19.02.2013 Views

Short Term Rehabilitation of Johr Al Dik landfill in Gaza Bill ... - UNDP

Short Term Rehabilitation of Johr Al Dik landfill in Gaza Bill ... - UNDP

Short Term Rehabilitation of Johr Al Dik landfill in Gaza Bill ... - UNDP

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

ITB 2012-424<br />

UXOs and Solid Waste Management<br />

PAL 10-71646<br />

<strong>Short</strong> <strong>Term</strong> <strong>Rehabilitation</strong> <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> <strong>landfill</strong> <strong>in</strong> <strong>Gaza</strong><br />

<strong>Bill</strong> <strong>of</strong> Quantity<br />

<strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong><br />

PAL 10-71646 - UXOs and Solid Waste Management


ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 2<br />

A. Preamble<br />

1. The <strong>Bill</strong> <strong>of</strong> Quantities shall be read <strong>in</strong> conjunction with the Instructions to Bidders,<br />

General and Special Conditions <strong>of</strong> Contract, General and Technical Specifications, and<br />

Draw<strong>in</strong>gs.<br />

2. The quantities given <strong>in</strong> the <strong>Bill</strong> <strong>of</strong> Quantities are estimated and provisional, and are<br />

given to provide a common basis for bidd<strong>in</strong>g. The basis <strong>of</strong> payment will be the actual<br />

quantities <strong>of</strong> work ordered and carried out, as measured by the Contractor and verified by<br />

the Eng<strong>in</strong>eer and valued at the rates and prices bid <strong>in</strong> the priced <strong>Bill</strong> <strong>of</strong> Quantities, where<br />

applicable, and otherwise at such rates and prices as the Eng<strong>in</strong>eer may fix with<strong>in</strong> the terms<br />

<strong>of</strong> the Contract.<br />

3. The rates and prices bid <strong>in</strong> the priced <strong>Bill</strong> <strong>of</strong> Quantities shall, except <strong>in</strong>s<strong>of</strong>ar as it is<br />

otherwise provided under the Contract, <strong>in</strong>clude all Constructional Plant, labor, supervision,<br />

materials, erection, ma<strong>in</strong>tenance, <strong>in</strong>surance, pr<strong>of</strong>it, taxes, and duties, together with all<br />

general risks, liabilities, and obligations set out or implied <strong>in</strong> the Contract.<br />

4. A rate or price shall be entered aga<strong>in</strong>st each item <strong>in</strong> the priced <strong>Bill</strong> <strong>of</strong> Quantities,<br />

whether quantities are stated or not. The cost <strong>of</strong> Items aga<strong>in</strong>st which the Contractor has<br />

failed to enter a rate or price shall be deemed to be covered by other rates and prices<br />

entered <strong>in</strong> the <strong>Bill</strong> <strong>of</strong> Quantities.<br />

5. The whole cost <strong>of</strong> comply<strong>in</strong>g with the provisions <strong>of</strong> the Contract shall be <strong>in</strong>cluded <strong>in</strong><br />

the Items provided <strong>in</strong> the priced <strong>Bill</strong> <strong>of</strong> Quantities, and where no Items are provided, the<br />

cost shall be deemed to be distributed among the rates and prices entered for the related<br />

Items <strong>of</strong> Work.<br />

6. General directions and descriptions <strong>of</strong> work and materials are not necessarily<br />

repeated nor summarized <strong>in</strong> the <strong>Bill</strong> <strong>of</strong> Quantities. References to the relevant sections <strong>of</strong><br />

the Contract documentation shall be made before enter<strong>in</strong>g prices aga<strong>in</strong>st each item <strong>in</strong> the<br />

priced <strong>Bill</strong> <strong>of</strong> Quantities.<br />

7. Provisional Sums <strong>in</strong>cluded and so designated <strong>in</strong> the <strong>Bill</strong> <strong>of</strong> Quantities shall be<br />

expended <strong>in</strong> whole or <strong>in</strong> part at the direction and discretion <strong>of</strong> the Eng<strong>in</strong>eer.<br />

8. The method <strong>of</strong> measurement <strong>of</strong> completed work for payment shall be <strong>in</strong> accordance<br />

with Palest<strong>in</strong>ian Standards<br />

9. Errors will be corrected by the Employer for any arithmetic errors <strong>in</strong> computation or<br />

summation as follows:<br />

(a) Where there is a discrepancy between amounts <strong>in</strong> figures and <strong>in</strong> words, the<br />

amount <strong>in</strong> words will govern; and


ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 3<br />

(b) where there is a discrepancy between the unit rate and the total amount derived<br />

from the multiplication <strong>of</strong> the unit price and the quantity, the unit rate as quoted<br />

will govern, unless <strong>in</strong> the op<strong>in</strong>ion <strong>of</strong> the Employer, there is an obviously gross<br />

misplacement <strong>of</strong> the decimal po<strong>in</strong>t <strong>in</strong> the unit price, <strong>in</strong> which event the total<br />

amount as quoted will govern and the unit rate will be corrected.<br />

10. The Unit Prices given hereunder the BOQ shall also <strong>in</strong>clude erection, <strong>in</strong>stallation, fix<strong>in</strong>g,<br />

and re-fix<strong>in</strong>g <strong>of</strong> all elements. These prices shall also <strong>in</strong>clude taxes, visa for labor, gate passes,<br />

accommodations for the Contractor’s staff and labors, all required <strong>in</strong>surance and work<br />

permits, guarantees, bonds etc. and all requirements necessary to have the work ma<strong>in</strong>ta<strong>in</strong>ed<br />

until its f<strong>in</strong>al hand<strong>in</strong>g over.<br />

11. The Unit Prices given hereunder <strong>in</strong> the <strong>Bill</strong> <strong>of</strong> Quantities for this work shall also <strong>in</strong>clude<br />

overheads, risks, pr<strong>of</strong>it etc. and all other f<strong>in</strong>ancial matters to have all these civil works<br />

completed.<br />

12. The works, materials or activities listed <strong>in</strong> the follow<strong>in</strong>g shall always be considered as<br />

supportive works to be <strong>in</strong>cluded <strong>in</strong> the Unit Prices bid for any item <strong>in</strong> the <strong>Bill</strong> <strong>of</strong> Quantities:<br />

(a) Any measurement for execution and payment <strong>of</strong> the works, <strong>in</strong>clud<strong>in</strong>g the<br />

provision <strong>of</strong> measur<strong>in</strong>g <strong>in</strong>struments, gauges, sett<strong>in</strong>g out marks, mark<strong>in</strong>g pa<strong>in</strong>t<br />

and relevant tools, labor, etc., the ma<strong>in</strong>tenance and preservation <strong>of</strong> gauges and<br />

sett<strong>in</strong>g-out marks dur<strong>in</strong>g the execution <strong>of</strong> the works.<br />

(b) Provision <strong>of</strong> small tackle tools or any other equipment required for the<br />

execution <strong>of</strong> the works.<br />

(c) Supply <strong>of</strong> consumable materials for the Contractor’s equipment.<br />

(d) Removal <strong>of</strong> all contam<strong>in</strong>ation (refuse, debris, build<strong>in</strong>g rubbish and the like)<br />

aris<strong>in</strong>g from or <strong>in</strong> connection with the Contractor’s work.<br />

(e) Protection <strong>of</strong> the executed works and <strong>of</strong> the items made available for<br />

execution <strong>of</strong> the works from damage, fire, <strong>in</strong>clement weather, vandalism and<br />

theft etc., to the time <strong>of</strong> f<strong>in</strong>al acceptance.<br />

(f) Transportation <strong>of</strong> all materials and structural components from the storage<br />

places on site to the po<strong>in</strong>ts <strong>of</strong> use and return transportation, if required.<br />

(g) Submitt<strong>in</strong>g and transport<strong>in</strong>g any samples required.<br />

(h) Carry<strong>in</strong>g out tests on materials and works, etc., that is required by the<br />

Eng<strong>in</strong>eer.<br />

(i) Fuel and lubricants for operation <strong>of</strong> Contractor’s equipment.<br />

(j) <strong>Al</strong>l safety precautions and measures for safeguard<strong>in</strong>g labor as well as<br />

secur<strong>in</strong>g surround<strong>in</strong>g areas.<br />

(k) Light<strong>in</strong>g <strong>of</strong> the work site.<br />

13. RIGHTS OF EMPLOYER<br />

The follow<strong>in</strong>g rights are reserved to the Employer:


ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 4<br />

(a) To omit <strong>in</strong>dividual items mentioned <strong>in</strong> the Schedule <strong>of</strong> Prices if not required <strong>in</strong><br />

the op<strong>in</strong>ion <strong>of</strong> the Employer and/or to replace them should it be more<br />

advantageous to execute them <strong>in</strong> another way.<br />

(b) To order execution <strong>of</strong> alternative or provisional items as if they were ma<strong>in</strong> items.<br />

(c) To order execution <strong>of</strong> additional works as well as alternatives <strong>of</strong> works, always <strong>in</strong><br />

conformity with the conditions outl<strong>in</strong>ed <strong>in</strong> the Contract.<br />

Any order and/or delivery <strong>of</strong> material or equipment by the Contractor for performance <strong>of</strong> the<br />

works may only be based on <strong>in</strong>structions and/or approved execution draw<strong>in</strong>gs by the<br />

Employer/Eng<strong>in</strong>eer.<br />

<strong>Al</strong>l equipment and materials for <strong>in</strong>stallation and f<strong>in</strong>ish<strong>in</strong>g works to be <strong>in</strong>corporated <strong>in</strong> this<br />

contract shall prior to order<strong>in</strong>g and/or delivery by the Contractor, be approved by the<br />

Employer/Eng<strong>in</strong>eer both <strong>in</strong> respect <strong>of</strong> quality and type as well as <strong>of</strong> quantity.<br />

14. SITE ACCESS AND STORAGE<br />

The Tenderer shall visit the site and ascerta<strong>in</strong> the location <strong>of</strong> required access onto the site and<br />

the location <strong>of</strong> allowance for comply<strong>in</strong>g with the requirements and for the re<strong>in</strong>statement to<br />

orig<strong>in</strong>al condition <strong>of</strong> all roads and areas used or disturbed by the Contractor to the satisfaction<br />

<strong>of</strong> the Eng<strong>in</strong>eer.<br />

15. SITE INSTALLATION<br />

<strong>Al</strong>l costs <strong>of</strong> labor, works, provisions, materials and equipment for Site Installations required<br />

by the Contractor and stipulated <strong>in</strong> the Tender Documents shall be <strong>in</strong>cluded <strong>in</strong> the various<br />

unit prices <strong>of</strong> the <strong>Bill</strong> <strong>of</strong> Quantities. No extra payment will be allowed by the Employer for<br />

any <strong>of</strong> these activities.<br />

16. DURATION<br />

The total duration <strong>of</strong> the contract is N<strong>in</strong>e (9) calendar months <strong>in</strong>clud<strong>in</strong>g weekends, holidays<br />

and <strong>of</strong>ficial holidays.<br />

Special Note:<br />

<strong>Al</strong>l items <strong>in</strong>cluded <strong>in</strong> <strong>Bill</strong> 1, <strong>Bill</strong>2, <strong>Bill</strong>3, and <strong>Bill</strong> 4, for which no rate or price is required<br />

to be entered by the Bidder, will not be paid for by <strong>UNDP</strong> when executed and shall be<br />

deemed covered by the other rates and prices <strong>in</strong> the <strong>Bill</strong> <strong>of</strong> Quantities.


ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 5<br />

B. Work Items<br />

1. General items, general services .............................................................................. 4<br />

2. Field Investigations ................................................................................................... 10<br />

3. Test Field ....................................................................................................................... 13<br />

4. Site Clearance ............................................................................................................. 17<br />

5. Excavations .................................................................................................................. 19<br />

6. Bentonite Mat ............................................................................................................. 28<br />

7. Geo-membrane .......................................................................................................... 30<br />

8. Geotextile ..................................................................................................................... 34<br />

9. Dra<strong>in</strong>age Layer ............................................................................................................ 38<br />

10. PE-HD Works ................................................................................................................ 40<br />

11. Concrete Works .......................................................................................................... 53<br />

12. Leachate Recirculation ............................................................................................ 60<br />

13. Surface Water Collection ........................................................................................ 68<br />

14. Road Construction .................................................................................................... 72<br />

15. Gas Collection ............................................................................................................. 77<br />

16. Special Equipment .................................................................................................... 81<br />

Summary ....................................................................................................................... 85


ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 6<br />

<strong>Bill</strong> No. 1: General Items, general services<br />

Item no. Description Unit Quantity Rate Amount<br />

The Bidders have to consider the<br />

follow<strong>in</strong>g notes when complet<strong>in</strong>g<br />

their proposal:<br />

Note 1: <strong>Al</strong>l prices have to be given <strong>in</strong><br />

US$ (United States Dollars)<br />

Note 2: Explanation <strong>of</strong> punctuation:<br />

- Dot (".") means decimal po<strong>in</strong>t<br />

- Comma (",") means "thousands<br />

The contractor has to consider that<br />

the <strong>landfill</strong> is located <strong>in</strong> a region with<br />

special climatic and geological<br />

conditions. This concerns site design<br />

criteria as listed <strong>in</strong> the General and<br />

Technical Specification.<br />

Therefore the contractor should<br />

pro<strong>of</strong>, that all material and facilities<br />

supplied and all works carried out by<br />

the contractor or his subcontractor<br />

will consider above mentioned<br />

conditions and comply with<br />

applicable Palest<strong>in</strong>ian regulations and<br />

standards. If Palest<strong>in</strong>ian regulations<br />

and standards are not applicable or<br />

available the Contractor should pro<strong>of</strong><br />

best available technology.<br />

The Contractor shall be obliged to<br />

fulfil all Palest<strong>in</strong>ian Regulations<br />

<strong>in</strong>clud<strong>in</strong>g respective limit<strong>in</strong>g values.<br />

He has to prove the fulfilment<br />

whenever required, latest dur<strong>in</strong>g<br />

commission<strong>in</strong>g. <strong>Al</strong>l costs for the<br />

fulfilment <strong>of</strong> the Palest<strong>in</strong>ian<br />

Regulations shall be <strong>in</strong>cluded <strong>in</strong> the<br />

prices given <strong>in</strong> the bid.<br />

The above remark should be valid for<br />

all material and facilities supplied and<br />

all works carried out as listed <strong>in</strong> the<br />

BoQ even if not stated there<br />

specifically.


ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 7<br />

Item no. Description Unit Quantity Rate Amount<br />

1.1 <strong>Al</strong>low for ma<strong>in</strong>tenance <strong>of</strong> works for 12<br />

months after completion<br />

1.2 The cost price shall <strong>in</strong>clude the<br />

follow<strong>in</strong>g:<br />

- Worker's protection plan<br />

and emergency plan<br />

A worker's protection and emergency<br />

plan has to be drawn up <strong>in</strong><br />

accordance with the explanations <strong>of</strong><br />

the General and Technical<br />

Specifications for the whole<br />

construction time<br />

- Build<strong>in</strong>g site equipment for<br />

the Contractor<br />

Appliances, tools and other operat<strong>in</strong>g<br />

material, which is required to carry<br />

out the build<strong>in</strong>g works as<br />

contractually agreed, shall be placed<br />

on site, readily<br />

available and - except for the fact that<br />

the material's use is charged<br />

separately - be put <strong>in</strong>to operat<strong>in</strong>g<br />

condition <strong>in</strong>clusive <strong>of</strong> all works<br />

<strong>in</strong>volved here<strong>in</strong>. The required fix<br />

<strong>in</strong>stallations shall be provided.<br />

The costs aris<strong>in</strong>g to prepare, ma<strong>in</strong>ta<strong>in</strong><br />

and operate appliances, build<strong>in</strong>gs<br />

(<strong>of</strong>fices), storage and work<strong>in</strong>g areas,<br />

temporary roads for the build<strong>in</strong>g<br />

phase, tools and equipment <strong>in</strong>clud<strong>in</strong>g<br />

payments for rent, lease, fees and the<br />

like shall be <strong>in</strong>cluded <strong>in</strong> the lump sum.<br />

Build<strong>in</strong>gs (<strong>of</strong>fices), storage and<br />

work<strong>in</strong>g areas, preparation and<br />

ma<strong>in</strong>tenance <strong>of</strong> accommodation<br />

and social rooms for the Contractor's<br />

personnel, erection and preparation<br />

<strong>of</strong> scaffold<strong>in</strong>gs, platforms and the like<br />

as well as <strong>in</strong>stallation and preparation<br />

<strong>of</strong> an electronic data process<strong>in</strong>g unit<br />

shall be carried out <strong>in</strong> accordance<br />

with the stipulations by Project<br />

Manager


ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 8<br />

Item no. Description Unit Quantity Rate Amount<br />

- Build<strong>in</strong>gs for the Project<br />

Manager<br />

Temporary build<strong>in</strong>gs (<strong>of</strong>fices) and<br />

workshops for the Project Manager<br />

shall be supplied and ma<strong>in</strong>ta<strong>in</strong>ed<br />

for the length <strong>of</strong> the construction <strong>of</strong><br />

the first section <strong>of</strong> the <strong>landfill</strong>. Details<br />

<strong>of</strong> requirements for the build<strong>in</strong>gs are<br />

described <strong>in</strong> General Specifications.<br />

- Build<strong>in</strong>gs for geotechnical<br />

<strong>in</strong>stitute<br />

Temporary build<strong>in</strong>gs (<strong>of</strong>fices) and<br />

workshops for the external supervisor<br />

(geotechnical <strong>in</strong>stitute), who carries<br />

out the field <strong>in</strong>vestigations, shall be<br />

supplied and ma<strong>in</strong>ta<strong>in</strong>ed for the<br />

length <strong>of</strong> the construction <strong>of</strong> the first<br />

section <strong>of</strong> the <strong>landfill</strong> site. Details <strong>of</strong><br />

requirements for the build<strong>in</strong>gs are<br />

described <strong>in</strong> General Specifications.<br />

- Temporary supply and<br />

discharg<strong>in</strong>g facilities<br />

The construction site as well as the<br />

site <strong>of</strong>fices <strong>of</strong> the Constructor and the<br />

Project Manager shall be supplied<br />

with: electricity, dr<strong>in</strong>k<strong>in</strong>g water,<br />

service water, waste water disposal,<br />

telephone <strong>in</strong>stallation / transmitt<strong>in</strong>g<br />

and receiv<strong>in</strong>g set<br />

- Clear<strong>in</strong>g <strong>of</strong> construction site<br />

Clear<strong>in</strong>g <strong>of</strong> the entire construction<br />

site and all <strong>in</strong>stallations <strong>in</strong>clud<strong>in</strong>g the<br />

repair <strong>of</strong> damage as well as the<br />

recondition<strong>in</strong>g <strong>of</strong> all areas used.


ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 9<br />

Item no. Description Unit Quantity Rate Amount<br />

1.8 - Survey<strong>in</strong>g services<br />

<strong>Al</strong>l survey<strong>in</strong>g works which are to be<br />

supplied by the Constructor shall be<br />

provided such as control <strong>of</strong> the<br />

exist<strong>in</strong>g survey, extension <strong>of</strong> the<br />

exist<strong>in</strong>g survey to 10 m at the outside<br />

<strong>of</strong> the <strong>landfill</strong> area and fabrication <strong>of</strong> a<br />

digital 3-dimensional model <strong>of</strong> the<br />

terra<strong>in</strong>. For a detailed list <strong>of</strong> all works<br />

which are to be carried out please<br />

refer to the General and Technical<br />

Specifications.<br />

<strong>Al</strong>l documents (as-built plan etc) shall<br />

be handed over to the Project<br />

Manager <strong>in</strong> 3-fold as copies (one copy<br />

as pr<strong>in</strong>table copy). Furthermore, all<br />

documents and draw<strong>in</strong>gs shall be<br />

supplied to the Project Manager on a<br />

data carrier <strong>in</strong> a format to be<br />

determ<strong>in</strong>ed by the Project Manager.<br />

Remuneration <strong>of</strong> all result<strong>in</strong>g <strong>in</strong>voices<br />

<strong>in</strong> a lump sum.


ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 10<br />

Item no. Description Unit Quantity Rate Amount<br />

Fixed po<strong>in</strong>ts <strong>of</strong> altitude (for survey)<br />

The polygonal po<strong>in</strong>t <strong>of</strong> altitude shall<br />

be produced with the help <strong>of</strong> a bolt<br />

(round head) <strong>of</strong> at least 10 cm length,<br />

which has been put <strong>in</strong> a concrete<br />

foundation (m<strong>in</strong>imum cross section<br />

0.07 m², concrete quality C 25/30 EN<br />

206-1). The position <strong>of</strong> the fixed<br />

po<strong>in</strong>ts shall be determ<strong>in</strong>ed together<br />

with the Project Manager. The<br />

polygonal po<strong>in</strong>ts shall be measured<br />

prior to the first ground survey carries<br />

out by Constructor. Dur<strong>in</strong>g the entire<br />

time <strong>of</strong> construction the altitude <strong>of</strong><br />

the fixed po<strong>in</strong>ts shall be controlled at<br />

regular <strong>in</strong>tervals. <strong>Al</strong>l required works<br />

shall be <strong>in</strong>corporated <strong>in</strong>to the<br />

standard price. Depth <strong>of</strong> concrete<br />

foundation 100 cm, polygonal po<strong>in</strong>t<br />

<strong>of</strong> altitude shall be ma<strong>in</strong>ta<strong>in</strong>ed<br />

Static calculation <strong>of</strong> PE-HD pipes<br />

Static calculation for all PE-HD pipes.<br />

The calculation for all pipes shall be<br />

accomplished separately.<br />

Remuneration <strong>of</strong> all result<strong>in</strong>g <strong>in</strong>voices<br />

<strong>in</strong> a lump sum<br />

Pro<strong>of</strong> <strong>of</strong> static calculation <strong>of</strong> pipes<br />

<strong>Al</strong>l static calculations <strong>of</strong> PE-HD pipes<br />

shall be checked by an <strong>in</strong>dependent<br />

expert who shall be determ<strong>in</strong>ed by<br />

the Constructor. Remuneration <strong>of</strong> all<br />

result<strong>in</strong>g <strong>in</strong>voices <strong>in</strong> a lump sum.<br />

Execution design<br />

Execution design for all electrical<br />

works on and around the <strong>landfill</strong><br />

(especially for leachate recirculation)<br />

Remuneration <strong>in</strong> a lump sum


ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 11<br />

Item no. Description Unit Quantity Rate Amount<br />

Progress report, documentation<br />

<strong>Al</strong>l project progress reports,<br />

photographic documentation, etc.<br />

shall be prepared as expla<strong>in</strong>ed <strong>in</strong> the<br />

General Specifications. The<br />

equipment which is necessary to carry<br />

out these jobs (such as hardware,<br />

s<strong>of</strong>tware, copy<strong>in</strong>g and b<strong>in</strong>d<strong>in</strong>g<br />

mach<strong>in</strong>es) shall be <strong>in</strong>stalled and<br />

operated at the construction site.<br />

Detail draw<strong>in</strong>gs, plans <strong>of</strong> execution<br />

<strong>Al</strong>l detail draw<strong>in</strong>gs and plans <strong>of</strong><br />

execution which are to be supplied by<br />

the Constructor shall be handed over<br />

<strong>in</strong> 3-fold as copies (one copy as<br />

pr<strong>in</strong>table copy). <strong>Al</strong>l works which are to<br />

be carried out are listed <strong>in</strong> the<br />

Technical Specifications.<br />

Remuneration <strong>of</strong> all result<strong>in</strong>g <strong>in</strong>voices<br />

<strong>in</strong> a lump sum.<br />

As-built plan<br />

Preparation <strong>of</strong> as-built plan for the<br />

entire project based on governmental<br />

ground maps and as-built plans<br />

(survey <strong>of</strong> land, etc) provided by the<br />

Constructor. The scope <strong>of</strong> supply<br />

<strong>in</strong>cludes:<br />

Record<strong>in</strong>g <strong>in</strong> view <strong>of</strong> position and<br />

altitude <strong>of</strong> the pipel<strong>in</strong>e and supply<br />

l<strong>in</strong>e network produced <strong>in</strong>clusive <strong>of</strong><br />

<strong>in</strong>spection chambers, special<br />

chambers and all other build<strong>in</strong>gs with<br />

relevant height <strong>in</strong>dications, <strong>in</strong>dication<br />

<strong>of</strong> cross-sections, longitud<strong>in</strong>al<br />

sections, descents, etc., Record<strong>in</strong>g <strong>of</strong><br />

the entire area <strong>of</strong> the <strong>landfill</strong> by<br />

means <strong>of</strong> an electronic tachymeter on<br />

basis <strong>of</strong> the local map grid, which is to<br />

be provided by the Constructor.<br />

Preparation <strong>of</strong> plans show<strong>in</strong>g the<br />

prevail<strong>in</strong>g conditions and<br />

longitud<strong>in</strong>al pr<strong>of</strong>iles.


ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 12<br />

<strong>Bill</strong> No. 2: Field Investigations<br />

Item no. Description Unit Quantity Rate Amount<br />

The <strong>in</strong>dividual field <strong>in</strong>vestigations are<br />

described <strong>in</strong> more detail <strong>in</strong> the<br />

relevant chapters <strong>of</strong> the General and<br />

Technical Specifications. The external<br />

supervisor must be <strong>in</strong>dependent and<br />

shall be determ<strong>in</strong>ed already on order<br />

presentation. The relevant <strong>in</strong>stitute<br />

shall be presented (<strong>in</strong>stitute, address,<br />

contact person, telephone) and<br />

approved <strong>in</strong> written from.<br />

Base <strong>of</strong> <strong>landfill</strong> (fills) and r<strong>in</strong>g road<br />

Deformation module EV2 on base <strong>of</strong><br />

<strong>landfill</strong> site and sub-base <strong>of</strong> r<strong>in</strong>g road<br />

shall be executed accord<strong>in</strong>g to the<br />

specifications made by the<br />

<strong>in</strong>dependent geotechnical <strong>in</strong>stitute <strong>in</strong><br />

areas where material is filled.<br />

Base (planum) <strong>of</strong> <strong>landfill</strong><br />

Compaction degree Dpr and<br />

deformation module EV2 on base<br />

grade <strong>of</strong> <strong>landfill</strong> site shall be executed<br />

accord<strong>in</strong>g to the specifications made<br />

by the <strong>in</strong>dependent geotechnical<br />

<strong>in</strong>stitute.<br />

Gra<strong>in</strong> size distribution support<br />

layer<br />

Exam<strong>in</strong>ation <strong>of</strong> the particle size<br />

distribution and <strong>of</strong> the undersize<br />

particles (fractile <strong>of</strong> probability<br />

distribution 20%) at the support layer<br />

shall be executed accord<strong>in</strong>g to the<br />

specifications made by the<br />

<strong>in</strong>dependent geotechnical <strong>in</strong>stitute<br />

and the Technical Specifications.<br />

Gra<strong>in</strong> size distribution dra<strong>in</strong>age<br />

layer<br />

Exam<strong>in</strong>ation <strong>of</strong> the particle size distribution<br />

and <strong>of</strong> the undersize particles<br />

(fractile <strong>of</strong> probability distribution<br />

10%) at the filter gravel shall be executed<br />

accord<strong>in</strong>g to the specifications<br />

made by the <strong>in</strong>dependent<br />

geotechnical <strong>in</strong>stitute and the<br />

Technical Specifications.


ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 13<br />

Item no. Description Unit Quantity Rate Amount<br />

Calcium-Carbonate<br />

Exam<strong>in</strong>ation <strong>of</strong> the Calcium-<br />

Carbonate content at the filter gravel<br />

(dra<strong>in</strong>age layer) shall be executed<br />

accord<strong>in</strong>g to the specifications made<br />

by the <strong>in</strong>dependent geotechnical<br />

<strong>in</strong>stitute and the description <strong>of</strong><br />

construction.<br />

Compaction degree<br />

Exam<strong>in</strong>ation <strong>of</strong> the compaction<br />

degree Dpr <strong>of</strong> the m<strong>in</strong>eral base<br />

material <strong>of</strong> the leachate pond shall be<br />

executed accord<strong>in</strong>g to the<br />

specifications made by the<br />

<strong>in</strong>dependent geotechnical <strong>in</strong>stitute.<br />

Field <strong>in</strong>vestigation <strong>of</strong> permeability<br />

Exam<strong>in</strong>ation <strong>of</strong> the coefficient <strong>of</strong><br />

permeability for the m<strong>in</strong>eral base l<strong>in</strong>er<br />

material <strong>of</strong> the leachate pond shall be<br />

executed accord<strong>in</strong>g to specifications<br />

made by the <strong>in</strong>dependent<br />

geotechnical <strong>in</strong>stitute<br />

Water content<br />

Exam<strong>in</strong>ation <strong>of</strong> the water content for<br />

the m<strong>in</strong>eral base l<strong>in</strong>er material <strong>of</strong> the<br />

leachate pond shall be executed<br />

accord<strong>in</strong>g to the specifications made<br />

by the <strong>in</strong>dependent geotechnical<br />

<strong>in</strong>stitute.<br />

Gra<strong>in</strong> size distribution<br />

Exam<strong>in</strong>ation <strong>of</strong> the particle size<br />

distribution for the m<strong>in</strong>eral base l<strong>in</strong>er<br />

material <strong>of</strong> the leachate pond shall be<br />

executed accord<strong>in</strong>g to the<br />

specifications made by the<br />

<strong>in</strong>dependent geotechnical <strong>in</strong>stitute.


ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 14<br />

Item no. Description Unit Quantity Rate Amount<br />

Compaction degree<br />

Exam<strong>in</strong>ation <strong>of</strong> the compaction<br />

degree Dpr <strong>of</strong> the m<strong>in</strong>eral base<br />

material <strong>of</strong> the base seal<strong>in</strong>g system<br />

(for each layer) shall be executed<br />

accord<strong>in</strong>g to the specifications made<br />

by the <strong>in</strong>dependent geotechnical<br />

<strong>in</strong>stitute.<br />

Field <strong>in</strong>vestigation <strong>of</strong> permeability<br />

Exam<strong>in</strong>ation <strong>of</strong> the coefficient <strong>of</strong><br />

permeability for the m<strong>in</strong>eral base<br />

material <strong>of</strong> the base seal<strong>in</strong>g system<br />

(for each layer) shall be executed<br />

accord<strong>in</strong>g to specifications made by<br />

the <strong>in</strong>dependent geotechnical<br />

<strong>in</strong>stitute<br />

Water content<br />

Exam<strong>in</strong>ation <strong>of</strong> the water content for<br />

the m<strong>in</strong>eral base material <strong>of</strong> the base<br />

seal<strong>in</strong>g system (for each layer) shall be<br />

executed accord<strong>in</strong>g to the<br />

specifications made by the<br />

<strong>in</strong>dependent geotechnical <strong>in</strong>stitute.<br />

Gra<strong>in</strong> size distribution<br />

Exam<strong>in</strong>ation <strong>of</strong> the particle size<br />

distribution for the m<strong>in</strong>eral base<br />

material <strong>of</strong> the base seal<strong>in</strong>g system<br />

(for each layer) shall be executed<br />

accord<strong>in</strong>g to the specifications made<br />

by the <strong>in</strong>dependent geotechnical<br />

<strong>in</strong>stitute.


ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 15<br />

<strong>Bill</strong> No. 3: Test Field<br />

Item no. Description Unit Quantity Rate Amount<br />

The test field shall be produced as<br />

expla<strong>in</strong>ed <strong>in</strong> the Technical<br />

Specifications. The specifications<br />

stipulated by the <strong>in</strong>dependent<br />

geotechnical <strong>in</strong>stitute shall be<br />

followed most exactly. The standard<br />

prices mentioned below <strong>in</strong>clude the<br />

presentation <strong>of</strong> all <strong>in</strong>vestigations and<br />

all secondary work <strong>in</strong>volved. Possible<br />

h<strong>in</strong>drances caused by the fact that the<br />

<strong>in</strong>vestigations had to be carried out at<br />

different po<strong>in</strong>ts <strong>in</strong> time (<strong>in</strong>terruptions<br />

etc.) shall be considered.<br />

Base <strong>of</strong> <strong>landfill</strong> site, pla<strong>in</strong> base<br />

Base (planum) <strong>of</strong> <strong>landfill</strong> site shall be<br />

produced <strong>in</strong> the pla<strong>in</strong> base range <strong>of</strong><br />

the test field to support the base<br />

l<strong>in</strong>ers. Longitud<strong>in</strong>al gradient <strong>of</strong> the<br />

pla<strong>in</strong> base is 1 %.<br />

Material for base: sandy, silty material<br />

(“support layer”, see Technical<br />

Specifications) Permitted deviation<br />

from specified height: +/- 3 cm.<br />

Base (planum) <strong>of</strong> <strong>landfill</strong> site,<br />

slopes<br />

Base (planum) <strong>of</strong> <strong>landfill</strong> site <strong>in</strong> the<br />

slope area <strong>of</strong> the test field shall be<br />

produced to support the m<strong>in</strong>eral<br />

l<strong>in</strong>ers. Slope 1:2.5.<br />

Material for base: sandy, silty material<br />

(“support layer”, see Technical<br />

Specifications) Permitted deviation<br />

from specified height: +/- 3 cm.<br />

Compaction (planum), pla<strong>in</strong> base<br />

Compaction <strong>of</strong> base <strong>of</strong> <strong>landfill</strong> site <strong>in</strong><br />

the pla<strong>in</strong> base area <strong>of</strong> the <strong>landfill</strong>. Soil<br />

conditions are expla<strong>in</strong>ed <strong>in</strong> the<br />

subsoil test (please refer to the<br />

Technical Specifications).


ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 16<br />

Item no. Description Unit Quantity Rate Amount<br />

Compaction (planum), slopes<br />

Compaction <strong>of</strong> base <strong>of</strong> <strong>landfill</strong> site <strong>in</strong> the<br />

slope area <strong>of</strong> the <strong>landfill</strong>. Soil conditions<br />

are expla<strong>in</strong>ed <strong>in</strong> the subsoil test (please<br />

refer to the Technical Specifications).<br />

Slope: 1:2.5<br />

M<strong>in</strong>eral Seal<strong>in</strong>g, plan base area<br />

M<strong>in</strong>eral base l<strong>in</strong>er made from strongly<br />

b<strong>in</strong>d<strong>in</strong>g clay material shall be<br />

<strong>in</strong>corporated <strong>in</strong> layers <strong>of</strong> 0.275 m<br />

accord<strong>in</strong>g to the prevail<strong>in</strong>g pr<strong>of</strong>ile and<br />

shall be compacted layer by layer.<br />

Material requirements accord<strong>in</strong>g to<br />

Technical Specifications.<br />

Incorporation <strong>in</strong>to the pla<strong>in</strong> base area <strong>of</strong><br />

the test field<br />

The material to be compacted shall be<br />

supplied by a secondary storage site <strong>of</strong><br />

the Contractor.<br />

M<strong>in</strong>eral Seal<strong>in</strong>g, slope areas<br />

Incorporation <strong>of</strong> b<strong>in</strong>d<strong>in</strong>g clay material<br />

<strong>in</strong>to the slope areas <strong>of</strong> the test field,<br />

slope 1:2.5 - all other works as expla<strong>in</strong>ed<br />

<strong>in</strong> item no. 3.5<br />

Geomembrane layer<br />

A flexible geo-membrane made from<br />

PEHD shall be supplied, laid and<br />

<strong>in</strong>stalled (welded) <strong>in</strong> accordance with<br />

manufacturer's guidel<strong>in</strong>es on the<br />

bentonite mat <strong>in</strong> the pla<strong>in</strong> base areas <strong>of</strong><br />

the <strong>landfill</strong> site.<br />

The sheet<strong>in</strong>gs shall be laid out <strong>in</strong> full<br />

size and pla<strong>in</strong> on the base <strong>of</strong> <strong>landfill</strong> site.<br />

No wr<strong>in</strong>kl<strong>in</strong>g is allowed. The overlaps <strong>in</strong><br />

longitud<strong>in</strong>al and transverse direction<br />

shall be m<strong>in</strong>. 15 cm. Only the ground<br />

covered by the geotextile shall be<br />

remunerated, the overlapp<strong>in</strong>g part shall<br />

be <strong>in</strong>cluded <strong>in</strong> the standard price.<br />

The weld<strong>in</strong>g seams shall be executed as<br />

double seams with <strong>in</strong>spection channel.<br />

Each weld<strong>in</strong>g seam shall be tested for<br />

impermeability and cohesiveness<br />

accord<strong>in</strong>g to the exist<strong>in</strong>g regulations.


ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 17<br />

Item no. Description Unit Quantity Rate Amount<br />

A protocol for each seam test shall be<br />

given to the Project Manager.<br />

When the sheet<strong>in</strong>gs are welded<br />

attention has to be paid to restrictions<br />

due to unsuitable weather conditions.<br />

That the chemical resistance and<br />

physical properties shall be verified <strong>in</strong><br />

accordance with the relevant<br />

regulations (such as ASTM D 1593,<br />

ASTM D 638, etc.).<br />

The MFI Index (MFI 190/5) <strong>of</strong> the<br />

flexible geo-membrane layers shall be<br />

more than 2.<br />

Thickness <strong>of</strong> geo-membrane layer<br />

shall be m<strong>in</strong>. 1.5 mm, the width <strong>of</strong> a<br />

layer shall be 5 m.<br />

Area <strong>of</strong> <strong>in</strong>corporation: base and slope<br />

area<br />

Geo-textile 1200 g/m2<br />

Overlaps <strong>in</strong> longitud<strong>in</strong>al and<br />

transverse direction shall be m<strong>in</strong>. 50<br />

cm.<br />

Only the ground covered by the geotextile<br />

shall be remunerated, the<br />

overlapp<strong>in</strong>g parts shall be <strong>in</strong>cluded <strong>in</strong><br />

the standard price.<br />

The geo-textile shall be made <strong>of</strong><br />

mechanically bonded PEHD filaments.<br />

The chemical resistance and the<br />

physical properties <strong>in</strong> accordance<br />

with the relevant regulations (such as<br />

EN 10319, EN ISO 12236 etc.) shall be<br />

verified by both <strong>in</strong>ternal quality<br />

assurance and external quality control<br />

and assurance by an <strong>in</strong>dependent<br />

authorised laboratory.<br />

The specific weight <strong>of</strong> the geo-textile<br />

shall be m<strong>in</strong>. 1,200 g/m2.


ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 18<br />

Item no. Description Unit Quantity Rate Amount<br />

Filter gravel 16/32 mm, base area<br />

A surface filter made <strong>of</strong> filter gravel<br />

16/32 mm (CaCO3 content


ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 19<br />

<strong>Bill</strong> No. 4: Site Clearance<br />

Item no. Description Unit Quantity Rate Amount<br />

Lift<strong>in</strong>g up and stor<strong>in</strong>g <strong>of</strong> stone<br />

chips V


ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 20<br />

Item no. Description Unit Quantity Rate Amount<br />

4.5 Clear<strong>in</strong>g <strong>of</strong> paved areas<br />

Bitum<strong>in</strong>ous paved areas <strong>in</strong> the<br />

northern part <strong>of</strong> the exist<strong>in</strong>g <strong>landfill</strong><br />

area shall be cut, loaded and removed<br />

from the <strong>landfill</strong> site. The material<br />

becomes property <strong>of</strong> the Contractor<br />

and shall be removed to a disposal<br />

site <strong>of</strong> the Contractor.<br />

Thickness <strong>of</strong> paved areas about 20 to<br />

30 cm.<br />

The unit price conta<strong>in</strong>s all costs for<br />

the disposal.<br />

Delivery and <strong>in</strong>corporate ≈ its<br />

means Supply and <strong>in</strong>stall<br />

Supply <strong>of</strong> materials has to be secured<br />

before submitt<strong>in</strong>g relevant activities.<br />

It is anticipated that all materials<br />

supply to be completed with<strong>in</strong> three<br />

months from start<strong>in</strong>g <strong>of</strong> the contract.<br />

The environment sensitive materials<br />

will not be laid if they are not<br />

protected by subsequent layer.<br />

Payment will not be authorized for<br />

materials without execution.<br />

It is understood that the exist<strong>in</strong>g level<br />

<strong>in</strong> the dump site is chang<strong>in</strong>g and the<br />

contractor will carry out the works as<br />

the sections level<strong>in</strong>g for 3 meters cut<br />

and fill <strong>in</strong>dicated <strong>in</strong> the bill items.


ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 21<br />

<strong>Bill</strong> No. 5: Excavations<br />

Item no. Description Unit Quantity Rate Amount<br />

In the event that the quantity<br />

/measurement <strong>in</strong>dicated for some<br />

Item No.s should be reduced or<br />

entirely cancelled, the Contractor is<br />

not authorized to claim any loss <strong>in</strong><br />

pr<strong>of</strong>it.<br />

The soil <strong>in</strong> place is expla<strong>in</strong>ed <strong>in</strong> the<br />

Technical Specifications.<br />

The basis for the calculation <strong>of</strong> all<br />

positions shall be soil material<br />

characterized as ma<strong>in</strong>ly sandy (partly<br />

silty or gritty) materials, which allow<br />

excavation without blast<strong>in</strong>g.<br />

5.1 Excavat<strong>in</strong>g <strong>of</strong> soil, Leachate pond<br />

area<br />

The soil <strong>of</strong> the leachate pond area<br />

shall be excavated from all cutt<strong>in</strong>g<br />

pr<strong>of</strong>iles <strong>in</strong> the pla<strong>in</strong> ground area as<br />

well <strong>in</strong> the slope area accord<strong>in</strong>g to the<br />

Project Manager's requirements and<br />

<strong>in</strong> correspondence with the prevail<strong>in</strong>g<br />

pr<strong>of</strong>iles. The soil shall be loaded and<br />

transported and shall be <strong>in</strong>corporated<br />

and compacted as part <strong>of</strong> the support<br />

layer <strong>in</strong> all areas <strong>of</strong> the cell ST (subcells<br />

1 and 2).<br />

The soil <strong>in</strong> place is expla<strong>in</strong>ed <strong>in</strong> the<br />

Technical Specifications.<br />

The quantity <strong>of</strong> cleared soil shall be<br />

determ<strong>in</strong>ed by the measurement at<br />

the borrow area with the help <strong>of</strong><br />

digital model <strong>of</strong> the terra<strong>in</strong><br />

(tachymetric survey).<br />

m3 3,500


ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 22<br />

Item no. Description Unit Quantity Rate Amount<br />

5.2 Excavat<strong>in</strong>g <strong>of</strong> soil, seepage reservoir<br />

The soil <strong>of</strong> the seepage reservoir area shall<br />

be excavated from all cutt<strong>in</strong>g pr<strong>of</strong>iles <strong>in</strong><br />

the pla<strong>in</strong> ground area as well <strong>in</strong> the slope<br />

area accord<strong>in</strong>g to the Project Manager's<br />

requirements and <strong>in</strong> correspondence with<br />

the prevail<strong>in</strong>g pr<strong>of</strong>iles.<br />

The excavated soil shall become the<br />

property <strong>of</strong> the Contractor and shall be<br />

removed from site and shall be disposed<br />

<strong>of</strong> at the expense <strong>of</strong> the Contractor.<br />

<strong>Al</strong>l other works as expla<strong>in</strong>ed <strong>in</strong> item no.<br />

5.1.<br />

5.3 Excavat<strong>in</strong>g <strong>of</strong> soil, new hazardous<br />

waste area<br />

The soil <strong>of</strong> the new hazardous waste cell<br />

area shall be excavated <strong>in</strong> the pla<strong>in</strong><br />

ground area as well <strong>in</strong> the slope area<br />

accord<strong>in</strong>g to the Project Manager's<br />

requirements.<br />

The soil shall be loaded, transported,<br />

<strong>in</strong>corporated and compacted as part <strong>of</strong><br />

the support layer <strong>in</strong> all areas <strong>of</strong> the cell ST<br />

(sub-cells 1 and 2).<br />

Total area <strong>of</strong> new hazardous waste cell:<br />

2,500 m², depth: 2.0 m, slopes 1:2<br />

<strong>Al</strong>l other works as expla<strong>in</strong>ed <strong>in</strong> item no.<br />

5.1<br />

5.4 Waste shift<strong>in</strong>g on plateau area, sub-cell<br />

1<br />

Level<strong>in</strong>g <strong>of</strong> exist<strong>in</strong>g waste surface with<br />

suitable equipment on top <strong>of</strong> the total<br />

relatively flat plateau <strong>in</strong> the area <strong>of</strong> the<br />

(future base-sealed) sub-cell 1, <strong>in</strong>clud<strong>in</strong>g<br />

the transport <strong>of</strong> the disposed, ma<strong>in</strong>ly<br />

burned waste <strong>in</strong>side the plateau area.<br />

Thickness <strong>of</strong> fills and cuts: 0 to 3 m<br />

Waste pr<strong>of</strong>il<strong>in</strong>g with an <strong>in</strong>cl<strong>in</strong>ation <strong>of</strong><br />

about 1 %; a waste volume <strong>of</strong> about 5,000<br />

m³ has to be shifted (waste is cut and<br />

filled),allowed tolerance + 20 cm, <strong>in</strong> max<br />

m3 2,000<br />

m3 5,000<br />

m2<br />

45,000


ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 23<br />

Item no. Description Unit Quantity Rate Amount<br />

5.5 Waste shift<strong>in</strong>g on plateau area,<br />

sub-cell 2<br />

Level<strong>in</strong>g <strong>of</strong> exist<strong>in</strong>g waste surface<br />

with suitable equipment on top <strong>of</strong> the<br />

total relatively flat plateau <strong>in</strong> the area<br />

<strong>of</strong> the (future base-sealed) sub-cell 2,<br />

<strong>in</strong>clud<strong>in</strong>g the transport <strong>of</strong> the<br />

disposed, ma<strong>in</strong>ly burned waste <strong>in</strong>side<br />

the plateau area.<br />

Thickness <strong>of</strong> cut: 0 to 3 m<br />

Thickness <strong>of</strong> fill: 0 to 3 m<br />

Waste pr<strong>of</strong>il<strong>in</strong>g with an <strong>in</strong>cl<strong>in</strong>ation <strong>of</strong><br />

about 1.4 %; a waste volume <strong>of</strong> about<br />

12,000 m³ has to be shifted (waste is<br />

cut and filled),<br />

allowed tolerance + 20 cm, <strong>in</strong> max<br />

5.6 Waste shift<strong>in</strong>g <strong>in</strong> sloped area<br />

Exist<strong>in</strong>g waste <strong>in</strong> northern sloped<br />

areas has to be pr<strong>of</strong>iled accord<strong>in</strong>g to<br />

given plans and Project Managers<br />

requirements;<br />

Load<strong>in</strong>g and transport<strong>in</strong>g with<strong>in</strong> the<br />

