strong>in</strong> circuit breaker<br />
MCCB LTL 300A with<br />
over load protection and door handle<br />
No 1<br />
Moeller made or equivalent<br />
16.2 Over load current limit<strong>in</strong>g switch with<br />
O.L and short<br />
circuit release, adjustable 4-6A<br />
Moeller made or equivalent<br />
No 4
ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 83<br />
Item no. Description Unit Quantit<br />
y<br />
16.3 Signal <strong>in</strong>dication lamp R S T with<br />
resistance 220V,Two LTL switch 2x32A<br />
Set 2<br />
16.4 Current Transformer 3(300/5A) Set 4<br />
16.5 Three phase Kwh and KVAR meters 5A Set 1<br />
16.6 S<strong>in</strong>gle phase Kwh meter 5A No 3<br />
16.7 Measur<strong>in</strong>g devices ammeters 0-500A,<br />
voltmeter 0-500V <strong>in</strong>dicat<strong>in</strong>g lamps,<br />
electrical siren, panel light selector<br />
switch, herz meter mcb or fuses<br />
protection.<br />
Set 1<br />
16.8 Three phase surge arrestor protection<br />
50KA at the <strong>in</strong>com<strong>in</strong>g feeder to<br />
protect the system aga<strong>in</strong>st lightn<strong>in</strong>g<br />
No 1<br />
strikes<br />
ground.<br />
<strong>in</strong>clud<strong>in</strong>g connection to<br />
16.9 Automatic Transfer Switch (ATS) 3<br />
phase, motorized type made <strong>of</strong> two<br />
identical switches 4 poles each,<br />
400v, 4000A rat<strong>in</strong>g c/w mechanical<br />
and electrically <strong>in</strong>terlock and <strong>in</strong>clude<br />
also the ACU control unit<br />
Moeller made or equivalent<br />
Set 1<br />
16.10 Power factor correction unit 70KVAR<br />
c/w 6stages control unit, three phase<br />
Set 1<br />
contactors AC3 category with<br />
16.11<br />
auxiliary contacts, mcb or fuses <strong>of</strong><br />
proper rat<strong>in</strong>g<br />
three poles static capacitors with<br />
resistances, toggle<br />
switches I-0-II and signal lamps and all<br />
necessary acc. for function<strong>in</strong>g<br />
Moeller made or equivalent<br />
Panel`s ventilation and anti-humidity<br />
units<br />
Set 1<br />
16.12 Front panel emergency Knock <strong>of</strong>f stop<br />
button with fuses<br />
Set 1<br />
16.13 Three phases NZMB1 40A with o.l. No.<br />
protection for MDB.B<br />
1<br />
16.14 1-phase 40A NZMB1 for DBSOCIAL No.<br />
Moller made or equivalent.<br />
1<br />
Rate Amount
ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 84<br />
Item no. Description Unit Quantity Rate Amount<br />
16.15 Three phase NZMN1 80A for No. 1<br />
16.16<br />
DBWORKSHOP Moller made<br />
or equivalent.<br />
Three phase NZMN4 200A for MDB<br />
Recirculation PUMP Moller made<br />
or equivalent.<br />
No. 1<br />
16.17 1phase MCCB 40A for DB control Moller<br />
made or equivalent.<br />
No. 1<br />
16.18 Three phase MCCB 3x40A with o.l<br />
protection for other load<br />
No. 1<br />
16.19 Three phase mcb 3x16/25A, Isc= 10KA @<br />
400V<br />
No. 1<br />
16.20 Ditto, but( 1x16)and( 1x32A) No. 4<br />
16.21 Three phase MCB 3x20A for external<br />
light<strong>in</strong>g.<br />
No. 1<br />
16.22 Adjustable under volt relay. No. 1<br />
16.23 Manual change over switch 4x400A with<br />
external panel handle Type SOCOMEC or<br />
substantially equivalent.<br />
B) DB RECIRCULATION:<br />
No. 1<br />
16.24 Supply and <strong>in</strong>stall complete electrical<br />
control panel (3x150 Amp) suitable for<br />
operation one submersible pump rated<br />
power <strong>of</strong> 50KW for recirculation use.<br />
Other two DB(rated 5KW) one for<br />
leachate while the other<br />
for surface water pump. The panel<br />
should provide the required protection<br />
with all associated power and<br />
control circuits as per the follow<strong>in</strong>g<br />
specification<br />
<strong>in</strong>structions:<br />
and the eng<strong>in</strong>eer<br />
Hot dip galvanized steel panel board<br />
enclosure with<br />