<strong>landfill</strong> area form sub-cell 1 to sub-cell<br />

2 and <strong>in</strong>corporation <strong>in</strong>side the area <strong>of</strong><br />

sub-cell 2 accord<strong>in</strong>g to Project<br />

Managers requirements<br />

Height <strong>of</strong> waste cut: up to about 8 m<br />

Pr<strong>of</strong>il<strong>in</strong>g <strong>in</strong> sloped area with<br />

<strong>in</strong>cl<strong>in</strong>ation from 1:1.5 to 1:2.0<br />

Material: ma<strong>in</strong>ly burned waste<br />

m2<br />

45,000<br />

m3 16,000


ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 24<br />

Item no. Description Unit Quantity Rate Amount<br />

5.7 Soil <strong>in</strong>corporation, support layer<br />

Suitable soil (sandy-silty material)<br />

shall be supplied, <strong>in</strong>corporated and<br />

compacted <strong>in</strong> correspondence with<br />

the prevail<strong>in</strong>g pr<strong>of</strong>iles or as required<br />

by the Project Manager as follow:<br />

- Fill<strong>in</strong>g material <strong>in</strong> the northern and<br />

southern sloped area (for slope<br />

reduction and creat<strong>in</strong>g a<br />

homogenous shape <strong>of</strong> Cell ST)<br />

- Fill<strong>in</strong>g material for rais<strong>in</strong>g the northwestern<br />

part <strong>of</strong> Cell ST<br />

- Support layer<br />

- <strong>Dik</strong>e surround<strong>in</strong>g the disposal area<br />

The <strong>in</strong>corporation areas are sub-cell 1<br />

and sub-cell 2.<br />

The soil <strong>in</strong> place (excavation areas)<br />

respectively the soil necessary for the<br />

support layer is expla<strong>in</strong>ed <strong>in</strong> the<br />

Technical Specifications.<br />

The <strong>in</strong>corporation shall be carried out<br />

layer by layer as described <strong>in</strong> the<br />

Technical Specifications.<br />

Total thickness <strong>of</strong> the support layer to<br />

be <strong>in</strong>corporated is at least 0.5 m, <strong>in</strong><br />

slope areas up to 15 m.<br />

At the outside end <strong>of</strong> the support<br />

layer an end dike shall be pr<strong>of</strong>iled<br />

accord<strong>in</strong>g to detail plan C-01.<br />

With each layer or at a m<strong>in</strong>imum <strong>of</strong><br />

3,000 m3 <strong>in</strong>corporated soil a test for<br />

the deformation module EV2 has to<br />

be carried out by the contractor (unit<br />

price given <strong>in</strong> item no. 2.1 and 2.2).<br />

Copies <strong>of</strong> the protocols shall be given<br />

to the Project Manager.<br />

The quantity <strong>of</strong> compacted soil shall<br />

be determ<strong>in</strong>ed by the measurement<br />

at the <strong>in</strong>corporation area with the<br />

help <strong>of</strong> digital model <strong>of</strong> the terra<strong>in</strong><br />

(tachymetry survey).<br />

m3 430,000


ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 25<br />

Item no. Description Unit Quantity Rate Amount<br />

5.8 Soil <strong>in</strong>corporation, leachate pond<br />

area<br />

Suitable soil (sandy-silty material)<br />

shall be supplied and <strong>in</strong>corporated<br />

Area <strong>of</strong> <strong>in</strong>corporation: leachate pond<br />

area with its access road, all other<br />

works as expla<strong>in</strong>ed <strong>in</strong> item no. 5.7. m3 200<br />

5.9 Soil <strong>in</strong>corporation, support layer<br />

for temporary leachate pipes<br />

Suitable soil (sandy-silty material)<br />

shall be supplied and <strong>in</strong>corporated<br />

Area <strong>of</strong> <strong>in</strong>corporation: base grade for<br />

temporary leachate pipes <strong>in</strong>side the<br />

southern sloped area <strong>of</strong> Cell ST,<br />

length about 120 m, horizontal width:<br />

1.0 m,<br />

all other works as expla<strong>in</strong>ed <strong>in</strong> item<br />

no. 5.7.<br />

5.10 Extra Charge for Production <strong>of</strong> a<br />

Deepen<strong>in</strong>g<br />

Extra charge regard<strong>in</strong>g earthworks for<br />

the production <strong>of</strong> a deepen<strong>in</strong>g<br />

(cavity) <strong>in</strong> the area <strong>of</strong> the leachate<br />

pipes on excavated/<strong>in</strong>corporated soil<br />

or made ground.<br />

Width <strong>of</strong> deepen<strong>in</strong>g <strong>in</strong> the centre 4 m,<br />

depth from 0.1 m up to 0.35 m.<br />

5.11 Compact<strong>in</strong>g <strong>of</strong> the subsoil<br />

The subsoil shall be compacted <strong>in</strong><br />

areas before <strong>in</strong>corporation <strong>of</strong> earth<br />

material starts.<br />

The soil <strong>in</strong> place is expla<strong>in</strong>ed <strong>in</strong> the<br />

Technical Specifications.<br />

Specified compaction degree Dpr <strong>of</strong><br />

m<strong>in</strong>. 95% or 97 % (depend<strong>in</strong>g <strong>of</strong> the<br />

soil <strong>in</strong> place).<br />

Unit price for test is given <strong>in</strong> item 2.1<br />

and 2.2.<br />

Execut<strong>in</strong>g shall be carried out <strong>in</strong><br />

sections <strong>of</strong> different sizes.<br />

m3 300<br />

m 1,700<br />

m2 15,000


ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 26<br />

Item no. Description Unit Quantity Rate Amount<br />

5.12 Production <strong>of</strong> the base <strong>of</strong> the <strong>landfill</strong><br />

site, pla<strong>in</strong> base areas<br />

Base <strong>of</strong> the <strong>landfill</strong> site <strong>in</strong>clud<strong>in</strong>g the<br />

leachate pond shall be produced <strong>in</strong> the<br />

pla<strong>in</strong> base areas to create a plane on top<br />

<strong>of</strong> the support layer <strong>in</strong> sub-cell 1 and<br />

sub-cell 2 and under the m<strong>in</strong>eral seal<strong>in</strong>g<br />

layer <strong>of</strong> the leachate pond.<br />

Longitud<strong>in</strong>al gradient <strong>of</strong> the pla<strong>in</strong> base is<br />

about 1 %. Permitted deviation from<br />

specified height: +/- 3 cm.<br />

Verification is carried out via the digital<br />

model <strong>of</strong> the terra<strong>in</strong> (tachymeric survey).<br />

The result<strong>in</strong>g costs shall be <strong>in</strong>cluded <strong>in</strong><br />

the standard unit price.<br />

m2 90,000<br />

5.13 Production <strong>of</strong> the base <strong>of</strong> the <strong>landfill</strong><br />

site, slope areas<br />

Base <strong>of</strong> the <strong>landfill</strong> site <strong>in</strong>clud<strong>in</strong>g the<br />

leachate pond shall be produced <strong>in</strong> the<br />

slope areas to create a plane on top <strong>of</strong><br />

the support layer <strong>in</strong> sub-cell 1 and subcell<br />

2 and under the m<strong>in</strong>eral seal<strong>in</strong>g layer<br />

<strong>of</strong> the leachate pond.<br />

Slope gradient 1:2 to 1:2.5.; all other<br />

works as expla<strong>in</strong>ed <strong>in</strong> item no. 5.12.<br />

m2 6,000<br />

5.14 M<strong>in</strong>eral seal<strong>in</strong>g, base area <strong>of</strong> the<br />

leachate pond<br />

M<strong>in</strong>eral l<strong>in</strong>er made from strongly<br />

cohesive clay material shall be supplied<br />

and <strong>in</strong>corporated <strong>in</strong> a layer <strong>of</strong> 0.44 m<br />

accord<strong>in</strong>g to the prevail<strong>in</strong>g pr<strong>of</strong>ile and<br />

shall be compacted such that after<br />

compact<strong>in</strong>g and under consideration <strong>of</strong><br />

tolerances the m<strong>in</strong>. required layer<br />

thickness <strong>of</strong> 40 cm shall be kept at all<br />

po<strong>in</strong>ts. The material must have a<br />

coefficient <strong>of</strong> permeability equal or<br />

below 1 x 10-8 m/s. Incorporation <strong>in</strong>to<br />

the pla<strong>in</strong> base area <strong>of</strong> the leachate pond.<br />

Specified compaction degree Dpr >=<br />

95%. The material to be compacted shall<br />

be supplied by a secondary storage site<br />

<strong>of</strong> the Contractor. The required tests will<br />

be remunerated accord<strong>in</strong>g to Section 2. m2 2,000


ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 27<br />

Item<br />

Description Unit Quantit<br />

no.<br />

y<br />

5.15 M<strong>in</strong>eral seal<strong>in</strong>g, slope areas <strong>of</strong> the<br />

leachate pond<br />

M<strong>in</strong>eral l<strong>in</strong>er shall be supplied and<br />

<strong>in</strong>corporated <strong>in</strong> a layer <strong>of</strong> 0.44 m accord<strong>in</strong>g<br />

to the prevail<strong>in</strong>g pr<strong>of</strong>ile and shall be<br />

compacted.<br />

Total thickness <strong>of</strong> layer to be <strong>in</strong>corporated<br />

0.44 m, however m<strong>in</strong>. 0.40 m.<br />

Incorporation <strong>in</strong> the slope area <strong>of</strong> the<br />

leachate pond, Slope gradient: 1:2<br />

<strong>Al</strong>l other works as expla<strong>in</strong>ed <strong>in</strong> item no.<br />

5.14.<br />

m2 2,000<br />

5.16 M<strong>in</strong>eral seal<strong>in</strong>g, base area <strong>of</strong> Cell ST<br />

M<strong>in</strong>eral seal<strong>in</strong>g layer made from strongly<br />

b<strong>in</strong>d<strong>in</strong>g clay material has to be delivered<br />

and <strong>in</strong>corporated <strong>in</strong> layers <strong>of</strong> 0.27 m (after<br />

compaction) accord<strong>in</strong>g to the prevail<strong>in</strong>g<br />

pr<strong>of</strong>ile and has to be compacted layer by<br />

layer (2 layers) such that after compact<strong>in</strong>g<br />

and under consideration <strong>of</strong> tolerances the<br />

m<strong>in</strong>imal required layer thickness <strong>of</strong> 25 cm<br />

has to be kept at all po<strong>in</strong>ts.<br />

The material must have a coefficient <strong>of</strong><br />

permeability below 1 x 10-8 m/s.<br />

Total thickness <strong>of</strong> layers to be<br />

<strong>in</strong>corporated 0.55 m, however m<strong>in</strong>imal<br />

0.50 m.<br />

Incorporation <strong>in</strong>to the base (bottom) area<br />

<strong>of</strong> Cell ST<br />

Specified compaction degree Dpr >= 95%<br />

The material to be compacted has to be<br />

supplied by a temporary storage area <strong>of</strong><br />

the Contractor. The Contractor must certify<br />

that the quality and quantity are sufficient.<br />

The material has to be cont<strong>in</strong>uously<br />

verified accord<strong>in</strong>g to the specifications <strong>of</strong><br />

an <strong>in</strong>dependent geotechnical <strong>in</strong>stitute.<br />

The required tests will be paid accord<strong>in</strong>g<br />

to Section 2.<br />

m2 88,000<br />

Rate Amount


ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 28<br />

Item no. Description Unit Quantity Rate Amount<br />

5.17 M<strong>in</strong>eral seal<strong>in</strong>g, slope area Cell ST<br />

M<strong>in</strong>eral l<strong>in</strong>er shall be supplied and<br />

<strong>in</strong>corporated <strong>in</strong> two layer <strong>of</strong> 0.27 m,<br />

each accord<strong>in</strong>g to the prevail<strong>in</strong>g<br />

pr<strong>of</strong>ile and shall be compacted.<br />

Total thickness <strong>of</strong> layer to be<br />

<strong>in</strong>corporated 0.55 m, however m<strong>in</strong>.<br />

0.50 m.<br />

Incorporation <strong>in</strong> the slope area <strong>of</strong> Cell<br />

ST, Slope gradient: 1:2.5<br />

<strong>Al</strong>l other works as expla<strong>in</strong>ed <strong>in</strong> item<br />

no. 5.16.<br />

m2 4,000<br />

5.18 Sand 0/2 for leachate pipe support<br />

Sand 0/2 mm shall be supplied,<br />

<strong>in</strong>corporated and compacted for the<br />

bedd<strong>in</strong>g <strong>of</strong> leachate dra<strong>in</strong> pipes and<br />

leachate ma<strong>in</strong> pipes,<br />

The material shall be <strong>in</strong>corporated<br />

between two geotextiles <strong>in</strong> the area<br />

<strong>of</strong> the deepen<strong>in</strong>g produced.<br />

Width <strong>of</strong> <strong>in</strong>corporation is approx. 5 m,<br />

thickness <strong>of</strong> <strong>in</strong>corporation 0 to 30 cm. m3 1,700<br />

5.19 Trench, leachate collection pipe<br />

Excavation <strong>of</strong> trenches <strong>in</strong>clud<strong>in</strong>g the<br />

production <strong>of</strong> a base grade for the<br />

ma<strong>in</strong> leachate pipe.<br />

The accounted depth <strong>of</strong> excavation<br />

shall be calculated by tak<strong>in</strong>g the<br />

measure <strong>of</strong> the surface <strong>of</strong> the trench<br />

section which is to be excavated<br />

down to the planned base <strong>of</strong> this<br />

section (lower edge <strong>of</strong> pipe support).<br />

The accounted width <strong>of</strong> trenches shall<br />

be calculated on basis <strong>of</strong> the external<br />

diameter <strong>of</strong> the pipe + 60 cm.<br />

The soil <strong>in</strong> place is expla<strong>in</strong>ed <strong>in</strong> the<br />

Technical Specifications.


ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 29<br />

Item no. Description Unit Quantity Rate Amount<br />

The soil shall be stored temporarily, if<br />

this is necessary, loaded, transported<br />

and <strong>in</strong>corporated as trench fill<strong>in</strong>g<br />

accord<strong>in</strong>gly. Surplus soil or soil which<br />

is unsuitable for fill<strong>in</strong>g purposes shall<br />

become the property <strong>of</strong> the<br />

Contractor and shall be removed from<br />

site and shall be disposed <strong>of</strong> on<br />

expense <strong>of</strong> the Contractor.<br />

Excavation <strong>of</strong> trench for leachate<br />

ma<strong>in</strong> pipes with an <strong>in</strong>ternal diameter<br />

<strong>of</strong> 400 mm, total depth <strong>of</strong> the<br />

trenches vary<strong>in</strong>g from 0.5 m to about<br />

2.0 m.<br />

m3 50<br />

5.20 Sand 0/8 for Pipe Embedment <strong>of</strong><br />

Leachate Collection Pipes<br />

Sand 0/8 mm shall be supplied,<br />

<strong>in</strong>corporated and compacted as pipe<br />

embedment <strong>of</strong> leachate ma<strong>in</strong> pipes<br />

outside the <strong>landfill</strong>.<br />

The material shall be <strong>in</strong>corporated<br />

under trench conditions and also<br />

under dam conditions.<br />

The accounted width <strong>of</strong> the pipe<br />

embedment shall be calculated<br />

accord<strong>in</strong>g to the respective trench<br />

width (trench conditions). Under dam<br />

conditions the pipe must be covered<br />

30 cm on both sides with embedment<br />

material.<br />

The thickness <strong>of</strong> the pipe support<br />

shall be l5 cm. The depth <strong>of</strong> coverage<br />

above the pipe shall be 30 cm.<br />

m3 150<br />

Total for <strong>Bill</strong> No. 5<br />

(carried forward to Summary)


ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 30<br />

<strong>Bill</strong> No. 6: Bentonite Mat<br />

Item no. Description Unit Quantity Rate Amount<br />

6.1 Geo-synthetic clay l<strong>in</strong>er (GCL), pla<strong>in</strong><br />

base <strong>of</strong> new hazardous waste cell<br />

A geo-synthetic clay l<strong>in</strong>er (GCL) shall<br />

be supplied and <strong>in</strong>stalled <strong>in</strong><br />

accordance with manufacturer's<br />

guidel<strong>in</strong>es on the pla<strong>in</strong> base areas <strong>of</strong><br />

the new hazardous waste cell.<br />

The GCL shall be a geo-synthetic clay<br />

l<strong>in</strong>er <strong>in</strong> geocomposite sandwich<br />

format.<br />

The seal<strong>in</strong>g efficiency shall ne based<br />

on a high-swell activated sodium<br />

bentonite layer.<br />

Both carrier- and cover geotextiles <strong>of</strong><br />

the geocomposite shall be PP-woven<br />

materials with high friction surface<br />

coat<strong>in</strong>g, each approx. 450 g/m².<br />

Between the top and bottom<br />

geotextile shall be a 60 g/m²<br />

support<strong>in</strong>g polyester-aer<strong>of</strong>leece, <strong>in</strong>to<br />

which 4,500 g/m² <strong>of</strong> dry high-swell<br />

sodium bentonite powder shall be<br />

placed.<br />

<strong>Al</strong>l layers shall be strongly bound<br />

together by sew<strong>in</strong>g.<br />

Material properties:<br />

� carrier- and cover geotextile:<br />

PP-woven, with high friction<br />

surface coat<strong>in</strong>g<br />

� support<strong>in</strong>g layer:<br />

60 g “aero fleece<br />

� seal<strong>in</strong>g layer:<br />

approx. 4.500 g/m² activated<br />

sodium bentonite<br />

� total weight per unit area (EN<br />

965):<br />

approx. 5.500 g/m²<br />

� Tensile strength (EN ISO 10 319):<br />

approx. 20/30 kN/m (long./trans.)<br />

� Stra<strong>in</strong> at nom<strong>in</strong>al strength:<br />

< 25/25 % (long./trans.)


ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 31<br />

Item no. Description Unit Quantity Rate Amount<br />

� CBR puncture resistance (EN ISO<br />

12236):<br />

3,500 N<br />

� thickness (dry condition EN ISO<br />

9863-2):<br />

8.0 mm<br />

� <strong>in</strong>ternal shear resistance <strong>of</strong><br />

hydrated GCL (direct shear test)<br />

� Angle <strong>of</strong> friction: 36 °<br />

� Cohesion: 25 kN/m²<br />

� Permeability coefficient at 30 kPa<br />

load and 300 mm water head:<br />

5 x 10-11 m/s<br />

The mechanical properties <strong>of</strong> the GCL<br />

shall be verified by both <strong>in</strong>ternal<br />

quality assurance and external quality<br />

control and assurance by an<br />

<strong>in</strong>dependent authorised laboratory.<br />

The production <strong>of</strong> the supplier shall<br />

be EN ISO 9001:2000 certified. Each<br />

roll should have at least one<br />

identification label with roll number<br />

and product type <strong>in</strong> accordance to EN<br />

10320<br />

An adequate <strong>in</strong>surance cover<strong>in</strong>g the<br />

performance risks <strong>of</strong> the GCL related<br />

to product defaults shall be provided<br />

by the supplier.<br />

m2 1,700<br />

6.2 Geo-synthetic clay l<strong>in</strong>er (GCL),<br />

slope area <strong>of</strong> new hazardous waste<br />

cell<br />

A geo-synthetic clay l<strong>in</strong>er (GCL) shall<br />

be supplied and <strong>in</strong>stalled <strong>in</strong><br />

accordance with manufacturer's<br />

guidel<strong>in</strong>es on the slope areas <strong>of</strong> the<br />

new hazardous waste cell (slopes<br />

about 1:2.5, partly 1:2).<br />

<strong>Al</strong>l other works as expla<strong>in</strong>ed <strong>in</strong> item<br />

no. 6.1.<br />

m2 800<br />

Total for <strong>Bill</strong> No. 6<br />

(carried forward to Summary)


ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 32<br />

<strong>Bill</strong> No. 7: Geo-membrane<br />

Item no. Description Unit Quantity Rate Amount<br />

7.1 Geo-membrane layer, pla<strong>in</strong> base<br />

areas<br />

A flexible geo-membrane made from<br />

PEHD shall be supplied, laid and<br />

<strong>in</strong>stalled (welded) <strong>in</strong> accordance with<br />

manufacturer's guidel<strong>in</strong>es on the<br />

m<strong>in</strong>eral seal<strong>in</strong>g <strong>in</strong> the pla<strong>in</strong> base areas<br />

<strong>of</strong> the <strong>landfill</strong> site.<br />

The sheet<strong>in</strong>gs shall be laid out <strong>in</strong> full<br />

size and pla<strong>in</strong> on the base <strong>of</strong> <strong>landfill</strong><br />

site. No wr<strong>in</strong>kl<strong>in</strong>g is allowed. The<br />

overlaps <strong>in</strong> longitud<strong>in</strong>al and<br />

transverse direction shall be m<strong>in</strong>. 15<br />

cm. Only the ground covered by the<br />

geotextile shall be remunerated, the<br />

overlapp<strong>in</strong>g part shall be <strong>in</strong>cluded <strong>in</strong><br />

the standard price.<br />

The weld<strong>in</strong>g seams shall be executed<br />

as double seams with <strong>in</strong>spection<br />

channel. Each weld<strong>in</strong>g seam shall be<br />

tested for impermeability and<br />

cohesiveness accord<strong>in</strong>g to the<br />

exist<strong>in</strong>g regulations. A protocol for<br />

each seam test shall be given to the<br />

Project Manager.<br />

When the sheet<strong>in</strong>gs are welded<br />

attention has to be paid to restrictions<br />

due to unsuitable weather conditions.<br />

That the chemical resistance and<br />

physical properties shall be verified <strong>in</strong><br />

accordance with the relevant<br />

regulations (such as ASTM D 1593,<br />

ASTM D 638, etc.).<br />

The MFI Index (MFI 190/5) <strong>of</strong> the<br />

flexible geo-membrane layers shall be<br />

more than 2.<br />

Thickness <strong>of</strong> geo-membrane layer<br />

shall m<strong>in</strong>. 1.5 mm, the width <strong>of</strong> a layer<br />

shall be 5 m.<br />

m2 88,000


ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 33<br />

Item no. Description Unit Quantity Rate Amount<br />

7.2 Geo-membrane layer, slope areas<br />

A flexible geo-membrane made from<br />

PEHD shall be supplied, laid and<br />

<strong>in</strong>stalled (welded) <strong>in</strong> accordance with<br />

manufacturer's guidel<strong>in</strong>es on the<br />

m<strong>in</strong>eral seal<strong>in</strong>g <strong>in</strong> the slope areas <strong>of</strong><br />

the <strong>landfill</strong> site (slopes about 1:2.5).<br />

<strong>Al</strong>l other works as expla<strong>in</strong>ed <strong>in</strong> item<br />

no. 7.1.<br />

7.3 Geo-membrane layer, leachate<br />

pond, pla<strong>in</strong> base<br />

A flexible geo-membrane made from<br />

PEHD shall be supplied, laid and<br />

<strong>in</strong>stalled (welded) <strong>in</strong> accordance with<br />

manufacturer's guidel<strong>in</strong>es on the<br />

m<strong>in</strong>eral seal<strong>in</strong>g <strong>in</strong> the pla<strong>in</strong> base area<br />

<strong>of</strong> the leachate pond.<br />

<strong>Al</strong>l other works as expla<strong>in</strong>ed <strong>in</strong> item<br />

no. 7.1.<br />

7.4 Geo-membrane layer, leachate<br />

pond, slope areas<br />

A flexible geo-membrane made from<br />

PEHD shall be supplied, laid and<br />

<strong>in</strong>stalled (welded) <strong>in</strong> accordance with<br />

manufacturer's guidel<strong>in</strong>es on the<br />

m<strong>in</strong>eral seal<strong>in</strong>g <strong>in</strong> the pla<strong>in</strong> slope<br />

areas <strong>of</strong> the leachate pond (slopes<br />

1:2).<br />

<strong>Al</strong>l other works as expla<strong>in</strong>ed <strong>in</strong> item<br />

no. 7.1.<br />

7.5 Geo-membrane layer, new<br />

hazardous waste cell, pla<strong>in</strong> base<br />

A flexible geo-membrane made from<br />

PEHD shall be supplied, laid and<br />

<strong>in</strong>stalled (welded) <strong>in</strong> accordance with<br />

manufacturer's guidel<strong>in</strong>es on the<br />

bentonite mat <strong>in</strong> the pla<strong>in</strong> base area<br />

<strong>of</strong> the new hazardous waste cell.<br />

<strong>Al</strong>l other works as expla<strong>in</strong>ed <strong>in</strong> item<br />

no. 7.1.<br />

m2<br />

4,000<br />

m2 2,000<br />

m2<br />

2,000<br />

m2 1,700


ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 34<br />

7.6 Geo-membrane layer, new<br />

hazardous waste cell, slope areas<br />

A flexible geo-membrane made from<br />

PEHD shall be supplied, laid and<br />

<strong>in</strong>stalled (welded) <strong>in</strong> accordance with<br />

manufacturer's guidel<strong>in</strong>es on the<br />

bentonite mat <strong>in</strong> the pla<strong>in</strong> slope areas<br />

<strong>of</strong> the new hazardous waste cell<br />

(slopes 1:2).<br />

<strong>Al</strong>l other works as expla<strong>in</strong>ed <strong>in</strong> item<br />

no. 7.1.<br />

7.7 Open<strong>in</strong>g to lead through pipe<br />

d=315 mm / d = 250 mm<br />

The above mentioned geo-membrane<br />

shall be <strong>in</strong>stalled <strong>in</strong> a way that an<br />

open<strong>in</strong>g can be produced which<br />

allows to lead through PE-HD pipes<br />

with an external diameter <strong>of</strong> 315 mm<br />

respectively <strong>in</strong>ternal diameter <strong>of</strong> 250<br />

mm (e. a. leachate dra<strong>in</strong> pipe) <strong>in</strong> the<br />

area <strong>of</strong> the outside dams <strong>of</strong> the<br />

support layer as well as <strong>in</strong> the outlet<br />

<strong>of</strong> the leachate pond.<br />

The <strong>in</strong>corporation shall be carried out<br />

impermeable accord<strong>in</strong>g to the<br />

manufacturer's guidel<strong>in</strong>es.<br />

7.8 Open<strong>in</strong>g to lead through Pipe<br />

d=400 mm / d = 350 mm<br />

The above mentioned geo-membrane<br />

shall be <strong>in</strong>stalled <strong>in</strong> a way that an<br />

open<strong>in</strong>g can be produced which<br />

allows a lead<strong>in</strong>g through PE-HD pipes<br />

with an external diameter <strong>of</strong> 400 mm<br />

respectively <strong>in</strong>ternal diameter <strong>of</strong> 350<br />

mm (f. e. leachate ma<strong>in</strong> pipe) <strong>in</strong> the<br />

area <strong>of</strong> the outside dams <strong>of</strong> the<br />

support layer as well as <strong>in</strong> the <strong>in</strong>let <strong>of</strong><br />

the leachate pond.<br />

The <strong>in</strong>corporation shall be carried out<br />

impermeable accord<strong>in</strong>g to the<br />

manufacturer's guidel<strong>in</strong>es.<br />

m2 800<br />

pieces 11<br />

pieces 7


ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 35<br />

Item no. Description Unit Quantity Rate Amount<br />

7.9 Extra charge for embedd<strong>in</strong>g geomembrane<br />

Extra charge for embedd<strong>in</strong>g the<br />

above mentioned geo-membrane <strong>in</strong><br />

the m<strong>in</strong>eral seal<strong>in</strong>g layer on the upper<br />

edge <strong>of</strong> the leachate pond accord<strong>in</strong>g<br />

to the relevant detail draw<strong>in</strong>g and to<br />

the Project Manager's requirements.<br />

The payment has to be calculated<br />

based on l<strong>in</strong>ear meters <strong>of</strong> embedd<strong>in</strong>g.<br />

<strong>Al</strong>l costs for the required works and<br />

services to be supplied for this<br />

process have to be <strong>in</strong>cluded <strong>in</strong> the<br />

standard price.<br />

The embedd<strong>in</strong>g must be also done for<br />

the new hazardous waste cell<br />

m 440<br />

Total for <strong>Bill</strong> No. 7<br />

(carried forward to Summary)


ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 36<br />

<strong>Bill</strong> No. 8: Geo-textiles<br />

Item no. Description Unit Quantity Rate Amount<br />

8.1 Geo-textile 400 g/m2, seal<strong>in</strong>g <strong>of</strong><br />

sand bed<br />

A geo-textile shall be supplied and<br />

laid out as a cover layer for the sand<br />

bed <strong>in</strong> the area <strong>of</strong> the leachate pipes<br />

and leachate ma<strong>in</strong> pipes and as cover<br />

<strong>in</strong> the area <strong>of</strong> the end <strong>of</strong> the base<br />

seal<strong>in</strong>g system.<br />

Overlaps <strong>in</strong> longitud<strong>in</strong>al and<br />

transverse direction shall be m<strong>in</strong>. 50<br />

cm.<br />

Only the ground covered by the geotextile<br />

shall be remunerated, the<br />

overlapp<strong>in</strong>g parts shall be <strong>in</strong>cluded <strong>in</strong><br />

the standard price.<br />

The geo-textile shall be made <strong>of</strong><br />

mechanically bonded polypropylene<br />

filaments.<br />

The geo-textile shall be made <strong>of</strong><br />

mechanically bonded PEHD filaments.<br />

The chemical resistance and the<br />

physical properties <strong>in</strong> accordance<br />

with the relevant regulations (such as<br />

EN 10319, EN ISO 12236 etc.) shall be<br />

verified by both <strong>in</strong>ternal quality<br />

assurance and external quality control<br />

and assurance by an <strong>in</strong>dependent<br />

authorised laboratory.<br />

The strip tensile strength accord<strong>in</strong>g to<br />

EN ISO 10319 shall be m<strong>in</strong>. 20 kN/m<br />

(mach<strong>in</strong>e direction/cross mach<strong>in</strong>e<br />

direction)<br />

The specific weight <strong>of</strong> the geo-textile<br />

shall be about 400 g/m2.<br />

m2 12,000


ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 37<br />

Item no. Description Unit Quantit<br />

y<br />

8.2 Open<strong>in</strong>g to lead through pipes<br />

The above mentioned geo-textile<br />

with weight <strong>of</strong> 400 g/m2 shall be<br />

<strong>in</strong>stalled <strong>in</strong> a way that an open<strong>in</strong>g can<br />

be produced which allows to lead<br />

through PE-HD pipes with an external<br />

diameter <strong>of</strong> 400 mm resp. <strong>in</strong>ternal<br />

diameter <strong>of</strong> 350 mm (leachate<br />

collection pipe) or 315 mm (leachate<br />

dra<strong>in</strong> pipes) resp. <strong>in</strong>ternal diameter <strong>of</strong><br />

250 mm to lead the pipe out <strong>of</strong> the<br />

<strong>landfill</strong> site.<br />

The <strong>in</strong>corporation shall be carried out<br />

accord<strong>in</strong>g to the manufacturer's<br />

guidel<strong>in</strong>es.<br />

pieces 13<br />

8.3 Geo-textile 1,200 g/m2, pla<strong>in</strong> base<br />

<strong>of</strong> <strong>landfill</strong> site<br />

A geo-textile shall be supplied and<br />

laid out as a protection layer above<br />

the geo-membrane <strong>in</strong> the pla<strong>in</strong> base<br />

areas <strong>of</strong> the <strong>landfill</strong> site <strong>in</strong> accordance<br />

with the manufacturer’s guidel<strong>in</strong>es.<br />

Overlaps <strong>in</strong> longitud<strong>in</strong>al and<br />

transverse direction shall be m<strong>in</strong>. 50<br />

cm.<br />

Only the ground covered by the geotextile<br />

shall be remunerated, the<br />

overlapp<strong>in</strong>g parts shall be <strong>in</strong>cluded <strong>in</strong><br />

the standard price.<br />

The geo-textile shall be made <strong>of</strong><br />

mechanically bonded PEHD filaments.<br />

The chemical resistance and the<br />

physical properties <strong>in</strong> accordance<br />

with the relevant regulations (such as<br />

EN 10319, EN ISO 12236 etc.) shall be<br />

verified by both <strong>in</strong>ternal quality<br />

assurance and external quality control<br />

and assurance by an <strong>in</strong>dependent<br />

authorised laboratory.<br />

The specific weight <strong>of</strong> the geo-textile<br />

shall be m<strong>in</strong>. 1,200 g/m2.<br />

m2 88,000<br />

Rate Amount


ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 38<br />

Item<br />

Description Unit Quanti<br />

no.<br />

ty<br />

8.4 Geo-textile 1,200 g/m2, pla<strong>in</strong> base <strong>of</strong><br />

leachate pond<br />

A geo-textile shall be supplied and laid out<br />

as a protection layer above the geomembrane<br />

<strong>in</strong> the pla<strong>in</strong> base areas <strong>of</strong> the<br />

leachate pond.<br />

<strong>Al</strong>l other works as expla<strong>in</strong>ed <strong>in</strong> item no. 8.3. m2 2,000<br />

8.5 Geo-textile 1,200 g/m2, pla<strong>in</strong> base <strong>of</strong><br />

new hazardous waste cell<br />

A geo-textile shall be supplied and laid out<br />

as a protection layer above the geomembrane<br />

<strong>in</strong> the pla<strong>in</strong> base areas <strong>of</strong> the<br />

new hazardous waste cell.<br />

<strong>Al</strong>l other works as expla<strong>in</strong>ed <strong>in</strong> item no. 8.3. m2 1,700<br />

8.6 Geo-textile 1,200 g/m2, slope areas <strong>of</strong><br />

<strong>landfill</strong> site and leachate pond<br />

A geo-textile shall be supplied and laid out<br />

as a protection layer above the geomembrane<br />

<strong>in</strong> the slope areas <strong>of</strong> the <strong>landfill</strong><br />

site and the leachate pond.<br />

<strong>Al</strong>l other works as expla<strong>in</strong>ed <strong>in</strong> item no. 8.3.<br />

8.7 Geo-textile 1,200 g/m2, slope area <strong>of</strong><br />

new hazardous waste cell<br />

A geo-textile shall be supplied and laid out<br />

as a protection layer above the geomembrane<br />

<strong>in</strong> the slope areas <strong>of</strong> the new<br />

hazardous waste cell.<br />

<strong>Al</strong>l other works as expla<strong>in</strong>ed <strong>in</strong> item no. 8.3.<br />

8.8 Open<strong>in</strong>g to lead through pipe d=400 mm<br />

The above mentioned geo-textile with<br />

weight <strong>of</strong> 1,200 g/m2 shall be <strong>in</strong>stalled <strong>in</strong> a<br />

way that an open<strong>in</strong>g can be produced<br />

which allows to lead through PE-HD pipes<br />

with an external diameter <strong>of</strong> 400 mm<br />

respectively with an <strong>in</strong>ternal diameter <strong>of</strong><br />

350 mm <strong>in</strong> the area <strong>of</strong> the separat<strong>in</strong>g dams<br />

or the leachate pond. The <strong>in</strong>corporation<br />

shall be carried out accord<strong>in</strong>g to the<br />

manufacturer's guidel<strong>in</strong>es.<br />

m2<br />

m2<br />

pieces 7<br />

12,000<br />

800<br />

Rate Amount


ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 39<br />

Item no. Description Unit Quanti<br />

ty<br />

Rate Amount<br />

8.9 Open<strong>in</strong>g to lead through pipe d=315<br />

mm<br />

The above mentioned geo-textile with<br />

weight <strong>of</strong> 1,200 g/m2 shall be <strong>in</strong>stalled<br />

<strong>in</strong> a way that an open<strong>in</strong>g can be<br />

produced which allows to lead through<br />

PE-HD pipes with an external diameter<br />

<strong>of</strong> 315 mm respectively with an <strong>in</strong>ternal<br />

diameter <strong>of</strong> 250 mm <strong>in</strong> the area <strong>of</strong> the<br />

separat<strong>in</strong>g dams and the leachate pond.<br />

The <strong>in</strong>corporation shall be carried out<br />

accord<strong>in</strong>g to the manufacturer's<br />

guidel<strong>in</strong>es.<br />

pieces 11<br />

8.10 Extra charge for embedd<strong>in</strong>g<br />

geotextile<br />

Extra charge for embedd<strong>in</strong>g the above<br />

mentioned geotextile with weight<br />

1,200 g/m2 <strong>in</strong> the m<strong>in</strong>eral seal<strong>in</strong>g layer<br />

on the upper edge <strong>of</strong> the leachate pond<br />

accord<strong>in</strong>g to the relevant detail draw<strong>in</strong>g<br />

and to the Project Manager's<br />

requirements.<br />

The end <strong>of</strong> the geo-membrane shall be<br />

covered with suitable soil.<br />

The payment has to be calculated based<br />

on l<strong>in</strong>ear meters <strong>of</strong> embedd<strong>in</strong>g.<br />

<strong>Al</strong>l costs for the required works and<br />

services to be supplied for this process<br />

have to be <strong>in</strong>cluded <strong>in</strong> the standard<br />

price.<br />

The embedd<strong>in</strong>g must be also done for<br />

the new hazardous waste cell<br />

m 440<br />

Total for <strong>Bill</strong> No. 8<br />

(carried forward to Summary)


ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 40<br />

<strong>Bill</strong> No. 9: Dra<strong>in</strong>age layer<br />

Item no. Description Unit Quantity Rate Amount<br />

9.1 Filter gravel 16/32 mm, pla<strong>in</strong> base<br />

areas<br />

A surface filter made <strong>of</strong> filter gravel<br />

16/32 mm shall be supplied and<br />

<strong>in</strong>corporated on the geotextile <strong>in</strong> the<br />

pla<strong>in</strong> base areas <strong>of</strong> the <strong>landfill</strong> site.<br />

Prior the <strong>in</strong>corporation, a qualification<br />

exam<strong>in</strong>ation <strong>of</strong> the material used shall<br />

be supplied by the Contractor.<br />

The thickness <strong>of</strong> the layer applied<br />

shall be m<strong>in</strong>. 30 cm. The CaCO3content<br />

<strong>of</strong> the material shall be<br />

smaller than 20%.<br />

Installation shall be carried out as<br />

described below:<br />

Application <strong>of</strong> gravel shall be started<br />

from the edge <strong>of</strong> the application area.<br />

The application device must always<br />

stand on the already applied filter<br />

gravel and it shall distribute the<br />

material to be applied from this<br />

position.<br />

The application device must never be<br />

positioned onto the geotextile. m2 88,000<br />

9.2 Filter gravel 16/32 mm, slope areas<br />

A surface filter made <strong>of</strong> filter gravel<br />

16/32 mm shall be supplied and<br />

<strong>in</strong>corporated on the geotextile on<br />

slope areas <strong>of</strong> the <strong>landfill</strong> site and on<br />

the separation dams, slope gradient<br />

1:2 to 1:2.5, all other works as<br />

expla<strong>in</strong>ed <strong>in</strong> item 9.1.<br />

m2 4,000


ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 41<br />

Item no. Description Unit Quantity Rate Amount<br />

9.3 Filter gravel 16/32 mm, protection<br />

dam above dra<strong>in</strong> pipes<br />

Filter gravel 16/32 mm shall be<br />

supplied and <strong>in</strong>corporated as a<br />

protection dam above the leachate<br />

dra<strong>in</strong> pipes and the leachate ma<strong>in</strong><br />

pipe.<br />

The height <strong>of</strong> dam shall be from<br />

0.60m to 0.80m above the pipes, the<br />

slope gradient shall be 1:1.5, the<br />

width <strong>of</strong> berm crown shall be from<br />

0.60m to 0.80m. The CaCO3-content<br />

<strong>of</strong> the material shall be smaller than<br />

20%.<br />

m3<br />

1,700<br />

Total for <strong>Bill</strong> No. 9<br />

(carried forward to Summary)


ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 42<br />

<strong>Bill</strong> No. 10: PE-HD Works<br />

Item no. Description Unit Quantity Rate Amount<br />

For all pipel<strong>in</strong>es and connect<strong>in</strong>g<br />

elements (fitt<strong>in</strong>gs etc) a pipe static<br />

calculation shall be provided by the<br />

Contractor. The remuneration shall be<br />

calculated accord<strong>in</strong>g to a separate<br />

position <strong>in</strong> bill no. 1.<br />

The pipes must not be stored <strong>in</strong> areas<br />

where they are exposed to direct<br />

sunlight. If no place <strong>in</strong> the shadow is<br />

available they have to be covered<br />

accord<strong>in</strong>g to the Project Manager's<br />

<strong>in</strong>structions.<br />

For every s<strong>in</strong>gle welded jo<strong>in</strong>t (sockets<br />

for resistance weld<strong>in</strong>g and heated<br />

tool butt weld<strong>in</strong>g) a weld<strong>in</strong>g record<br />

shall be provided accord<strong>in</strong>g to<br />

Technical Specification. This record is<br />

to be handed over to the Project<br />

Manager.<br />

After the weld<strong>in</strong>g process all <strong>in</strong>ternal<br />

burrs at the weld<strong>in</strong>g seams shall be<br />

completely removed.<br />

This work shall be <strong>in</strong>cluded <strong>in</strong> the<br />

follow<strong>in</strong>g standard prices.<br />

The standard prices also <strong>in</strong>clude all<br />

necessary cutt<strong>in</strong>g and weld<strong>in</strong>g <strong>of</strong> the<br />

pipes, when fitt<strong>in</strong>g lengths are<br />

required.


ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 43<br />

Item no. Description Unit Quantity Rate Amount<br />

10.1 PE-HD leachate dra<strong>in</strong> pipe<br />

315*28,6, SDR 11<br />

A leachate dra<strong>in</strong> pipe made from<br />

extruded PE-HD shall be supplied and<br />

<strong>in</strong>corporated <strong>in</strong> the entire cell for the<br />

leachate collection accord<strong>in</strong>g to the<br />

manufacturer's guidel<strong>in</strong>es and/or the<br />

Project Manager's <strong>in</strong>structions.<br />

The pipes shall be <strong>in</strong>stalled <strong>in</strong><br />

different <strong>in</strong>cl<strong>in</strong>ations.<br />

The leachate dra<strong>in</strong> pipe shall be 2/3<br />

slotted, with 3 circumferential slots,<br />

gradient <strong>of</strong> the lower slots with 2%<br />

<strong>in</strong>cl<strong>in</strong>ation with respect to the pipe<br />

<strong>in</strong>vert.<br />

The slot length shall be 80 mm, the<br />

slot width shall be 10 mm.<br />

The <strong>in</strong>dividual pipes are connected by<br />

means <strong>of</strong> the heated tool butt<br />

weld<strong>in</strong>g process. <strong>Al</strong>l required works<br />

and services to be supplied for this<br />

process have to be <strong>in</strong>cluded <strong>in</strong> the<br />

standard price.<br />

The external pipe diameter shall be<br />

315 mm, the wall thickness shall be<br />

28.6 mm. The pipe shall be suitable<br />

for pressure class SDR 11.<br />

The follow<strong>in</strong>g parameters have to be<br />

considered for the static calculation:<br />

- Weight <strong>of</strong> unit volume <strong>of</strong> waste<br />

approximately 10 kN/m³<br />

- Waste cover<strong>in</strong>g <strong>of</strong> the pipe up to 30<br />

m<br />

- Lay<strong>in</strong>g conditions as for dam<br />

- Gravel layer up to approximately<br />

60 to 90 cm above pipe<br />

- Pipe support made from sand,<br />

support angle 120 degrees<br />

m 800


ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 44<br />

Item no. Description Unit Quantity Rate Amount<br />

10.2 PE-HD leachate dra<strong>in</strong> pipe di 250<br />

Leachate dra<strong>in</strong> pipe made from<br />

extruded PE-HD material shall be<br />

supplied and <strong>in</strong>corporated <strong>in</strong> the<br />

entire<br />

cell for leachate collection accord<strong>in</strong>g<br />

to the manufacturer's guidel<strong>in</strong>es<br />

and/or the Project Manager's<br />

<strong>in</strong>structions.<br />

The pipes shall be <strong>in</strong>stalled <strong>in</strong><br />

different<br />

<strong>in</strong>cl<strong>in</strong>ations.<br />

The leachate dra<strong>in</strong> pipe shall be 2/3<br />

slotted, with 3 circumferential slots,<br />

gradient <strong>of</strong> the lower slots with 2%<br />

<strong>in</strong>cl<strong>in</strong>ation with respect to the pipe<br />

<strong>in</strong>vert.<br />

The slot length shall be 80 mm, the<br />

slot width shall be 10 mm.<br />

The <strong>in</strong>dividual pipes are connected by<br />

means <strong>of</strong> the heated tool butt<br />

weld<strong>in</strong>g process. <strong>Al</strong>l required works<br />

and services to be supplied for this<br />

process have to be <strong>in</strong>cluded <strong>in</strong> the<br />

standard price.<br />

The <strong>in</strong>ternal pipe diameter shall be<br />

250 mm, the wall thickness shall be<br />

accord<strong>in</strong>g to the static requirements<br />

for cover<strong>in</strong>g from 30 to 55 m.<br />

The follow<strong>in</strong>g parameters shall be<br />

considered for the static calculation:<br />

- Weight <strong>of</strong> unit volume <strong>of</strong> waste<br />

approximately 10 kN/m³<br />

- Waste cover<strong>in</strong>g up to 50 m<br />

- Lay<strong>in</strong>g conditions as for dam<br />

- Gravel layer up to approximately<br />

60 to 90 cm above pipe<br />

- Pipe support made from sand,<br />

support angle 120 degrees<br />

m 280


ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 45<br />

Item no. Description Unit Quantity Rate Amount<br />

10.3 PE-HD leachate ma<strong>in</strong> pipe<br />

400*36.3, SDR 11<br />

Leachate ma<strong>in</strong> pipe made from<br />

extruded PE-HD shall be supplied and<br />

<strong>in</strong>corporated <strong>in</strong> the entire cell for the<br />

leachate collection accord<strong>in</strong>g to the<br />

manufacturer's guidel<strong>in</strong>es and/or the<br />

Project Manager's <strong>in</strong>structions.<br />

The pipes shall be <strong>in</strong>stalled <strong>in</strong><br />

different <strong>in</strong>cl<strong>in</strong>ations.<br />

The external pipe diameter shall be<br />

400 mm, the wall thickness shall be<br />

36.3 mm. The pipe shall be suitable<br />

for pressure class SDR 11.<br />

<strong>Al</strong>l other works as expla<strong>in</strong>ed <strong>in</strong> item<br />

no. 10.1<br />

10.4 PE-HD leachate ma<strong>in</strong> pipe di 350<br />

Leachate ma<strong>in</strong> pipe made from<br />

extruded PE-HD material shall be<br />

supplied and <strong>in</strong>corporated <strong>in</strong> the<br />

entire<br />

cell for leachate collection accord<strong>in</strong>g<br />

to the manufacturer's guidel<strong>in</strong>es<br />

and/or the Project Manager's<br />

<strong>in</strong>structions.<br />

The pipes shall be <strong>in</strong>stalled <strong>in</strong><br />

different<br />

<strong>in</strong>cl<strong>in</strong>ations.<br />

The <strong>in</strong>ternal pipe diameter shall be<br />

350 mm, the wall thickness shall be<br />

accord<strong>in</strong>g to the static requirements<br />

for cover<strong>in</strong>g from 30 to 50 m.<br />

<strong>Al</strong>l other works as expla<strong>in</strong>ed <strong>in</strong> item<br />

no. 10.2<br />

m<br />

m<br />

400<br />

200


ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 46<br />

Item no. Description Unit Quantity Rate Amount<br />

10.5 PEHD monobloc pipe 315*28.6 mm<br />

A monobloc pipe made from<br />

extruded PE-HD shall be supplied and<br />

<strong>in</strong>corporated as end pieces for the<br />

leachate dra<strong>in</strong> pipes respectively<br />

accord<strong>in</strong>g to the manufacturer's<br />

guidel<strong>in</strong>es and/or the <strong>in</strong>structions <strong>of</strong><br />

the Project Manager.<br />

The <strong>in</strong>dividual pipes shall be<br />

connected by means <strong>of</strong> the heated<br />

tool butt weld<strong>in</strong>g process. <strong>Al</strong>l<br />

required works and services to be<br />

supplied for this process shall be<br />

<strong>in</strong>cluded <strong>in</strong> the standard price.<br />

The external pipe diameter shall be<br />

315 mm, the wall thickness shall be<br />

28.6 mm. The pipe shall be suitable<br />

for pressure class SDR 11.<br />

The follow<strong>in</strong>g parameters have to be<br />

considered for the static calculation:<br />

- Weight <strong>of</strong> unit volume <strong>of</strong> waste<br />

approximately 10 kN/m³<br />

- Waste cover<strong>in</strong>g <strong>of</strong> the pipe up to 10<br />

m<br />

- Lay<strong>in</strong>g conditions as for dam<br />

- Gravel layer up to approximately<br />

60 to 90 cm above pipe<br />

- Pipe support made from sand,<br />

support angle 120 degrees<br />

m 20<br />

10.6 PEHD monobloc pipe 400*36.3 mm<br />

Monobloc pipes made from extruded<br />

PE-HD shall be supplied as end pieces<br />

for the leachate ma<strong>in</strong> pipes accord<strong>in</strong>g<br />

to the manufacturer's guidel<strong>in</strong>es<br />

and/or the <strong>in</strong>structions <strong>of</strong> the Project<br />

Manager.<br />

The external pipe diameter shall be<br />

400 mm, the wall thickness shall be<br />

36.3 mm. The pipe shall be suitable<br />

for pressure class SDR 11.<br />

- Waste cover<strong>in</strong>g <strong>of</strong> the pipe up to 10<br />

m<br />

<strong>Al</strong>l other works as expla<strong>in</strong>ed <strong>in</strong> item<br />

no. 10.5.<br />

m 20


ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 47<br />

Item<br />

Description Unit Quantit<br />

no.<br />

y<br />

10.7 PEHD monobloc pipe di 250 mm<br />

Monobloc pipes made from extruded PE-<br />

HD shall be supplied as end pieces for<br />

the leachate pipes <strong>of</strong> item 10.2,<br />

accord<strong>in</strong>g to the manufacturer's<br />

guidel<strong>in</strong>es and/or the <strong>in</strong>structions <strong>of</strong> the<br />

Project Manager.<br />

The <strong>in</strong>ternal pipe diameter shall be<br />

250 mm, the pipe shall be suitable for<br />

pressure class SDR 11.<br />

- Waste cover<strong>in</strong>g <strong>of</strong> the pipe up to 10 m<br />

<strong>Al</strong>l other works as expla<strong>in</strong>ed <strong>in</strong> item no.<br />

10.5.<br />

m 200<br />

10.8 PEHD monobloc pipe di 350 mm<br />

Monobloc pipes made from extruded PE-<br />

HD shall be supplied as end pieces for<br />

the leachate pipes <strong>of</strong> item 10.4,<br />

accord<strong>in</strong>g to the manufacturer's<br />

guidel<strong>in</strong>es and/or the <strong>in</strong>structions <strong>of</strong> the<br />

Project Manager.<br />

The <strong>in</strong>ternal pipe diameter shall be<br />

350 mm, the pipe shall be suitable for<br />

pressure class SDR 11.<br />

- Waste cover<strong>in</strong>g <strong>of</strong> the pipe up to 10 m<br />

<strong>Al</strong>l other works as expla<strong>in</strong>ed <strong>in</strong> item no.<br />

10.5.<br />

m 5<br />

10.9 PEHD monobloc pipe 400*36.3 mm<br />

Monobloc pipes made from extruded PE-<br />

HD shall be supplied as temporary<br />

leachate ma<strong>in</strong> pipes outside the <strong>landfill</strong><br />

(connection from <strong>landfill</strong> to leachate<br />

pond) accord<strong>in</strong>g to the manufacturer's<br />

guidel<strong>in</strong>es and/or the <strong>in</strong>structions <strong>of</strong> the<br />

Project Manager.<br />

The external pipe diameter shall be<br />

400 mm, the wall thickness shall be 36.3<br />

mm. The pipe shall be suitable for<br />

pressure class SDR 11.<br />

- no waste coverage, pipes are laid <strong>in</strong><br />

trenches (depth about 2 m) or on top <strong>of</strong><br />

waste slopes<br />

<strong>Al</strong>l other works as expla<strong>in</strong>ed <strong>in</strong> item no.<br />

10.5.<br />

m 140<br />

Rate Amount


ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 48<br />

Item no. Description Unit Quantity Rate Amount<br />

10.10 T-Piece PE-HD, external diameter<br />

400/315, SDR 11<br />

A t-piece with a reduced end piece made<br />

from <strong>in</strong>jection-moulded PE-HD shall be<br />

supplied and <strong>in</strong>stalled for the connections<br />

<strong>of</strong> the leachate dra<strong>in</strong> pipes to the ma<strong>in</strong><br />

leachate pipe accord<strong>in</strong>g to the<br />

manufacturer's guidel<strong>in</strong>es and/or the<br />

Project Manager's <strong>in</strong>structions.<br />

The <strong>in</strong>dividual pipes are connected by<br />

means <strong>of</strong> sockets for resistance weld<strong>in</strong>g.<br />

<strong>Al</strong>l required works have to be <strong>in</strong>cluded <strong>in</strong><br />

the standard price.<br />

The external pipe diameter shall be<br />

400 mm, the wall thickness <strong>in</strong> the ma<strong>in</strong><br />

leachate pipe shall be 36.3 mm.<br />

The external pipe diameter <strong>of</strong> the end<br />

piece (for the leachate dra<strong>in</strong> pipe) shall be<br />

315 mm, the wall thickness shall be 28.6<br />

mm.<br />

Waste coverage amounts to about 30 m<br />

(for static calculation)<br />

piece 4<br />

10.11 T-Piece PE-HD, <strong>in</strong>ternal diameter<br />

350/250<br />

A t-piece with a reduced end piece made<br />

from <strong>in</strong>jection-moulded PE-HD shall be<br />

supplied and <strong>in</strong>stalled for the connections<br />

<strong>of</strong> the leachate dra<strong>in</strong> pipes to the ma<strong>in</strong><br />

leachate pipe accord<strong>in</strong>g to the<br />

manufacturer's guidel<strong>in</strong>es and/or the<br />

Project Manager's <strong>in</strong>structions.<br />

The <strong>in</strong>dividual pipes are connected by<br />

means <strong>of</strong> sockets for resistance weld<strong>in</strong>g.<br />

<strong>Al</strong>l required works have to be <strong>in</strong>cluded <strong>in</strong><br />

the standard price.<br />

The <strong>in</strong>ternal pipe diameter shall be<br />

350 mm, the wall thickness accord<strong>in</strong>g to<br />

static requirements.<br />

The <strong>in</strong>ternal pipe diameter <strong>of</strong> the end<br />

piece shall be 250 mm, the wall thickness<br />

accord<strong>in</strong>g to static requirements.<br />

Waste coverage amounts to about 50 m<br />

(for static calculation)<br />

piece<br />

4


ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 49<br />

Item no. Description Unit Quantity Rate Amount<br />

10.12 T-Piece PE-HD, external diameter<br />

400/400, SDR 11<br />

A t-piece made from <strong>in</strong>jectionmoulded<br />

PE-HD shall be supplied and<br />

<strong>in</strong>stalled for the connections <strong>of</strong> the<br />

leachate ma<strong>in</strong> pipes to the temporary<br />

leachate pipe accord<strong>in</strong>g to the<br />

manufacturer's guidel<strong>in</strong>es and/or the<br />

Project Manager's <strong>in</strong>structions.<br />

The external pipe diameter shall be<br />

400 mm, the wall thickness shall be<br />

36.3 mm on all sides.<br />

<strong>Al</strong>l other works as expla<strong>in</strong>ed <strong>in</strong> item<br />

no. 10.10 resp. 10.9<br />

10.13 PE-HD pipe bend, 400*36,3 SDR 11<br />

A pipe bend made from PE-HD shall<br />

be supplied and <strong>in</strong>stalled <strong>in</strong> the<br />

temporary leachate pipe accord<strong>in</strong>g to<br />

the manufacturer's guidel<strong>in</strong>es and/or<br />

the Project Manager's <strong>in</strong>structions.<br />

The <strong>in</strong>dividual pipe pieces shall be<br />

connected by means <strong>of</strong> heated tool<br />

butt weld<strong>in</strong>g. <strong>Al</strong>l required works have<br />

to be <strong>in</strong>cluded <strong>in</strong> the standard price.<br />

The pipe bend shall be supplied <strong>in</strong> all<br />

necessary angles (15 and 90 degrees).<br />

The external pipe diameter shall be<br />

400 mm, the wall thickness shall be<br />

36.3 mm.<br />

The fitt<strong>in</strong>g shall be suitable for<br />

pressure class SDR 11.<br />

piece<br />

piece<br />

2<br />

2


ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 50<br />

Item no. Description Unit Quantity Rate Amount<br />

10.14 Weld<strong>in</strong>g neck 315*28.6 with<br />

movable flange<br />

A weld<strong>in</strong>g neck made from PE-HD<br />

with a movable flange shall be<br />

supplied and <strong>in</strong>stalled <strong>in</strong> the leachate<br />

pipe system accord<strong>in</strong>g to the<br />

manufacturer's guidel<strong>in</strong>es and/or the<br />

Project Manager's <strong>in</strong>structions.<br />

The connection to the pipe shall be<br />

done by means <strong>of</strong> sockets <strong>of</strong><br />

resistance weld<strong>in</strong>g. <strong>Al</strong>l required works<br />

have to be <strong>in</strong>cluded <strong>in</strong> the standard<br />

price.<br />

The movable flange shall be made <strong>of</strong><br />

glass fiber re<strong>in</strong>forced PP with steel<br />

re<strong>in</strong>forcement.<br />

The fitt<strong>in</strong>g shall have an external pipe<br />

piece 4<br />

diameter <strong>of</strong> 315 mm<br />

10.15 Weld<strong>in</strong>g neck 400*36.3 with<br />

movable flange<br />

A weld<strong>in</strong>g neck made from PE-HD<br />

with a movable flange shall be<br />

supplied and <strong>in</strong>stalled <strong>in</strong> the leachate<br />

pipe system accord<strong>in</strong>g to the<br />

manufacturer's guidel<strong>in</strong>es and/or the<br />

Project Manager's <strong>in</strong>structions.<br />

The fitt<strong>in</strong>g shall have an external pipe<br />

diameter <strong>of</strong> 400 mm.<br />

<strong>Al</strong>l other works as expla<strong>in</strong>ed <strong>in</strong> item<br />

no. 10.14.<br />

10.16 Weld<strong>in</strong>g di 250 with movable<br />

flange<br />

A weld<strong>in</strong>g neck made from PE-HD<br />

with a movable flange shall be<br />

supplied and <strong>in</strong>stalled <strong>in</strong> the leachate<br />

pipe system accord<strong>in</strong>g to the<br />

manufacturer's guidel<strong>in</strong>es and/or the<br />

Project Manager's <strong>in</strong>structions.<br />

The fitt<strong>in</strong>g shall have an <strong>in</strong>ternal pipe<br />

diameter <strong>of</strong> 250 mm (l<strong>in</strong>ked to pipes<br />

<strong>of</strong> item no. 10.2).<br />

<strong>Al</strong>l other works as expla<strong>in</strong>ed <strong>in</strong> item<br />

no. 10.14.<br />

piece<br />

piece<br />

2<br />

4


ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 51<br />

Item no. Description Unit Quantity Rate Amount<br />

10.17 Weld<strong>in</strong>g di 350 with movable<br />

flange<br />

A weld<strong>in</strong>g neck made from PE-HD<br />

with a movable flange shall be<br />

supplied and <strong>in</strong>stalled <strong>in</strong> the leachate<br />

pipe system accord<strong>in</strong>g to the<br />

manufacturer's guidel<strong>in</strong>es and/or the<br />

Project Manager's <strong>in</strong>structions.<br />

The fitt<strong>in</strong>g shall have an <strong>in</strong>ternal pipe<br />

diameter <strong>of</strong> 350 mm (l<strong>in</strong>ked to pipes<br />

<strong>of</strong> item no. 10.4).<br />

<strong>Al</strong>l other works as expla<strong>in</strong>ed <strong>in</strong> item piece 1<br />

no. 10.14.<br />

10.18 Bl<strong>in</strong>d Flange, Diameter 315 mm<br />

A bl<strong>in</strong>d flange shall be supplied and<br />

<strong>in</strong>stalled <strong>in</strong> the leachate pipe system.<br />

The flange shall have an external pipe<br />

diameter 315 mm.<br />

The fitt<strong>in</strong>g shall be made <strong>of</strong> glass fiber<br />

re<strong>in</strong>forced PP with steel<br />

re<strong>in</strong>forcement.<br />

<strong>Al</strong>l required works as well as supply<br />

and <strong>in</strong>corporation <strong>of</strong> required<br />

sta<strong>in</strong>less connections and<br />

correspond<strong>in</strong>g seal<strong>in</strong>g materials shall<br />

be <strong>in</strong>cluded <strong>in</strong> the standard price.<br />

10.19 Bl<strong>in</strong>d Flange, Diameter 400 mm<br />

A bl<strong>in</strong>d flange shall be supplied and<br />

<strong>in</strong>stalled <strong>in</strong> the leachate pipe system.<br />

The flange shall have an external pipe<br />

diameter 400 mm.<br />

<strong>Al</strong>l other works as expla<strong>in</strong>ed <strong>in</strong> item<br />

no. 10.18<br />

10.20 Bl<strong>in</strong>d Flange, Diameter 250 mm<br />

A bl<strong>in</strong>d flange shall be supplied and<br />

<strong>in</strong>stalled <strong>in</strong> the leachate pipe system.<br />

The flange shall have an <strong>in</strong>ternal pipe<br />

diameter <strong>of</strong> 250 mm.<br />

<strong>Al</strong>l other works as expla<strong>in</strong>ed <strong>in</strong> item<br />

no. 10.18<br />

piece<br />

piece<br />

piece<br />

4<br />

2<br />

4


ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 52<br />

Item no. Description Unit Quantity Rate Amount<br />

10.21 Bl<strong>in</strong>d Flange, Diameter 350 mm<br />

A bl<strong>in</strong>d flange shall be supplied and<br />

<strong>in</strong>stalled <strong>in</strong> the leachate pipe system.<br />

The flange shall have an <strong>in</strong>ternal pipe<br />

diameter <strong>of</strong> 350 mm.<br />

<strong>Al</strong>l other works as expla<strong>in</strong>ed <strong>in</strong> item<br />

no. 10.18<br />

piece 1<br />

10.22 PE-HD Inspection (revision) box<br />

with seal<br />

An <strong>in</strong>spection box with seal and with<br />

V2A quick release coupl<strong>in</strong>g, fabricated<br />

from PEHD pipes and sheets, shall be<br />

supplied and <strong>in</strong>stalled <strong>in</strong> the leachate<br />

pipe system <strong>in</strong>side manhole 1<br />

accord<strong>in</strong>g to the manufacturer's<br />

guidel<strong>in</strong>es and/or the Project<br />

Manager's <strong>in</strong>structions.<br />

The <strong>in</strong>dividual pipe pieces shall be<br />

connected by means <strong>of</strong> heated tool<br />

butt weld<strong>in</strong>g. <strong>Al</strong>l required works have<br />

to be <strong>in</strong>cluded <strong>in</strong> the standard price.<br />

The external pipe diameter shall be<br />

400 mm, the wall thickness shall be<br />

36.3 mm.<br />

10.23 Impermeability Test, PE-HD Pipes<br />

Impermeability test shall be executed<br />

<strong>in</strong> the ma<strong>in</strong> leachate pipe accord<strong>in</strong>g<br />

to EN 1610 with air and <strong>in</strong>clud<strong>in</strong>g all<br />

required <strong>in</strong>stallations and seals.<br />

The process LD accord<strong>in</strong>g to EN 1610<br />

shall be applied (pressur<strong>in</strong>g with air<br />

and an overpressure <strong>of</strong> 0.2 bar) for PE-<br />

HD pipe with an <strong>in</strong>ternal pipe<br />

diameter <strong>of</strong> 250-400 mm<br />

Piece<br />

sum<br />

1<br />

1


ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 53<br />

Item no. Description Unit Quantity Rate Amount<br />

10.24 PE-HD ventilation<br />

Ventilation pipes made <strong>of</strong> PE-HD shall<br />

be supllied and <strong>in</strong>corporated.<br />

The pipes shall be split <strong>in</strong> two parts.<br />

The standard price <strong>in</strong>cludes all fix<strong>in</strong>g<br />

devices for wall and ro<strong>of</strong> as well as all<br />

necessary seal<strong>in</strong>gs and pipe ducts<br />

(pass<strong>in</strong>g <strong>of</strong> the pipe through the<br />

concrete wall). The external pipe<br />

diameter shall be 200 mm, the wall<br />

thickness shall be 11.4 mm.<br />

The length <strong>of</strong> pipe shall be<br />

approximately 3.0 m. One air dome<br />

(cover <strong>of</strong> the pipes) shall be <strong>in</strong>cluded.<br />

Installation accord<strong>in</strong>g to draw<strong>in</strong>g /<br />

plan. Constructional unit:<br />

<strong>in</strong>spection manhole for ma<strong>in</strong> leachate<br />

pipe and pump station<br />

10.25 PEHD l<strong>in</strong><strong>in</strong>g<br />

A PEHD l<strong>in</strong><strong>in</strong>g shall be supplied and<br />

<strong>in</strong>stalled as a surface cover on the<br />

base and the walls <strong>in</strong> the pump<br />

station and on the outlet structure at<br />

the leachate pond.<br />

The plates shall be made <strong>of</strong> PEHD<br />

with a thickness <strong>of</strong> 5 mm. They shall<br />

be applied to the <strong>in</strong>side <strong>of</strong> the<br />

board<strong>in</strong>g for the concrete. They must<br />

have naps on the <strong>in</strong>ner side so they<br />

can bond well with the concrete.<br />

The standard price shall <strong>in</strong>clude all<br />

necessary equipment and works for<br />

adapt<strong>in</strong>g to the different slopes and<br />

structures <strong>in</strong> the area <strong>in</strong> <strong>in</strong>corporation.<br />

piece<br />

m2<br />

2<br />

50


ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 54<br />

Item no. Description Unit Quantity Rate Amount<br />

10.26 Weld<strong>in</strong>g Neck 400*36.3 with<br />

Movable Flange<br />

A weld<strong>in</strong>g neck made from PE-HD<br />

with a movable flange shall be<br />

supplied and <strong>in</strong>stalled <strong>in</strong> the gas<br />

collection pipe accord<strong>in</strong>g to the<br />

manufacturer's guidel<strong>in</strong>es and/or the<br />

Project Manager's <strong>in</strong>structions.<br />

The fitt<strong>in</strong>g shall have an external pipe<br />

diameter <strong>of</strong> 400 mm.<br />

Facilities for gas collection are<br />

described <strong>in</strong> Chapter 15<br />

<strong>Al</strong>l other works as expla<strong>in</strong>ed <strong>in</strong> item<br />