electrostatic pa<strong>in</strong>ts thickness not less<br />
than 2mm and<br />
30% spare space <strong>in</strong>clud<strong>in</strong>g the follow<strong>in</strong>g:<br />
One motor ma<strong>in</strong> breaker 3x125A type<br />
NZMN2-125A.<br />
Three phase solid state reduce voltage<br />
for motor control digital microprocessor<br />
with its control as per standard<br />
manufacturer recommendation. S<strong>of</strong>t<br />
starter No. 1
ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 85<br />
RVS-DN 105 Type Solcon or substantially<br />
equivalent<br />
with bypass contactors type DILMM125<br />
with auxiliary<br />
contacts 2N.C, 2N.O or substantially<br />
equivalent.<br />
Instrumentation and measur<strong>in</strong>g devices<br />
,voltmeter with 7step switch, ampere<br />
meters, Hz meter, current meters,<br />
electrical siren, and panel light<strong>in</strong>g.<br />
Lightn<strong>in</strong>g protection circuit with light<strong>in</strong>g<br />
protection de-<br />
vice SPB-12/280/4 Moller type with<br />
protection fuse holder and fuses and<br />
wir<strong>in</strong>g as per manufacture<br />
recommendation.<br />
Front panel emergency Knock <strong>of</strong>f stop<br />
button with<br />
fuses.<br />
Control circuits with isolat<strong>in</strong>g<br />
transformer 380/220-24v<br />
1000VA and <strong>in</strong>put output protections,<br />
adjustable under<br />
volt relays, timers relays, pumps control<br />
protection units (M<strong>in</strong>i Cas),high pressure<br />
control circuit, NVRs micro -switches<br />
control circuit, four position( 0-1-2-3)<br />
control switches,3phase H,O,A switches,<br />
pushbuttons,<br />
circuit breakers fuses with holders,(the<br />
red marked items are to be provided on<br />
shop draw<strong>in</strong>g),cool<strong>in</strong>g fans, and<br />
panel heater with its control circuits.<br />
signal <strong>in</strong>dication lamp R.S.T with LTL and<br />
push button<br />
current transformers 3(150/5A).<br />
2(3X20A) MCCB for DB Leachate and DB<br />
surface water pump<br />
(1X16 FAZ-C16/1) as spare.<br />
The break<strong>in</strong>g capacity <strong>of</strong> the breakers<br />
shall be as m<strong>in</strong>imum 50 KA @ 400 V.<br />
<strong>Al</strong>l necessary power and control wires.<br />
term<strong>in</strong>als, bus-bars, ducts, support labels<br />
and numbers ..etc as per eng<strong>in</strong>eer’<br />
<strong>in</strong>struction<br />
power factor correction unit 40KVAR c/w<br />
6stages control unit, three phase
ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 86<br />
contactors AC3 category with auxiliary<br />
contacts, mcb or fuses <strong>of</strong> proper rat<strong>in</strong>g<br />
three poles static<br />
capacitors with resistances, toggle<br />
switches 1-0-11 and<br />
signal lamps and all necessary acc. For<br />
function<strong>in</strong>g Moeller made or equivalent.<br />
16.25 Supply and <strong>in</strong>stall electrical float switch<br />
<strong>in</strong>side the treated wastewater wet well,<br />
IP 68 with N.O and N.C 10A contacts,<br />
supply voltage 24 V mercury bulb switch<br />
type is FLYGT or substantially equivalent,<br />
the price <strong>in</strong>cludes pedestal mounted<br />
weather pro<strong>of</strong> junction box outside the<br />
wet well, all float switches should be<br />
protected by 8 " UPVC pipe fixed to the<br />
wet pit wall with sta<strong>in</strong>less steel<br />
connectors and supports, brackets and<br />
all required C.B, cables, conduits, ducts,<br />
cable glands, excavation and back fill<strong>in</strong>g<br />
to connect the float switch to the ma<strong>in</strong><br />
control panel as per the eng<strong>in</strong>eer<br />
<strong>in</strong>structions.<br />
16.26 Supply and <strong>in</strong>stall micro-switches IP 65<br />
with N.O and N.C 10A contacts type is<br />
Moeller or substantially equivalent,<br />
connected to NRVs on the check valves<br />
the price <strong>in</strong>cludes all required C.B, cables,<br />
conduits, ducts, excavation and back<br />
fill<strong>in</strong>g to connect the micro-switch to<br />
the ma<strong>in</strong> control panel as per the<br />
eng<strong>in</strong>eer <strong>in</strong>structions.<br />
16.27 Supply and <strong>in</strong>stall pressure switch on the<br />
ma<strong>in</strong> header, the switch shall be<br />
adjustable (0-10 bars) danfoss type RT<br />
model or substantially equivalent , price<br />
<strong>in</strong>cludes all required C.B, cables,<br />
conduits, ducts, excavation and back<br />
fill<strong>in</strong>g to connect the switch to the ma<strong>in</strong><br />
control panel as per the eng<strong>in</strong>eer<br />
<strong>in</strong>structions.<br />
NO. 2<br />
NO. 1<br />
NO. 1
ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 87<br />
Item no. Description Unit Quantity Rate Amount<br />
16.28 Supply and <strong>in</strong>stall power and data<br />
cables from the control panel to the<br />
flow meter and between the flow<br />
meter transmitter and transducer, size<br />
and specifications <strong>of</strong> the cables as per<br />
the flow meter manufacturer, the<br />
work <strong>in</strong>cludes 1*16A electronic<br />
protection socket from over voltage<br />
and Lightn<strong>in</strong>g with time delay and to<br />
complete the work as per the<br />
eng<strong>in</strong>eer <strong>in</strong>structions.<br />
NO. 1<br />
16.29 Supply and <strong>in</strong>stall and connect local<br />
disconnect switch 3*120A lockable<br />
type is Moeller sc rat<strong>in</strong>g 50KA to be<br />
<strong>in</strong>stalled close to the wet well <strong>in</strong>side<br />
water pro<strong>of</strong> panel, <strong>in</strong>clud<strong>in</strong>g<br />
emergency stop with rotat<strong>in</strong>g release<br />
Moeller type, the price <strong>in</strong>cludes<br />
power (4*35mm2 CU/XLPE) and<br />
control cables (6*1,5mm2CU/XLPE),<br />
cable glands, cable term<strong>in</strong>als, conduit,<br />
ducts, concrete works to <strong>in</strong>stall and<br />
protect the disconnect switch panel,<br />
excavation and backfill<strong>in</strong>g to connect<br />
the disconnect switch to the ma<strong>in</strong><br />
control panel as per the eng<strong>in</strong>eer<br />
<strong>in</strong>structions.<br />
NO. 1<br />
16.30 Supply and <strong>in</strong>stall earthl<strong>in</strong>g system Item 1<br />
<strong>in</strong>cludes, electrical manhole,<br />
electrodes, connectors, 50mm2<br />
copper wire from the electrodes to<br />
the control panel, test<strong>in</strong>g resistant<br />
must be not more than 2 (ohm).<br />
C) CABLES required for MDB<br />
/LS<br />
16.31 XLPE cable 3x185+150mm2 . L.m 300<br />
16.32 Ditto, but 5x10 mm2 . L.m 70<br />
16.33 Ditto, but 5x6 mm2 . L.m 30<br />
16.34 Ditto, but 3x4 mm2 L.m 50<br />
16.35 Ditto. But cable 3x2.5mm2<br />
D) CABLES required for MDB<br />
L.m 30<br />
16.36 XLPE cable 5x95mm2 . L.m 350<br />
16.37 Ditto, but 5x6 mm2(For leachate and<br />
surface water)<br />
L.m 100<br />
16.38 Ditto. But cable 3x2.5mm2 (For L.m 200
ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 88<br />
control).<br />
E) Standby Diesel Generator:<br />
16.39 Supply, <strong>in</strong>stall and commission heavy<br />
duty <strong>in</strong>dustrial type diesel generator<br />
set 250KVA, three phase, 0.8PF,<br />
1500Rpm, 400Volts, 50Hz <strong>in</strong>clud<strong>in</strong>g<br />
electronic governor digital control<br />
panel, daily fuel tank for 8 hrs<br />
operation all necessary protection<br />
facilities with orig<strong>in</strong>al made<br />
sound attenuator canopy <strong>of</strong> sound<br />
level
ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 89<br />
mounted on the ceil<strong>in</strong>g, with all acc.<br />