no. 10.14.<br />

piece<br />

10.27 Bl<strong>in</strong>d Flange, Diameter 400 mm<br />

A bl<strong>in</strong>d flange shall be supplied and<br />

<strong>in</strong>stalled <strong>in</strong> the leachate pipe system.<br />

The flange shall have an external pipe<br />

diameter 400 mm.<br />

The fitt<strong>in</strong>g shall be made <strong>of</strong> glass fiber<br />

re<strong>in</strong>forced PP with steel<br />

re<strong>in</strong>forcement.<br />

<strong>Al</strong>l required works as well as supply<br />

and <strong>in</strong>corporation <strong>of</strong> required<br />

sta<strong>in</strong>less connections and<br />

correspond<strong>in</strong>g seal<strong>in</strong>g materials shall<br />

be <strong>in</strong>cluded <strong>in</strong> the standard price.<br />

Facilities for gas collection are<br />

described <strong>in</strong> Chapter 15<br />

piece 1<br />

Total for <strong>Bill</strong> No. 10<br />

(carried forward to Summary)<br />

1


ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 55<br />

<strong>Bill</strong> No. 11: Concrete Works<br />

Item no. Description Unit Quantity Rate Amount<br />

Instructions For Execution:<br />

1) General<br />

For all structures the necessary<br />

structural analysis and detail draw<strong>in</strong>gs<br />

shall be supplied by the Contractor.<br />

The result<strong>in</strong>g costs shall be <strong>in</strong>cluded<br />

<strong>in</strong> the standard prices.<br />

Check<strong>in</strong>g <strong>of</strong> the compressive strength<br />

and bend<strong>in</strong>g tensile strength shall be<br />

done by an authorized material<br />

test<strong>in</strong>g <strong>in</strong>stitute chosen by the<br />

Contractor. <strong>Al</strong>l required tests are to be<br />

executed accord<strong>in</strong>g to applicable law.<br />

The result<strong>in</strong>g costs are to be part <strong>of</strong><br />

the flat rate.<br />

2) Concrete Works<br />

The concrete shall be supplied and<br />

<strong>in</strong>corporated accord<strong>in</strong>g to EN 206.<br />

The quality shall be m<strong>in</strong>. C 30/37.<br />

The production <strong>of</strong> concrete shall take<br />

<strong>in</strong>to account the exposure classes<br />

XF1, XA3 and XC1 accord<strong>in</strong>g to EN<br />

206.<br />

Structurally connected parts shall be<br />

concreted <strong>in</strong> one stretch without<br />

payment <strong>of</strong> over-time or night work<br />

result<strong>in</strong>g from this. This is also true for<br />

build<strong>in</strong>g components between<br />

expansion and stra<strong>in</strong> jo<strong>in</strong>ts. For<br />

exceptions the Contractor shall<br />

consult with the stress analyst.<br />

The hight <strong>of</strong> the layers <strong>of</strong> concrete<br />

<strong>in</strong>corporation shall be max. 40 cm.<br />

Pour<strong>in</strong>g pipes shall be used when the<br />

pour<strong>in</strong>g height is bigger than 2.0 m


ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 56<br />

Item no. Description Unit Quantity Rate Amount<br />

An even compaction by means <strong>of</strong> an<br />

<strong>in</strong>ternal vibrator is necessary<br />

The concrete shall be protected from<br />

exsiccation. The concrete must be kept<br />

wet for at least 7 days after pour<strong>in</strong>g.<br />

Vibrations <strong>of</strong> the new concrete shall be<br />

avoided.<br />

<strong>Al</strong>l surfaces shall be made <strong>of</strong> fairfaced<br />

concrete except for those concrete<br />

surfaces touched by soil.<br />

Indicated board<strong>in</strong>g for a smooth<br />

surface shall be chosen by the<br />

Contractor (<strong>in</strong> consultation with the<br />

Project<br />

Manager!).<br />

<strong>Al</strong>l visible concrete edges shall be<br />

broken by means <strong>of</strong> a three square or<br />

trapeze ledge. This is also true for all<br />

seams.<br />

A sub-base made <strong>of</strong> non-re<strong>in</strong>forced site<br />

concrete (C 8/10 EN 206) shall be<br />

supplied and <strong>in</strong>corporated under all<br />

concrete structures.<br />

The thickness <strong>of</strong> the subbase shall be:<br />

10 cm.<br />

3) Re<strong>in</strong>forcement Steel<br />

The re<strong>in</strong>forcement steel shall be<br />

supplied accord<strong>in</strong>g to relevant<br />

regulations have to be delivered and<br />

<strong>in</strong>corporated accord<strong>in</strong>g to the<br />

structural requirements.<br />

The re<strong>in</strong>forcement steel shall have a<br />

tensile strength <strong>of</strong> at least 420 N/mm².<br />

It shall be formed with two rows <strong>of</strong> rips<br />

(strips), which are located diagonal and<br />

situated opposite each other.<br />

The supply and <strong>in</strong>corporation <strong>of</strong> all<br />

diameters and lengths as well as the<br />

<strong>in</strong>corporation <strong>in</strong> all constructional units<br />

shall be <strong>in</strong>cluded <strong>in</strong> the standard prices<br />

<strong>of</strong> the structures.


ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 57<br />

Item no. Description Unit Quantity Rate Amount<br />

4) Earthworks<br />

<strong>Al</strong>l necessary earthworks <strong>in</strong>clud<strong>in</strong>g<br />

excavations and fill<strong>in</strong>gs accord<strong>in</strong>g to<br />

the relevant regulations and accord<strong>in</strong>g<br />

to the requirements on site shall be<br />

<strong>in</strong>cluded <strong>in</strong> the standard prices for the<br />

structures. The excavated soil shall<br />

become the property <strong>of</strong> the Contractor<br />

and shall be removed from site and<br />

shall be disposed <strong>of</strong> on expense <strong>of</strong> the<br />

Contractor.<br />

After completion <strong>of</strong> the build<strong>in</strong>gs the<br />

build<strong>in</strong>g pits shall be filled with soil<br />

supplied by the Contractor.<br />

The fill<strong>in</strong>g material shall consist <strong>of</strong><br />

friable soil, coarse-gra<strong>in</strong>ed or mix<br />

gra<strong>in</strong>ed. Is mix gra<strong>in</strong>ed soil supplied, it<br />

shall conta<strong>in</strong> material with a gra<strong>in</strong><br />

diameter smaller than 0.06 mm at a<br />

max. rate <strong>of</strong> 15 % (<strong>of</strong> the weight).<br />

The soil shall be <strong>in</strong>corporated and<br />

compacted layer by layer, each with a<br />

thickness <strong>of</strong> max. 30 cm.<br />

5) Pipe Connections / Pipe Wall Ducts<br />

<strong>Al</strong>l pipe connections and pipe wall<br />

ducts shall be impermeable. It is<br />

recommended to use special r<strong>in</strong>g<br />

seal<strong>in</strong>g systems to guarantee the<br />

impermeability.<br />

11.1 Manhole 1<br />

The complete structure <strong>of</strong> the<br />

manhole 1 shall be built accord<strong>in</strong>g to<br />

the draw<strong>in</strong>gs and the above listed<br />

<strong>in</strong>structions by the Project Manager<br />

and accord<strong>in</strong>g to the f<strong>in</strong>al draw<strong>in</strong>gs<br />

and the structural analysis supplied by<br />

the Contractor.<br />

<strong>Al</strong>l necessary supplies and works<br />

(<strong>in</strong>clud<strong>in</strong>g earthworks, concrete works<br />

with board<strong>in</strong>g and re<strong>in</strong>forcement<br />

steel, fabrication <strong>of</strong> the necessary<br />

recesses and pipe wall ducts) shall be<br />

<strong>in</strong>cluded <strong>in</strong> the standard price.


ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 58<br />

Item no. Description<br />

The follow<strong>in</strong>g item shall also be<br />

<strong>in</strong>cluded <strong>in</strong> the standard price:<br />

Unit Quantity Rate Amount<br />

- Manhole cover, weatherpro<strong>of</strong>,<br />

square <strong>in</strong> shape with dimensions<br />

<strong>of</strong> 1.0 / 1.0 m, completely made <strong>of</strong><br />

sta<strong>in</strong>less steel. The cover shall be<br />

supplied with a self-retract<strong>in</strong>g<br />

lock, sta<strong>in</strong>less steel gas assisted<br />

spr<strong>in</strong>g damper, self engag<strong>in</strong>g door<br />

latch and robust, concealed<br />

h<strong>in</strong>ges. In the centre <strong>of</strong> the cover<br />

shall be an <strong>in</strong>tegrated air vent<br />

made <strong>of</strong> sta<strong>in</strong>less steel. The frame<br />

shall consist <strong>of</strong> a Z-section with a<br />

circumferential totally<br />

weatherpro<strong>of</strong> rubber seal (frostpro<strong>of</strong><br />

and weather-resistant),<br />

designed for <strong>in</strong>corporat<strong>in</strong>g <strong>in</strong><br />

concrete etc. The operat<strong>in</strong>g keys<br />

shall be <strong>in</strong>cluded <strong>in</strong> the standard<br />

price.<br />

Earth<strong>in</strong>g strip made from V2A<br />

sta<strong>in</strong>less steel placed <strong>in</strong> concrete<br />

foundations, foundation slabs<br />

respectively <strong>in</strong> soil trenches to be dug<br />

out.<br />

The cross section shall be<br />

30 x 3.5 mm<br />

piece 1<br />

11.2 Leachate Pump Station<br />

The complete structure <strong>of</strong> the pump<br />

station at the leachate pond shall be<br />

built accord<strong>in</strong>g to the draw<strong>in</strong>gs and<br />

the above listed <strong>in</strong>structions by the<br />

Project Manager and accord<strong>in</strong>g to the<br />

f<strong>in</strong>al draw<strong>in</strong>gs and the structural<br />

analysis supplied by the Contractor.<br />

<strong>Al</strong>l necessary supplies and works<br />

(<strong>in</strong>clud<strong>in</strong>g earthworks, concrete works<br />

with board<strong>in</strong>g and re<strong>in</strong>forcement<br />

steel, fabrication <strong>of</strong> the necessary<br />

recesses and pipe wall ducts) shall be<br />

<strong>in</strong>cluded <strong>in</strong> the standard price.


ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 59<br />

Item no. Description<br />

The follow<strong>in</strong>g item shall also be<br />

<strong>in</strong>cluded <strong>in</strong> the standard price:<br />

Unit Quantity Rate Amount<br />

- Manhole cover, weatherpro<strong>of</strong>,<br />

square <strong>in</strong> shape with dimensions<br />

<strong>of</strong> 1.0 / 1.0 m, completely made <strong>of</strong><br />

sta<strong>in</strong>less steel. The cover shall be<br />

supplied with a self-retract<strong>in</strong>g<br />

lock, sta<strong>in</strong>less steel gas assisted<br />

spr<strong>in</strong>g damper, self engag<strong>in</strong>g door<br />

latch and robust, concealed<br />

h<strong>in</strong>ges. In the centre <strong>of</strong> the cover<br />

shall be an <strong>in</strong>tegrated air vent<br />

made <strong>of</strong> sta<strong>in</strong>less steel. The frame<br />

shall consist <strong>of</strong> a Z-section with a<br />

circumferential totally<br />

weatherpro<strong>of</strong> rubber seal (frostpro<strong>of</strong><br />

and weather-resistant),<br />

designed for <strong>in</strong>corporat<strong>in</strong>g <strong>in</strong><br />

concrete etc. The operat<strong>in</strong>g keys<br />

shall be <strong>in</strong>cluded <strong>in</strong> the standard<br />

price.<br />

Earth<strong>in</strong>g strip made from V2A<br />

sta<strong>in</strong>less steel placed <strong>in</strong> concrete<br />

foundations, foundation slabs<br />

respectively <strong>in</strong> soil trenches to be dug<br />

out. The cross section shall be 30 x 3.5<br />

mm.<br />

piece 1<br />

11.3 Strip Foundations<br />

Re<strong>in</strong>forced concrete C 20/25 (EN 206)<br />

shall be supplied and <strong>in</strong>corporated as<br />

strip foundations for different<br />

constructional units.<br />

The upper concrete surface shall be<br />

horizontal and smoothed.<br />

Necessary board<strong>in</strong>g shall be <strong>in</strong>cluded<br />

<strong>in</strong> the standard price.<br />

<strong>Al</strong>l necessary supplies and works<br />

(<strong>in</strong>clud<strong>in</strong>g earthworks, concrete works<br />

and re<strong>in</strong>forcement steel, fabrication <strong>of</strong><br />

the necessary recesses and pipe wall<br />

ducts) is <strong>in</strong>cluded <strong>in</strong> the standard<br />

price.<br />

m3 5


ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 60<br />

Item no. Description Unit Quantity Rate Amount<br />

11.4 Culvert <strong>in</strong>let structure (Manhole for<br />

surface water)<br />

The complete culvert <strong>in</strong>let structure<br />

shall be built accord<strong>in</strong>g to the<br />

draw<strong>in</strong>gs and the above listed<br />

<strong>in</strong>structions by the Project Manager<br />

and accord<strong>in</strong>g to the f<strong>in</strong>al draw<strong>in</strong>gs<br />

and the structural analysis supplied<br />

by the Contractor.<br />

The manhole cover shall consist <strong>of</strong> a<br />

grat<strong>in</strong>g made <strong>of</strong> galvanized steel.<br />

<strong>Al</strong>l necessary supplies and works<br />

(<strong>in</strong>clud<strong>in</strong>g earthworks, concrete works<br />

with board<strong>in</strong>g and re<strong>in</strong>forcement<br />

steel, fabrication <strong>of</strong> the necessary<br />

recesses and pipe wall ducts) shall be<br />

piece 1<br />

<strong>in</strong>cluded <strong>in</strong> the standard price.<br />

11.5 Slide valve with an <strong>in</strong>ternal<br />

diameter <strong>of</strong> 350 mm<br />

Slide valve (gate valve) for example<br />

made <strong>of</strong> sta<strong>in</strong>less steel (material<br />

1.4571) with an <strong>in</strong>ternal diameter <strong>of</strong><br />

350 mm shall be supplied and<br />

<strong>in</strong>stalled for clos<strong>in</strong>g the ma<strong>in</strong> leachate<br />

pipe <strong>in</strong> the <strong>in</strong>spection manhole 1.<br />

<strong>Al</strong>l <strong>in</strong>stallation works <strong>in</strong>clud<strong>in</strong>g the<br />

necessary fixation <strong>in</strong>side the manhole,<br />

the <strong>in</strong>corporation <strong>in</strong>to the PEHD pipe<br />

with an external diameter <strong>of</strong> 400 mm<br />

through flanged connections, all<br />

seal<strong>in</strong>gs and all necessary equipment<br />

shall be <strong>in</strong>cluded <strong>in</strong> the standard<br />

price.<br />

The regulation <strong>of</strong> the slide valve shall<br />

be done manually from outside the<br />

manhole structure with a suitable<br />

stem extension and the applicable<br />

surface box.<br />

Construction depth from pipe base to<br />

top edge <strong>of</strong> manhole 1: 205 mm.<br />

piece<br />

1


ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 61<br />

Item no. Description Unit Quantity Rate Amount<br />

11.6 Slide valve with an <strong>in</strong>ternal<br />

diameter <strong>of</strong> 250 mm<br />

Slide valve (gate valve) for example<br />

made <strong>of</strong> sta<strong>in</strong>less steel (material<br />

1.4571) with an <strong>in</strong>ternal diameter <strong>of</strong><br />

250 mm shall be supplied and<br />

<strong>in</strong>stalled for clos<strong>in</strong>g the outlet pipe <strong>of</strong><br />

the leachate pond <strong>in</strong> the pump<br />

station.<br />

<strong>Al</strong>l <strong>in</strong>stallation works <strong>in</strong>clud<strong>in</strong>g the<br />

necessary fixation <strong>in</strong>side the manhole<br />

and the <strong>in</strong>corporation <strong>in</strong>to the PEHD<br />

pipe with an external diameter <strong>of</strong> 315<br />

mm through flanged connections, all<br />

seal<strong>in</strong>gs and all necessary equipment<br />

shall be <strong>in</strong>cluded <strong>in</strong> the standard<br />

price.<br />

The regulation <strong>of</strong> the slide valve shall<br />

be done manually from outside the<br />

structure through the manhole cover<br />

with a suitable stem extension, which<br />

shall be fixated to the concrete wall.<br />

Construction depth from pipe base to<br />

the end po<strong>in</strong>t <strong>of</strong> the extension: 220-<br />

230 mm.<br />

piece<br />

1<br />

Total for <strong>Bill</strong> No. 11<br />

(carried forward to Summary)


ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 62<br />

<strong>Bill</strong> No. 12: Leachate Recirculation<br />

Item no. Description<br />

Instructions For Execution:<br />

For the leachate recirculation a<br />

execution design has to be prepared<br />

by the Contractor (see item no. 1:18).<br />

This design has to be prepared with<br />

the real used facilities.<br />

Unit Quantity Rate Amount<br />

12.1 Water pump<br />

Supply and Installation <strong>of</strong> water<br />

pumps <strong>in</strong> work<strong>in</strong>g conditions,<br />

<strong>in</strong>clud<strong>in</strong>g all necessary equipment and<br />

works for <strong>in</strong>stallation and operation.<br />

Two Submersible pumps have to be<br />

delivered and <strong>in</strong>stalled for the recirculation<br />

<strong>of</strong> leachate from the<br />

leachate pond to the <strong>landfill</strong>. One <strong>of</strong><br />

the pumps is redundant <strong>in</strong> case <strong>of</strong><br />

failure.<br />

The submersible pumps should have<br />

the follow<strong>in</strong>g specifications:<br />

Type Submersible pumps (e.g. RITZ<br />

pumps, Schwäbisch Gmünd, Germany<br />

Type U8 100.Z/6+121/37,00/2) to fit <strong>in</strong><br />

exist<strong>in</strong>g manhole (refer detailed<br />

draw<strong>in</strong>g). The pumps should be<br />

equipped with an check valve. The<br />

supply side <strong>of</strong> the pump must be<br />

equipped with a stop valve. Both<br />

pumps must be fitted to be operated<br />

simultaneously for higher flow rates <strong>in</strong><br />

case <strong>of</strong> heavy ra<strong>in</strong>falls.<br />

� Pressure High 70 m by flow rate 100<br />

m³/h<br />

� Electric power max. 50 kW<br />

The contractor has to specify the<br />

suitability <strong>of</strong> the pumps.<br />

The pumps should be delivered and<br />

<strong>in</strong>stalled <strong>in</strong>clud<strong>in</strong>g all fitt<strong>in</strong>gs and<br />

pipes (<strong>in</strong>ternal diameter di 150)<br />

piece 2


ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 63<br />

Item no. Description Unit Quantity Rate Amount<br />

12.2 High pressure pipe, diam. 150 mm<br />

Monobloc pipe made from extruded<br />

PE-HD has to be delivered and has to<br />

be laid out as a high pressure pipe for<br />

the above mentioned pumps. The<br />

<strong>in</strong>dividual pipes have to be connected<br />

by means <strong>of</strong> the heated tool butt<br />

weld<strong>in</strong>g process.<br />

<strong>Al</strong>l required works and services to be<br />

supplied for this process have to be<br />

<strong>in</strong>cluded <strong>in</strong> the standard price. Length<br />

<strong>of</strong> pipe approximately 35 m, three<br />

pipe bends (90 °) have to be <strong>in</strong>cluded<br />

<strong>in</strong> the standard price.<br />

External pipe diameter 180 mm, wall<br />

thickness 16.4 mm. Pipe is suitable for<br />

pressure class SDR 11.<br />

The unit price also <strong>in</strong>cludes all<br />

necessary earthworks (excavations<br />

and fill<strong>in</strong>gs <strong>of</strong> the necessary trenches<br />

<strong>in</strong>clud<strong>in</strong>g the pipe embedment) <strong>in</strong> the<br />

outside slope <strong>of</strong> the <strong>landfill</strong>. The pipe<br />

embedment shall consist <strong>of</strong> soil with a<br />

maximum gra<strong>in</strong> size <strong>of</strong> 8 mm. The<br />

pipe shall be covered at least 20 cm<br />

with embedment material on all sides.<br />

Width <strong>of</strong> the excavation works as<br />

required for <strong>in</strong>corporat<strong>in</strong>g a proper<br />

pipe embedment as described above.<br />

Depth <strong>of</strong> the trench as necessary for a<br />

depth <strong>of</strong> coverage above the pipes <strong>of</strong><br />

at least<br />

50 cm.<br />

The surplus <strong>of</strong> excavated soil or soil<br />

which is unsuitable for fill<strong>in</strong>g<br />

purposes shall become the property<br />

<strong>of</strong> the Contractor and shall be<br />

removed from site and shall be<br />

disposed <strong>of</strong> at the expense <strong>of</strong> the<br />

Contractor.<br />

<strong>Al</strong>l excavation works and all trench<br />

fill<strong>in</strong>gs <strong>in</strong>clud<strong>in</strong>g the pipe<br />

embedment have to be <strong>in</strong>cluded <strong>in</strong><br />

the unit price<br />

m 35


ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 64<br />

Item no. Description Unit Quantity Rate Amount<br />

12.3 Concrete obstruction (base), distribution<br />

platform<br />

Deliver and <strong>in</strong>corporate a concrete<br />

obstruction (base) on a 30 cm gravel<br />

bear<strong>in</strong>g course. Length / width = 1.5 x<br />

1.5 m, 25 cm high,<br />

The base must conta<strong>in</strong> a hole to lead<br />

through the pipe made <strong>of</strong> PEHD with<br />

an external diameter <strong>of</strong> 180 mm with<br />

the necessary r<strong>in</strong>g seal<strong>in</strong>g system.<br />

12.4 Distribution jo<strong>in</strong>t PEHD<br />

Deliver and <strong>in</strong>corporate a distribution<br />

jo<strong>in</strong>t made <strong>of</strong> PEHD or sta<strong>in</strong>less steel.<br />

This connections piece will be placed<br />

between the flexible pipes and the fix<br />

pipe DN 100 PEHD, Distribution jo<strong>in</strong>t<br />

with 1 entrance (pipe with external<br />

diameter <strong>of</strong> 180 mm) and 3 exits<br />

(<strong>in</strong>ternal diameter DN 100) with the<br />

necessary coupl<strong>in</strong>gs for the below<br />

mentioned flexible pipes and slide<br />

valves to shut <strong>of</strong>f the unused pipes.<br />

The standard price <strong>in</strong>cludes material<br />

costs, weld<strong>in</strong>g, connections etc.<br />

12.5 flexible pipes, length 50 m<br />

Deliver flexible pipes (hoses) with a<br />

complete length <strong>of</strong> appr. 50 m per<br />

unit, The hoses have to be delivered<br />

with a coupl<strong>in</strong>g to connect them with<br />

one another respectively with the<br />

below mentioned water distribution<br />

system (wide area spr<strong>in</strong>kler) and the<br />

distribution jo<strong>in</strong>t (item 12.4). The<br />

hoses have to be w<strong>in</strong>ded up on a tray<br />

(drum) for easy transport. Diameter <strong>of</strong><br />

the pipes appr. 100 mm. <strong>Al</strong>l delivered<br />

pieces must be available on the spot,<br />

so replacement pieces can be bought<br />

easily<br />

piece<br />

piece<br />

piece<br />

1<br />

1<br />

3


ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 65<br />

Item no. Description Unit Quantity Rate Amount<br />

12.6 Magnetic - <strong>in</strong>ductive flow meter<br />

MID DN 150<br />

MID has to be delivered and <strong>in</strong>corporated<br />

<strong>in</strong> PE-HD pipes, flow meter<br />

regulated with microprocessor and<br />

supervised, compacted construction<br />

pr<strong>in</strong>cipal <strong>of</strong> measurement accord<strong>in</strong>g to<br />

<strong>in</strong>ductive low <strong>of</strong> Farrady construction:<br />

compact meter, registration <strong>of</strong><br />

measurements together with adapted<br />

equipment for transformation <strong>of</strong><br />

measurements, pipe diameter DN 100,<br />

length <strong>of</strong> construction: accord<strong>in</strong>g to<br />

DVGW, supply for processor: flange<br />

accord<strong>in</strong>g to DIN 2501, <strong>in</strong> steel ST 37.2,<br />

pressure class SDR 11, cas<strong>in</strong>g:<br />

alum<strong>in</strong>ium die-cast<strong>in</strong>g metal, varnished<br />

surfac<strong>in</strong>g with hard rubber electrodes<br />

made <strong>of</strong> sta<strong>in</strong>less steel 1.4571<br />

Temperature <strong>of</strong> leachate: 0 to 50 °C,<br />

protection code: IP 65 range <strong>of</strong><br />

measurement <strong>in</strong> m³/h, accuracy <strong>of</strong><br />

measurement: +/- 0,5 %, dynamic <strong>of</strong><br />

measurement: 1000:1<br />

exit: analogous: 0/4 ... 20 mA, bidirectional<br />

and impulse frequency:<br />

ipen collector, programmable<br />

energy supply: 85 260 V, 50/60 Hz piece 1<br />

12.7 OP-Panel<br />

Supply and <strong>in</strong>stallation <strong>in</strong> work<strong>in</strong>g<br />

conditions <strong>of</strong> a digital operation<br />

equipment (OP-panel) with liquid<br />

crystal (text) display, 4 l<strong>in</strong>es and 20<br />

symbols per l<strong>in</strong>e have to be describeable.<br />

Foil keyboard with 22 system<br />

keys and 8 free function keys that can<br />

be parametered and signed, <strong>of</strong> it 4<br />

keys with LED-display 128 kB FEPROM<br />

user memory<br />

<strong>in</strong>terface: pro data bus DP and RS232<br />

TTY and transmission rate: 1,5<br />

MBit/sec. <strong>in</strong> m<strong>in</strong>imum<br />

protective system: IP 65, item <strong>in</strong>cludes<br />

all accessories<br />

piece 1


ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 66<br />

Item no. Description Unit Quantity Rate Amount<br />

12.8 Central Process<strong>in</strong>g Unit CPU<br />

Supply and <strong>in</strong>stallation <strong>in</strong> work<strong>in</strong>g<br />

conditions <strong>of</strong> a central processor unit<br />

(CPU) with a system (data) bus for<br />

several transfers at the same time and<br />

an additional PROFIBUS-DP-<strong>in</strong>terface,<br />

able for configuration as master or<br />

slave. Work<strong>in</strong>g time: 300 ns for each<br />

b<strong>in</strong>ary <strong>in</strong>struction <strong>in</strong>terface (MPI) for 4<br />

static and 8 dynamic l<strong>in</strong>ks for network<br />

with 16 processor assemblies <strong>in</strong><br />

maximum (rate <strong>of</strong> transition: 187,5<br />

kBit/sec);<br />

The de-central periphery (at the<br />

PROFIBUS) has to be handled like the<br />

central periphery, data storage free <strong>of</strong><br />

ma<strong>in</strong>tenance without battery <strong>of</strong> all<br />

important data (NVRAM);<br />

LED display for show<strong>in</strong>g mistakes <strong>in</strong><br />

hardware, programs, time, periphery,<br />

battery or data bus and for state <strong>of</strong><br />

operation for run, stop etc., the<br />

assembly has to be <strong>of</strong>fered and<br />

delivered for the necessary operation<br />

system and all supplement systems,<br />

<strong>in</strong>clud<strong>in</strong>g all licences.<br />

12.9 Memory Card<br />

Supply and <strong>in</strong>stallation <strong>in</strong> work<strong>in</strong>g<br />

conditions <strong>of</strong> a memory card memory<br />

capacity: 256 kByte, FEPROM<br />

implementation card has to be <strong>in</strong><br />

accordance to the total data storage<br />

<strong>of</strong> the bided CPU;<br />

12.10 Analogues Input Assembly<br />

Supply and <strong>in</strong>stallation <strong>in</strong> work<strong>in</strong>g<br />

conditions <strong>of</strong> an analogous <strong>in</strong>put<br />

assembly; 8 analogous <strong>in</strong>puts (4 by<br />

resistance measur<strong>in</strong>g) with potential<br />

division between the channels and<br />

an <strong>in</strong>put/output system (data) bus;<br />

piece<br />

piece<br />

piece<br />

1<br />

1<br />

1


ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 67<br />

Item no. Description Unit Quantity Rate Amount<br />

12.11 Analogues Output Assembly<br />

Supply and <strong>in</strong>stallation <strong>in</strong> work<strong>in</strong>g<br />

conditions <strong>of</strong> an analogous output<br />

assembly; 4 analogous outputs with<br />

potential division between the<br />

channels, a voltage supply and a<br />

<strong>in</strong>put/output system (data) bus<br />

ranges <strong>of</strong> outputs have to be able for<br />

regulation for each channe<br />

12.12 Vibration Limit Circuit<br />

Supply and <strong>in</strong>stallation <strong>in</strong> work<strong>in</strong>g<br />

conditions <strong>of</strong> a vibration limit circuit<br />

for liquids,<br />

resistance aga<strong>in</strong>st leachate <strong>of</strong> a<br />

<strong>landfill</strong> us<strong>in</strong>g as protection for<br />

runn<strong>in</strong>g without liquid construction<br />

with lengthened pipe with pressured<br />

encased cas<strong>in</strong>g, item <strong>in</strong>cludes all<br />

necessary accessories<br />

12.13 Water Pilot<br />

Supply and <strong>in</strong>stallation <strong>in</strong> work<strong>in</strong>g<br />

conditions <strong>of</strong> a hydrostatic water<br />

pilot for permanent measur<strong>in</strong>g <strong>of</strong><br />

fill<strong>in</strong>g level <strong>in</strong>side a shaft<br />

for regulation <strong>of</strong> the limited fill<strong>in</strong>g<br />

levels and for <strong>in</strong>tegration to the<br />

different automatic systems,<br />

construction with lengthened pipe<br />

(up to 3 m) and thread or flange item<br />

<strong>in</strong>cludes all necessary accessories<br />

piece<br />

piece<br />

piece<br />

1<br />

1<br />

1


ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 68<br />

Item<br />

no.<br />

Description Unit Quantity Rate Amount<br />

12.14 Outside Switch Board<br />

Supply and <strong>in</strong>stallation <strong>in</strong> work<strong>in</strong>g<br />

conditions <strong>of</strong> a detached outside distributor<br />

for SPS-registration, <strong>in</strong>clud<strong>in</strong>g all<br />

safeties protection code: IP 65, cas<strong>in</strong>g<br />

made <strong>of</strong> strengthened fibreglass<br />

<strong>in</strong>clud<strong>in</strong>g lock, thermo-static airconditioned<br />

with sufficient air change,<br />

<strong>in</strong>clud<strong>in</strong>g lightn<strong>in</strong>g for switchboard,<br />

door switch, socket (system schuko) and<br />

bag for plans, <strong>in</strong>clud<strong>in</strong>g necessary base<br />

made <strong>of</strong> prefabricated concrete and<br />

<strong>in</strong>sert <strong>of</strong> cables (from bottom), <strong>in</strong>clud<strong>in</strong>g<br />

<strong>in</strong>stallation <strong>of</strong> the described SPSassembly,<br />

safeties and all other<br />

equipment, <strong>in</strong>clud<strong>in</strong>g <strong>in</strong>stallation <strong>of</strong> a<br />

chang<strong>in</strong>g operation <strong>of</strong> the leachate<br />

pumps (each 50 kW)<br />

piece 1<br />

12.15 Pressure Gauge<br />

Supply and <strong>in</strong>stallation <strong>in</strong> work<strong>in</strong>g<br />

conditions <strong>of</strong> a pressure gauge (manometer)<br />

with spr<strong>in</strong>g (feather), bayonet<br />

socket made <strong>of</strong> sta<strong>in</strong>less steel,<br />

connection with G ½´´, <strong>in</strong>dication <strong>of</strong><br />

measurement DN 100 mm,<br />

measurement range 0 - 16 bar and three<br />

step tap DN 25, on both sides female<br />

thread R ½´´ with control flanges<br />

piece 2<br />

12.16 Connection <strong>of</strong> all Equipment to<br />

Control and Monitor<strong>in</strong>g Central<br />

<strong>Al</strong>l equipment (pumps, slide valves, MID,<br />

water pilot, vibration limit circuit,<br />

pressure gage etc.) have to be<br />

connected via cable to the control and<br />

monitor<strong>in</strong>g central; <strong>in</strong> this item all<br />

connections <strong>of</strong> cables to the appropriate<br />

equipment have to be <strong>of</strong>fered; therefore<br />

from each equipment an appropriate<br />

cable with a length <strong>of</strong> about 30 m has to<br />

be calculated, distribution switchboard<br />

will be located nearby the pump station;<br />

<strong>in</strong>clud<strong>in</strong>g lay<strong>in</strong>g <strong>of</strong> all requested cables<br />

piece<br />

1


ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 69<br />

Item no. Description Unit Quantity Rate Amount<br />

12.17 Program<strong>in</strong>g and Implementation <strong>of</strong><br />

Control and Monitor<strong>in</strong>g Central<br />

programm<strong>in</strong>g and implementation <strong>of</strong><br />

total control and regulation central<br />

(for pumps, slide valves and all other<br />

necessary equipment) has to be done;<br />

def<strong>in</strong>ition <strong>of</strong> parameter, <strong>in</strong>troduction<br />

<strong>of</strong> <strong>landfill</strong> staff and eventually<br />

necessary changes <strong>of</strong> parameters<br />

dur<strong>in</strong>g a period <strong>of</strong> time <strong>of</strong> 6 month<br />

after start<strong>in</strong>g up (test<strong>in</strong>g phase)<br />

documentation <strong>in</strong>cludes all work<strong>in</strong>g<br />

draw<strong>in</strong>gs, construction plans,<br />

diagrams, operat<strong>in</strong>g <strong>in</strong>structions and<br />

all additional documents (on CD-Rom<br />

piece 1<br />

and hard copy, <strong>in</strong> triplicate)<br />

12.18 Test and Commission<strong>in</strong>g <strong>of</strong> total<br />

Recirculation System<br />

Leachate Recirculation System has to<br />

be cleaned after construction tested.<br />

The commission<strong>in</strong>g phase has to<br />

<strong>in</strong>clude all necessary tests to prove<br />

functionality <strong>of</strong> the system.<br />

piece<br />

1<br />

Total for <strong>Bill</strong> No. 12<br />

(carried forward to Summary)


ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 70<br />

<strong>Bill</strong> No. 13: Surface Water Collection<br />

Item no. Description Unit Quantity Rate Amount<br />

13.1 Dra<strong>in</strong>age ditch, earthworks<br />

A dra<strong>in</strong>age ditch or trench along the<br />

outer side <strong>of</strong> the <strong>landfill</strong> r<strong>in</strong>g road has<br />

to be produced (north-western area<br />

<strong>of</strong> cell ST). The separated material has<br />

to be loaded, transported to a storage<br />

place <strong>of</strong> the Contractor.<br />

The width <strong>of</strong> the ditch is<br />

approximately 2.0 m, the bottom<br />

width is 1.0 m, the average depth is<br />

0.5 m. The produc<strong>in</strong>g has to be done<br />

<strong>in</strong> sections <strong>of</strong> different length.<br />

13.2 Excavation for trapezoidal ditch<br />

Excavation respectively earthworks<br />

for the trapezoidal ditch has to be<br />

done.<br />

The average depth <strong>of</strong> excavation is up<br />

to 0.6 m, the width is 1.2 to 1.5 m.<br />

<strong>Al</strong>l other works <strong>in</strong> 13.1.,<br />

The payment has to be calculated<br />

accord<strong>in</strong>g to the length <strong>of</strong> the chute,<br />

regardless <strong>of</strong> width. The length will be<br />

measured along the axis <strong>of</strong> the<br />

trapezoidal chute.<br />

13.3 Trapezoidal ditch, 30 cm high<br />

A trapezoidal ditch made <strong>of</strong> prefabricated<br />

concrete units has to be<br />

delivered and placed <strong>in</strong> the specified<br />

slope on a 20 cm gravel bear<strong>in</strong>g<br />

course. In the area <strong>of</strong> the <strong>in</strong>cl<strong>in</strong>ed side<br />

walls a gravel bear<strong>in</strong>g course has to<br />

be done also. The jo<strong>in</strong>ts have to be<br />

closed tight with cement mortar. The<br />

trapezoidal chute has to be<br />

constructed with clear dimensions <strong>of</strong>:<br />

- width on top: 1.00 m<br />

- width <strong>in</strong> bottom area: 0.40 m<br />

- tap (depth): 0.30 m<br />

The <strong>in</strong>corporation has to be done<br />

along the <strong>landfill</strong> r<strong>in</strong>g road for surface<br />

water discharge<br />

m<br />

m<br />

m<br />

150<br />

650<br />

650


ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 71<br />

Item no. Description Unit Quantity Rate Amount<br />

13.4 Natural stone pav<strong>in</strong>g around<br />

culverts etc.<br />

Natural stones (granite or lime quarry<br />

stone) have to be delivered and<br />

placed as paved area on slopes, <strong>in</strong><br />

hollows and ditches, or as an<br />

enclosure <strong>of</strong> constructional units or<br />

culverts at erratically distances. The<br />

pav<strong>in</strong>g has to be done true to pr<strong>of</strong>ile<br />

and level on thick bedd<strong>in</strong>g made <strong>of</strong><br />

concrete, thickness 15 cm, and with<br />

jo<strong>in</strong>ts with a width <strong>of</strong> 5 cm <strong>in</strong><br />

maximum. Natural cleft quarry stones<br />

<strong>of</strong> largely cubical shape and with<br />

edge lengths between 10 cm and 30<br />

cm have to be used.<br />

Jo<strong>in</strong>ts have to be filled with a mixture<br />

made <strong>of</strong> sand and cement.<br />

<strong>Al</strong>l works <strong>in</strong>cluded<br />

13.5 Stones for hydraulic structures for<br />

erosion protection<br />

Granite stones with an edge length<br />

from 30 cm to 50 cm have to be<br />

delivered and <strong>in</strong>corporated as an<br />

erosion protection <strong>in</strong> the outlet area<br />

<strong>of</strong> culverts made <strong>of</strong> site concrete (as<br />

rubble layer).<br />

Jo<strong>in</strong>ts have to be filled with b<strong>in</strong>d<strong>in</strong>g<br />

soil taken from the job-site.<br />

Payment accord<strong>in</strong>g to supply notes.<br />

m2<br />

tons<br />

25<br />

10


ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 72<br />

Item no. Description Unit Quantity Rate Amount<br />

13.6 Re<strong>in</strong>forced concrete pipes with an<br />

<strong>in</strong>ternal diameter 800 mm<br />

Re<strong>in</strong>forced concrete pipes with a<br />

circular cross section, with a bell and<br />

spigot jo<strong>in</strong>t ("bell" sleeve) and an<br />

<strong>in</strong>ternal diameter <strong>of</strong> 800 mm have to<br />

be delivered and <strong>in</strong>corporated as a<br />

(dra<strong>in</strong>age) culvert underneath along<br />

the <strong>landfill</strong> r<strong>in</strong>g road. The concrete<br />

cover <strong>of</strong> re<strong>in</strong>forcement has to be<br />

m<strong>in</strong>imum 30 mm on the <strong>in</strong>side and<br />

outside. The pipe connections have to<br />

be done with a seal<strong>in</strong>g r<strong>in</strong>g <strong>of</strong><br />

elastomer plastic which is<br />

<strong>in</strong>corporated <strong>in</strong> the sleeve by the<br />

manufacturer. The pipe support shall<br />

be made <strong>of</strong> concrete C 12/15 EN 206-<br />

1 with a support<strong>in</strong>g angle <strong>of</strong> 120<br />

degrees, thickness <strong>of</strong> the pipe support<br />

m<strong>in</strong>imum 15 cm.<br />

The pipes shall be laid <strong>in</strong> a trench. The<br />

pipe embedment shall consist <strong>of</strong><br />

coarse-gra<strong>in</strong>ed soil with a maximum<br />

gra<strong>in</strong> size <strong>of</strong> 32 mm. The pipe shall be<br />

covered at least 20 cm with<br />

embedment material on all sides.<br />

The rema<strong>in</strong><strong>in</strong>g trench fill<strong>in</strong>g shall<br />

consist <strong>of</strong> coarse-gra<strong>in</strong>ed soil with a<br />

maximum gra<strong>in</strong> size <strong>of</strong> 63 mm.<br />

Width and depth <strong>of</strong> the excavation<br />

works as required for <strong>in</strong>corporat<strong>in</strong>g<br />

the pipes under trench conditions.<br />

The surplus <strong>of</strong> excavated soil or soil<br />

which is unsuitable for fill<strong>in</strong>g<br />

purposes shall become the property<br />

<strong>of</strong> the Contractor and shall be<br />

removed from site and shall be<br />

disposed <strong>of</strong> at the expense <strong>of</strong> the<br />

Contractor.<br />

<strong>Al</strong>l excavation works and all trench<br />

fill<strong>in</strong>gs <strong>in</strong>clud<strong>in</strong>g the pipe<br />

embedment have to be <strong>in</strong>cluded <strong>in</strong><br />

the unit price.<br />

m 40


ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 73<br />

Item no. Description Unit Quantity Rate Amount<br />

13.7 Re<strong>in</strong>forced concrete pipes with an<br />

<strong>in</strong>ternal diameter 300 mm<br />

A re<strong>in</strong>forced concrete pipe with a<br />

circular cross section and an <strong>in</strong>ternal<br />

diameter <strong>of</strong> 300 mm shall to be<br />

delivered and <strong>in</strong>corporated as an <strong>in</strong>let<br />

system for the <strong>in</strong>let structure <strong>of</strong> the<br />

culvert underneath the r<strong>in</strong>g road<br />

accord<strong>in</strong>g to the respective detail<br />

plan<br />

The concrete cover <strong>of</strong> re<strong>in</strong>forcement<br />

has to be m<strong>in</strong>imum 30 mm on the<br />

<strong>in</strong>side and outside.<br />

The length <strong>of</strong> the pipe piece shall be<br />

about 2 meters. The pipe shall be<br />

without a jo<strong>in</strong>t.<br />

The pipe support shall be made <strong>of</strong><br />

concrete C 12/15 EN 206-1, thickness<br />

<strong>of</strong> the pipe support m<strong>in</strong>imum 15 cm.<br />

The price for the pipe support shall be<br />

<strong>in</strong>cluded <strong>in</strong> the unit price.<br />

13.8 Quarry stones for protection <strong>of</strong><br />

slope area leachate pond<br />

Quarry stones have to be delivered<br />

and <strong>in</strong>corporated as a protection <strong>in</strong><br />

the slope area <strong>of</strong> the leachate pond.<br />

Slope 1:2<br />

Height <strong>of</strong> the stones 8 to 10 cm, edge<br />

length from 25 to 30 cm, square form.<br />

The stones have to be as uniform as<br />

possible.<br />

piece<br />

s<br />

m2<br />

2<br />

4,000<br />

Total for <strong>Bill</strong> No. 13<br />

(carried forward to Summary)


ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 74<br />

<strong>Bill</strong> No. 14: Gas Collection<br />

Item no. Description Unit Quantity Rate Amount<br />

14.1 Perforated PE-HD pipe (external<br />

pipe diameter: 180 mm), SDR 11<br />

Perforated PE-HD pipe has to be<br />

delivered and stored protected<br />

aga<strong>in</strong>st weather conditions accord<strong>in</strong>g<br />

to the Project Manager’s<br />

specifications.<br />

PE-HD pipe with an external pipe<br />

diameter <strong>of</strong> 180 mm, suitable for<br />

pressure class SDR 11.<br />

Pipe perforated across the whole<br />

circumference, slot width: 10 mm,<br />

pipe length: about 4.0 m.<br />

Each pipe has to be provided with an<br />

adequate cover (welded, <strong>of</strong> HDPE).<br />

Pipe will be used as filter pipe for gas<br />

piece 90<br />

collection.<br />

14.2 Steel pipe DN 800<br />

Pipe made <strong>of</strong> steel with an <strong>in</strong>ternal<br />

diameter <strong>of</strong> 800 mm and a wall<br />

thickness <strong>of</strong> 8 mm <strong>in</strong> m<strong>in</strong>imum has to<br />

be delivered and stored protected<br />

aga<strong>in</strong>st weather conditions accord<strong>in</strong>g<br />

to the Project Manager’s<br />

specifications.<br />

Pipe has to be made <strong>of</strong> galvanized<br />

steel and <strong>in</strong>clud<strong>in</strong>g a gas-tight cover<br />

(with screwed connection and<br />

seal<strong>in</strong>g, see detail plan gas collection).<br />

A connection piece for pipes with an<br />

<strong>in</strong>ternal diameter <strong>of</strong> 80 mm has to be<br />

provided at the steel pipe.<br />

Pipe overall length: 4.0 m.<br />

Lugs (eyelets accord<strong>in</strong>g to detail plan)<br />

have to be welded at the top <strong>of</strong> the<br />

steel pipe for pull<strong>in</strong>g.<br />

Pipe will be used as protection pipe<br />

for the gas filter pipe and as pull pipe<br />

for lengthen<strong>in</strong>g the gas filter pipe<br />

(accord<strong>in</strong>g to the height <strong>of</strong> the waste).<br />

piece<br />

18


ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 75<br />

Item no. Description Unit Quantit<br />

y<br />

14.3 PE-HD EL pipes with an external<br />

diameter <strong>of</strong> 90 mm<br />

Monobloc (non perforated) pipes<br />

made <strong>of</strong> extruded PE-HD have to be<br />

delivered and stored protected<br />

aga<strong>in</strong>st weather conditions accord<strong>in</strong>g<br />

to the Project Manager’s<br />

specifications.<br />

The pipes have to be delivered <strong>in</strong><br />

bundles.<br />

Pipe with an external pipe diameter <strong>of</strong><br />

90 mm, wall thickness 5.1 mm, pipe<br />

suitable for pressure class SDR 17,6.<br />

The pipes have to be electrically<br />

conductive (EL). Surface resistivity


ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 76<br />

Item no. Description Unit Quantit<br />

y<br />

14.6 Support<strong>in</strong>g cone <strong>of</strong> crushed stone<br />

(32/56 mm)<br />

A support<strong>in</strong>g cone (see detail plan gas<br />

collection) for a pull pipe made <strong>of</strong><br />

steel has to be made for every gas<br />

vent. The material must be <strong>of</strong> limefree<br />

crushed stone <strong>of</strong> 32/56 mm gra<strong>in</strong><br />

size.<br />

The material has to be delivered,<br />

<strong>in</strong>corporated compacted accord<strong>in</strong>g to<br />

the Project Manager’s specifications.<br />

Fill<strong>in</strong>g height approximately 1.0 m,<br />

floor space approximately 5.0 x 5.0 m,<br />

Incl<strong>in</strong>ation <strong>of</strong> slope 1:1.5.<br />

piece 18<br />

14.7 PEHD Monobloc Pipe 400*36.3 mm<br />

A monobloc pipe made from<br />

extruded PE-HD shall be supplied and<br />

<strong>in</strong>corporated as a gas collection pipe<br />

accord<strong>in</strong>g to the manufacturer's<br />

guidel<strong>in</strong>es and/or the <strong>in</strong>structions <strong>of</strong><br />