Needed type is Gaash or equal<br />
approved.<br />
16.44 1x60W Circular Glop Water pro<strong>of</strong><br />
ceil<strong>in</strong>g mounted with clear cover, and<br />
all accessories needed, type is Gaash,<br />
or equal approved.<br />
No. 1<br />
16.45 1x60W Wall mounted Glop,IP54,with<br />
polycarbonate cover Steel protection<br />
grill, and all accessories needed, type<br />
is<br />
No. 1<br />
Eleita Cat. No.20161 or equal<br />
approved.<br />
16.46 One gang-One way 220V-16A No. 1<br />
16.47<br />
ON/OFF.SP Switch, Type is Gewiss or<br />
equal approved.<br />
Two gangs, One way, sp switch, type<br />
is Gewiss or equal approved.(w.p)<br />
No. 1<br />
16.48 Ditto, but Water approved. No. 1<br />
16.49 Supply and <strong>in</strong>stall 4" dim. Wall No. 1<br />
mounted Etraction fan, With<br />
protection louver type is VENTA the<br />
work <strong>in</strong>cl.0.75' conduit.3x1.5mm2<br />
16.50<br />
NYA wires and all accessories needed<br />
as per draw<strong>in</strong>g and engr. Instruction.<br />
3-p<strong>in</strong>, 16A-220V socket outlet, type is<br />
Gewiss or equal approved.<br />
No. 3<br />
16.51 Ditto but Water pro<strong>of</strong>. No. 2<br />
16.52 Telephone socket outlet <strong>in</strong>cl. wires No.<br />
and all accessories pvc boxes….etc<br />
Type is Gewiss or equivalent.<br />
1<br />
16.53 sub distribution board for guard and<br />
control room<br />
Road light<strong>in</strong>g<br />
No. 1<br />
16.54 Galvanized steel pole with<br />
2arms,nob,basefixed to the ground<br />
with concrete basment,<strong>in</strong>cl.3"flixeble<br />
conduits cables, Manholes,<br />
excavat<strong>in</strong>g and s<strong>of</strong>t backfill<strong>in</strong>g,<br />
wir<strong>in</strong>g, MCB, Photocell kaja, CB and all<br />
accessories,12m height etc all work<br />
accord<strong>in</strong>g engr. Instruction<br />
No. 3<br />
16.55 250W street light projector With No. 6
ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 90<br />
3x4mm2 xlpe cable,IP-65 junction<br />
boxes, clmn, CB, and all accessories&<br />
Connection needed. type is Gaash .<br />
light<strong>in</strong>g for conta<strong>in</strong>er and concrete<br />
room.<br />
16.56 Supply and <strong>in</strong>stall fluorescent light<strong>in</strong>g<br />
fixture 2x36w with f<strong>in</strong>e polyester<br />
diffuser for surface mount<strong>in</strong>g, type is<br />
CA’ASH, SHATIEL or equivalent, the<br />
work <strong>in</strong>cludes all accessories needed .<br />
16.57 Supply<strong>in</strong>g and <strong>in</strong>stall<strong>in</strong>g round bulk<br />
head light, water pro<strong>of</strong> (ceil<strong>in</strong>g or wall<br />
mounted) with 18w PL lamps., type is<br />
CA’ASH, SHATIEL or equivalent, the<br />
work <strong>in</strong>cludes all accessories needed .<br />
No. 4<br />
No. 2<br />
16.58 "Supply and <strong>in</strong>stall one way switch No.<br />
<strong>in</strong>clud<strong>in</strong>g all accessories, cover with<br />
all requirements (btic<strong>in</strong>o type ) with<br />
pipes ( over false ceil<strong>in</strong>g fire resistance<br />
2<br />
pipes) ,cables NYY 3*1.5mm2<br />
16.59<br />
accord<strong>in</strong>g eng<strong>in</strong>eer<strong>in</strong>g <strong>in</strong>struction if<br />
needed , boxes cover…….etc . The<br />
work shall <strong>in</strong>clude remove an old<br />
exist<strong>in</strong>g pipes and boxes……….etc<br />
and <strong>in</strong>stall new network + repair the<br />
damages.<br />
Ditto , but double pole switches . No. 2<br />
16.60 Supply ,<strong>in</strong>stall extract fan 6” with No. 2<br />
movable shutter with all accessories<br />
16.61 "Supply and <strong>in</strong>stall s<strong>in</strong>gle socket<br />
outlet-16A <strong>in</strong>clud<strong>in</strong>g all accessories,<br />
cover with all requirements (btic<strong>in</strong>o<br />
type) with pipes (over false ceil<strong>in</strong>g fire<br />
resistance pipes), cables NYY<br />
3*2.5mm2 accord<strong>in</strong>g eng<strong>in</strong>eer<strong>in</strong>g<br />
<strong>in</strong>struction if needed, boxes<br />
cover…….etc. The work shall <strong>in</strong>clude<br />
remove an old exist<strong>in</strong>g pipes and<br />
boxes……….etc and <strong>in</strong>stall new<br />
network + repair the damages.<br />
16.62 Supply<strong>in</strong>g and <strong>in</strong>stall<strong>in</strong>g electrical<br />
ceil<strong>in</strong>g fan 220V\125W, with its wires,<br />
conduits, switch, connections…..etc.<br />
Type is CHMC or approved equivalent.<br />
No 4<br />
No. 4<br />
16.63 Ground<strong>in</strong>g arrangements for MDB L.s 1
ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 91<br />
made <strong>of</strong> 70mm2 bare copper<br />
conductor buried directly to the soil<br />
at 80cm depth and connected to<br />
copper rods 19mm dia, 3m long<br />
driven<br />
<strong>in</strong>to ground at convenient distances<br />
and connected to the E-bar <strong>in</strong><br />
Distribution<br />
should not<br />
board, the resistance<br />
be more than 2 ohms, all exposed<br />
metallic parts to be<br />
bonded to the system with proper<br />
means. Type: Furse or equivalent<br />
Follow up all requirement and pay<br />
fees cost required by GEDCO to<br />
obta<strong>in</strong> permit <strong>of</strong> supply<strong>in</strong>g 3x300<br />
L.s 1<br />
Amp. <strong>in</strong>cl. theprice <strong>of</strong> shared<br />
transformer if necessary and all the<br />
work<br />
accord<strong>in</strong>g GEDCO requirement.(The<br />
price relies on Gedco conditions)<br />
Total for <strong>Bill</strong> No. 16<br />
(carried forward to Summary)
ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 92<br />
UXOs and Solid Waste Management<br />
PAL 10-71646<br />
<strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong><br />
Summary:<br />
Item Description Total (US$)<br />
1. Total <strong>of</strong> <strong>Bill</strong> No. 1/ General items, general services Included <strong>in</strong> Unit Price<br />
2. Total <strong>of</strong> <strong>Bill</strong> No. 2/ Field Investigations Included <strong>in</strong> Unit Price<br />
3. Total <strong>of</strong> <strong>Bill</strong> No. 3 /Test Field Included <strong>in</strong> Unit Price<br />
4. Total <strong>of</strong> <strong>Bill</strong> No. 4 /Site Clearance Included <strong>in</strong> Unit Price<br />
5. Total <strong>of</strong> <strong>Bill</strong> No. 5 /Excavations<br />
6. Total <strong>of</strong> <strong>Bill</strong> No. 6 /Bentonite Mat<br />
7. Total <strong>of</strong> <strong>Bill</strong> No. 7 /Geo-membrane<br />
8. Total <strong>of</strong> <strong>Bill</strong> No. 8 /Geotextile<br />
9. Total <strong>of</strong> <strong>Bill</strong> No. 9 /Dra<strong>in</strong>age Layer<br />
10. Total <strong>of</strong> <strong>Bill</strong> No. 10 /PE-HD Works<br />
11. Total <strong>of</strong> <strong>Bill</strong> No. 11/ Concrete Works<br />
12. Total <strong>of</strong> <strong>Bill</strong> No. 12/ Leachate Recirculation<br />
13. Total <strong>of</strong> <strong>Bill</strong> No. 13 /Surface Water Collection<br />
14. Total <strong>of</strong> <strong>Bill</strong> No. 14/ Gas Collection<br />
15. Total <strong>of</strong> <strong>Bill</strong> No. 15/ Special Equipment<br />
16. Total <strong>of</strong> <strong>Bill</strong> No. 16 /Electrical Works<br />
Grand Total (US$) – Not <strong>in</strong>clud<strong>in</strong>g Value Added Tax<br />
(VAT)<br />
Grand Total (<strong>in</strong> letters):-------------------------------------------------------------<br />
Contractor’s Name:------------------------------------------------------------------<br />
Signature and Stamp:----------------------------------------------------------------<br />
Date:-------------------------------------------------------------------------------------