the Project Manager.<br />

The external pipe diameter shall be<br />

400 mm, the wall thickness 36.3 mm<br />

and suitable for pressure class SDR 11.<br />

<strong>Al</strong>l other works as expla<strong>in</strong>ed <strong>in</strong> item<br />

no. 10.2.<br />

The unit price also <strong>in</strong>cludes all<br />

necessary earthworks (excavations<br />

and fill<strong>in</strong>gs <strong>of</strong> the necessary trenches<br />

<strong>in</strong>clud<strong>in</strong>g the pipe embedment) <strong>in</strong> the<br />

area between the r<strong>in</strong>g road and the<br />

<strong>landfill</strong>. The pipe embedment shall<br />

consist <strong>of</strong> soil with a maximum gra<strong>in</strong><br />

size <strong>of</strong> 8 mm. The pipe shall be<br />

covered at least 20 cm with<br />

embedment material on all sides.<br />

Width <strong>of</strong> the excavation works as<br />

required for <strong>in</strong>corporat<strong>in</strong>g a proper<br />

pipe embedment as described above.<br />

Depth <strong>of</strong> the trench as necessary for a<br />

depth <strong>of</strong> coverage above the pipes <strong>of</strong><br />

at least 50 cm.<br />

Rate Amount


ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 77<br />

Item no. Description<br />

The surplus <strong>of</strong> excavated soil or soil<br />

which is unsuitable for fill<strong>in</strong>g<br />

purposes shall become the property<br />

<strong>of</strong> the Contractor and shall be<br />

removed from site and shall be<br />

disposed <strong>of</strong> at the expense <strong>of</strong> the<br />

Contractor.<br />

<strong>Al</strong>l excavation works and all trench<br />

Unit Quantit<br />

y<br />

Rate Amount<br />

fill<strong>in</strong>gs <strong>in</strong>clud<strong>in</strong>g the pipe<br />

embedment have to be <strong>in</strong>cluded <strong>in</strong><br />

the unit price.<br />

m 150<br />

14.8 T-Piece PE-HD, external diameter<br />

400/400, SDR 11<br />

A t-piece with made from <strong>in</strong>jectionmoulded<br />

PE-HD shall be supplied and<br />

<strong>in</strong>stalled <strong>in</strong> the gas collection pipe<br />

accord<strong>in</strong>g to the manufacturer's<br />

guidel<strong>in</strong>es and/or the Project<br />

Manager's <strong>in</strong>structions.<br />

The external pipe diameter shall be<br />

315 mm, the wall thickness shall be<br />

36.3 mm on all sides.<br />

<strong>Al</strong>l other works as expla<strong>in</strong>ed <strong>in</strong> item<br />

no. 10.4 resp. 10.1<br />

piece 1<br />

Total for <strong>Bill</strong> No. 14<br />

(carried forward to Summary)


ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 78<br />

<strong>Bill</strong> No. 15: Special Equipment<br />

Item no. Description Unit Quantity Rate Amount<br />

15.1 Truck weighbridge<br />

Ma<strong>in</strong>tenance-free flush-mounted electro<br />

mechanic truck weighbridge with deep<br />

foundation. Designed for mount<strong>in</strong>g <strong>in</strong> a<br />

prefabricated foundation.<br />

Consist<strong>in</strong>g <strong>of</strong>:<br />

foundation<br />

- 4 compressive load balance cells NL<br />

35t made <strong>of</strong> sta<strong>in</strong>less steel, C4 quality<br />

- <strong>in</strong>sulation panel for the foundation<br />

- 1 term<strong>in</strong>al box IP 54<br />

- 8 bumpers for limitation <strong>of</strong> vibrations<br />

- 4 gap transitions for shock free<br />

pass<strong>in</strong>g over the weigh bridge<br />

- 1 central traversable vestibule<br />

open<strong>in</strong>g<br />

- 1 circumferential edge protection<br />

guard 60/60/8 mm<br />

precast concrete component bridge<br />

- bridge size 20 x 3 m<br />

- accessible from all directions<br />

- prefabricated concrete foundation<br />

approx. 20 x 3 m<br />

specifications:<br />

- maximum load: 60 tons<br />

- measur<strong>in</strong>g range: 0,2 to 30 tons<br />

- scale <strong>in</strong>terval: 0,01 tons<br />

- measur<strong>in</strong>g range: 30 to 60 tons<br />

- scale <strong>in</strong>terval: 0,02 tons<br />

- bridge size: 20 x 3 m<br />

The price <strong>in</strong>cludes all freight costs, all<br />

necessary equipment and works for<br />

<strong>in</strong>stallation <strong>of</strong> the weigh bridge and the<br />

foundation.<br />

<strong>Al</strong>so all wir<strong>in</strong>g and concrete works are<br />

<strong>in</strong>cluded as well as the acceptance test,<br />

statics and calibration.<br />

Foundation <strong>of</strong> weighbridge accord<strong>in</strong>g to<br />

item no. 11.3<br />

such as Pfister (Augsburg) "Classic"<br />

model or similar<br />

piece 1


ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 79<br />

Item no. Description Unit Quantity Rate Amount<br />

15.2 Control system for truck<br />

weighbridge<br />

Supply and <strong>in</strong>stallation <strong>of</strong> the technical<br />

equipment for the truck weighbridge.<br />

Consist<strong>in</strong>g <strong>of</strong>:<br />

Digital weigh<strong>in</strong>g term<strong>in</strong>al<br />

Commercially verifiable to precision<br />

class III, CE-tested, PTB-approved,<br />

verifiable upgradeable MPP data<br />

memory, impact-resistant ABS plastic<br />

hous<strong>in</strong>g, CE-approval, EMC-tested to<br />

EN 45501, radiance-pro<strong>of</strong> up to 10<br />

V/m, protection class IP 20, protection<br />

class front IP 65, analogue and digital<br />

load cells may be connected<br />

user languages: English, German,<br />

French, Italian, Spanish, Portuguese<br />

Weigh<strong>in</strong>g: Gross / Tare / Net<br />

4 possible operat<strong>in</strong>g modes: standard,<br />

sum,<br />

additive weigh<strong>in</strong>g,<br />

subtractive weigh<strong>in</strong>g<br />

Technical features<br />

- 6 operation-dependent s<strong>of</strong>t<br />

keys<br />

(several menu levels)<br />

- background-illum<strong>in</strong>ated LCD<br />

display, 135 x 32 mm<br />

- weight display 16 or 32 mm<br />

digit height selectable<br />

- ma<strong>in</strong>s connection 85 - 265 V<br />

AC, 50/60 Hz, 40 W, stra<strong>in</strong><br />

gauge load cell connection<br />

with 6-phase system, 12 load<br />

cells, 350 Ohms each<br />

- operat<strong>in</strong>g temperature: -10°C<br />

to + 40°C<br />

- storage temperature: -<br />

20°C to + 70 °C<br />

- relative humidity: max. 85%,<br />

non-condens<strong>in</strong>g<br />

- date / time <strong>of</strong> day: <strong>in</strong>tegrated,<br />

battery-buffered clock chip


ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 80<br />

Item no. Description Unit Quantity Rate Amount<br />

Data <strong>in</strong>terfaces<br />

- 1 serial <strong>in</strong>terface EIA RS 232<br />

- 1 serial <strong>in</strong>terface configurable<br />

EIA RS 232/422/485<br />

- 1 analogue output 0-10V/ 4–<br />

20mA, alternatively 0–20mA<br />

- 2 <strong>in</strong>puts opto-decoupled; 24 V<br />

DC, low active<br />

- 2 outputs potential-free relais<br />

contact, max 110V AC DC, 200<br />

mA, e.g. configurable for traffic<br />

lights or barrier control<br />

such as Pfister (Augsburg) "DWT 400"<br />

Pr<strong>in</strong>ter for digital weigh<strong>in</strong>g term<strong>in</strong>al<br />

Accord<strong>in</strong>g to the requirements <strong>of</strong> the<br />

customer and to be connected to the<br />

digital weigh<strong>in</strong>g term<strong>in</strong>al <strong>in</strong>clud<strong>in</strong>g all<br />

necessary cables.<br />

The price <strong>in</strong>cludes:<br />

- ready to use <strong>in</strong>stallation and<br />

calibration<br />

- <strong>in</strong>itiation and brief<strong>in</strong>g <strong>of</strong> the<br />

operat<strong>in</strong>g personal<br />

- production <strong>of</strong> an <strong>in</strong>struction<br />

manual <strong>in</strong>clud<strong>in</strong>g the<br />

construction, specifications,<br />

ma<strong>in</strong>tenance and possible<br />

technical failures.<br />

piece<br />

1


ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 81<br />

Item no. Description Unit Quantity Rate Amount<br />

15.3 Wheel Clean<strong>in</strong>g Unit<br />

Supply and <strong>in</strong>stallation <strong>of</strong> all required<br />

equipment for the truck wheel<br />

clean<strong>in</strong>g unit.<br />

The wheel clean<strong>in</strong>g unit has to be<br />

<strong>in</strong>stalled as a drive through bath that<br />

requires no power.<br />

Consist<strong>in</strong>g <strong>of</strong>:<br />

- 10 m long bath section<br />

- Width <strong>of</strong> bath section: 3.5 m<br />

- Height <strong>of</strong> bath section: about 52<br />

cm<br />

- Bath made as a steel construction<br />

- Bath section equipped with<br />

angled steel grids on <strong>in</strong>ternal<br />

sections<br />

- Removable <strong>in</strong>ternal grid sections<br />

for clean<strong>in</strong>g<br />

In addition:<br />

- Supply and <strong>in</strong>stallation <strong>of</strong> a 7,000<br />

litre header tank<br />

The price <strong>in</strong>cludes all freight costs, all<br />

necessary equipment and works for<br />

<strong>in</strong>stallation <strong>of</strong> the wheel clean<strong>in</strong>g unit<br />

and its foundation.<br />

Pr<strong>in</strong>ciple foundation <strong>of</strong> unit accord<strong>in</strong>g<br />

to item no. 14.6<br />

such as Wheel wash (Chesire UK)<br />

Drive Through Bath model or similar<br />

piece 1<br />

Total for <strong>Bill</strong> No. 15<br />

(carried forward to Summary)


ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 82<br />

<strong>Bill</strong> No. 16: Electrical Works<br />

Item no. Description<br />

A)Ma<strong>in</strong> Distribution board (MDB):<br />

Supply, <strong>in</strong>stall and commission ma<strong>in</strong><br />

and control panel board, the panel<br />

made <strong>of</strong> galvanized steel sheet 2mm<br />

thick, pa<strong>in</strong>ted with anti-rust primer<br />

pa<strong>in</strong>t and 2<br />

coats <strong>of</strong> f<strong>in</strong>al polyester pa<strong>in</strong>t with<br />

colour RAL …. As required by the<br />

eng<strong>in</strong>eer. The panel should be factory<br />

assembled c/w pvc coated cu bus<br />

bars <strong>of</strong> adequate sizes and all other<br />

accessories that may needed to<br />

complete the job and hand over <strong>in</strong><br />

operable conditions trenches, power<br />

and control wires, term<strong>in</strong>als bus bars<br />

neutral bus bar, earth<strong>in</strong>g bus bar<br />

ducts, supports, labels and numbers<br />

and all necessary accessories to<br />

complete<br />

the work as per draw<strong>in</strong>g and eng<strong>in</strong>eer<br />

Instruction.<br />

The panel sizes should be 210 cm<br />

height, 50 cm depth while the width<br />

to be determ<strong>in</strong>ed after shop draw<strong>in</strong>gs<br />

and<br />

that all <strong>in</strong>ternal components were<br />

agreed upon.<br />

the panel shall <strong>in</strong>clude but not<br />

limited to the follow<strong>in</strong>gs:<br />

Unit Quantity Rate Amount<br />

16.1 Three phase ma<strong>in</strong> circuit breaker<br />

MCCB LTL 300A with<br />

over load protection and door handle<br />

No 1<br />

Moeller made or equivalent<br />

16.2 Over load current limit<strong>in</strong>g switch with<br />

O.L and short<br />

circuit release, adjustable 4-6A<br />

Moeller made or equivalent<br />

No 4


ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 83<br />

Item no. Description Unit Quantit<br />

y<br />

16.3 Signal <strong>in</strong>dication lamp R S T with<br />

resistance 220V,Two LTL switch 2x32A<br />

Set 2<br />

16.4 Current Transformer 3(300/5A) Set 4<br />

16.5 Three phase Kwh and KVAR meters 5A Set 1<br />

16.6 S<strong>in</strong>gle phase Kwh meter 5A No 3<br />

16.7 Measur<strong>in</strong>g devices ammeters 0-500A,<br />

voltmeter 0-500V <strong>in</strong>dicat<strong>in</strong>g lamps,<br />

electrical siren, panel light selector<br />

switch, herz meter mcb or fuses<br />

protection.<br />

Set 1<br />

16.8 Three phase surge arrestor protection<br />

50KA at the <strong>in</strong>com<strong>in</strong>g feeder to<br />

protect the system aga<strong>in</strong>st lightn<strong>in</strong>g<br />

No 1<br />

strikes<br />

ground.<br />

<strong>in</strong>clud<strong>in</strong>g connection to<br />

16.9 Automatic Transfer Switch (ATS) 3<br />

phase, motorized type made <strong>of</strong> two<br />

identical switches 4 poles each,<br />

400v, 4000A rat<strong>in</strong>g c/w mechanical<br />

and electrically <strong>in</strong>terlock and <strong>in</strong>clude<br />

also the ACU control unit<br />

Moeller made or equivalent<br />

Set 1<br />

16.10 Power factor correction unit 70KVAR<br />

c/w 6stages control unit, three phase<br />

Set 1<br />

contactors AC3 category with<br />

16.11<br />

auxiliary contacts, mcb or fuses <strong>of</strong><br />

proper rat<strong>in</strong>g<br />

three poles static capacitors with<br />

resistances, toggle<br />

switches I-0-II and signal lamps and all<br />

necessary acc. for function<strong>in</strong>g<br />

Moeller made or equivalent<br />

Panel`s ventilation and anti-humidity<br />

units<br />

Set 1<br />

16.12 Front panel emergency Knock <strong>of</strong>f stop<br />

button with fuses<br />

Set 1<br />

16.13 Three phases NZMB1 40A with o.l. No.<br />

protection for MDB.B<br />

1<br />

16.14 1-phase 40A NZMB1 for DBSOCIAL No.<br />

Moller made or equivalent.<br />

1<br />

Rate Amount


ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 84<br />

Item no. Description Unit Quantity Rate Amount<br />

16.15 Three phase NZMN1 80A for No. 1<br />

16.16<br />

DBWORKSHOP Moller made<br />

or equivalent.<br />

Three phase NZMN4 200A for MDB<br />

Recirculation PUMP Moller made<br />

or equivalent.<br />

No. 1<br />

16.17 1phase MCCB 40A for DB control Moller<br />

made or equivalent.<br />

No. 1<br />

16.18 Three phase MCCB 3x40A with o.l<br />

protection for other load<br />

No. 1<br />

16.19 Three phase mcb 3x16/25A, Isc= 10KA @<br />

400V<br />

No. 1<br />

16.20 Ditto, but( 1x16)and( 1x32A) No. 4<br />

16.21 Three phase MCB 3x20A for external<br />

light<strong>in</strong>g.<br />

No. 1<br />

16.22 Adjustable under volt relay. No. 1<br />

16.23 Manual change over switch 4x400A with<br />

external panel handle Type SOCOMEC or<br />

substantially equivalent.<br />

B) DB RECIRCULATION:<br />

No. 1<br />

16.24 Supply and <strong>in</strong>stall complete electrical<br />

control panel (3x150 Amp) suitable for<br />

operation one submersible pump rated<br />

power <strong>of</strong> 50KW for recirculation use.<br />

Other two DB(rated 5KW) one for<br />

leachate while the other<br />

for surface water pump. The panel<br />

should provide the required protection<br />

with all associated power and<br />

control circuits as per the follow<strong>in</strong>g<br />

specification<br />

<strong>in</strong>structions:<br />

and the eng<strong>in</strong>eer<br />

Hot dip galvanized steel panel board<br />

enclosure with<br />

electrostatic pa<strong>in</strong>ts thickness not less<br />

than 2mm and<br />

30% spare space <strong>in</strong>clud<strong>in</strong>g the follow<strong>in</strong>g:<br />

One motor ma<strong>in</strong> breaker 3x125A type<br />

NZMN2-125A.<br />

Three phase solid state reduce voltage<br />

for motor control digital microprocessor<br />

with its control as per standard<br />

manufacturer recommendation. S<strong>of</strong>t<br />

starter No. 1


ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 85<br />

RVS-DN 105 Type Solcon or substantially<br />

equivalent<br />

with bypass contactors type DILMM125<br />

with auxiliary<br />

contacts 2N.C, 2N.O or substantially<br />

equivalent.<br />

Instrumentation and measur<strong>in</strong>g devices<br />

,voltmeter with 7step switch, ampere<br />

meters, Hz meter, current meters,<br />

electrical siren, and panel light<strong>in</strong>g.<br />

Lightn<strong>in</strong>g protection circuit with light<strong>in</strong>g<br />

protection de-<br />

vice SPB-12/280/4 Moller type with<br />

protection fuse holder and fuses and<br />

wir<strong>in</strong>g as per manufacture<br />

recommendation.<br />

Front panel emergency Knock <strong>of</strong>f stop<br />

button with<br />

fuses.<br />

Control circuits with isolat<strong>in</strong>g<br />

transformer 380/220-24v<br />

1000VA and <strong>in</strong>put output protections,<br />

adjustable under<br />

volt relays, timers relays, pumps control<br />

protection units (M<strong>in</strong>i Cas),high pressure<br />

control circuit, NVRs micro -switches<br />

control circuit, four position( 0-1-2-3)<br />

control switches,3phase H,O,A switches,<br />

pushbuttons,<br />

circuit breakers fuses with holders,(the<br />

red marked items are to be provided on<br />

shop draw<strong>in</strong>g),cool<strong>in</strong>g fans, and<br />

panel heater with its control circuits.<br />

signal <strong>in</strong>dication lamp R.S.T with LTL and<br />

push button<br />

current transformers 3(150/5A).<br />

2(3X20A) MCCB for DB Leachate and DB<br />

surface water pump<br />

(1X16 FAZ-C16/1) as spare.<br />

The break<strong>in</strong>g capacity <strong>of</strong> the breakers<br />

shall be as m<strong>in</strong>imum 50 KA @ 400 V.<br />

<strong>Al</strong>l necessary power and control wires.<br />

term<strong>in</strong>als, bus-bars, ducts, support labels<br />

and numbers ..etc as per eng<strong>in</strong>eer’<br />

<strong>in</strong>struction<br />

power factor correction unit 40KVAR c/w<br />

6stages control unit, three phase


ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 86<br />

contactors AC3 category with auxiliary<br />

contacts, mcb or fuses <strong>of</strong> proper rat<strong>in</strong>g<br />

three poles static<br />

capacitors with resistances, toggle<br />

switches 1-0-11 and<br />

signal lamps and all necessary acc. For<br />

function<strong>in</strong>g Moeller made or equivalent.<br />

16.25 Supply and <strong>in</strong>stall electrical float switch<br />

<strong>in</strong>side the treated wastewater wet well,<br />

IP 68 with N.O and N.C 10A contacts,<br />

supply voltage 24 V mercury bulb switch<br />

type is FLYGT or substantially equivalent,<br />

the price <strong>in</strong>cludes pedestal mounted<br />

weather pro<strong>of</strong> junction box outside the<br />

wet well, all float switches should be<br />

protected by 8 " UPVC pipe fixed to the<br />

wet pit wall with sta<strong>in</strong>less steel<br />

connectors and supports, brackets and<br />

all required C.B, cables, conduits, ducts,<br />

cable glands, excavation and back fill<strong>in</strong>g<br />

to connect the float switch to the ma<strong>in</strong><br />

control panel as per the eng<strong>in</strong>eer<br />

<strong>in</strong>structions.<br />

16.26 Supply and <strong>in</strong>stall micro-switches IP 65<br />

with N.O and N.C 10A contacts type is<br />

Moeller or substantially equivalent,<br />

connected to NRVs on the check valves<br />

the price <strong>in</strong>cludes all required C.B, cables,<br />

conduits, ducts, excavation and back<br />

fill<strong>in</strong>g to connect the micro-switch to<br />

the ma<strong>in</strong> control panel as per the<br />

eng<strong>in</strong>eer <strong>in</strong>structions.<br />

16.27 Supply and <strong>in</strong>stall pressure switch on the<br />

ma<strong>in</strong> header, the switch shall be<br />

adjustable (0-10 bars) danfoss type RT<br />

model or substantially equivalent , price<br />

<strong>in</strong>cludes all required C.B, cables,<br />

conduits, ducts, excavation and back<br />

fill<strong>in</strong>g to connect the switch to the ma<strong>in</strong><br />

control panel as per the eng<strong>in</strong>eer<br />

<strong>in</strong>structions.<br />

NO. 2<br />

NO. 1<br />

NO. 1


ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 87<br />

Item no. Description Unit Quantity Rate Amount<br />

16.28 Supply and <strong>in</strong>stall power and data<br />

cables from the control panel to the<br />

flow meter and between the flow<br />

meter transmitter and transducer, size<br />

and specifications <strong>of</strong> the cables as per<br />

the flow meter manufacturer, the<br />

work <strong>in</strong>cludes 1*16A electronic<br />

protection socket from over voltage<br />

and Lightn<strong>in</strong>g with time delay and to<br />

complete the work as per the<br />

eng<strong>in</strong>eer <strong>in</strong>structions.<br />

NO. 1<br />

16.29 Supply and <strong>in</strong>stall and connect local<br />

disconnect switch 3*120A lockable<br />

type is Moeller sc rat<strong>in</strong>g 50KA to be<br />

<strong>in</strong>stalled close to the wet well <strong>in</strong>side<br />

water pro<strong>of</strong> panel, <strong>in</strong>clud<strong>in</strong>g<br />

emergency stop with rotat<strong>in</strong>g release<br />

Moeller type, the price <strong>in</strong>cludes<br />

power (4*35mm2 CU/XLPE) and<br />

control cables (6*1,5mm2CU/XLPE),<br />

cable glands, cable term<strong>in</strong>als, conduit,<br />

ducts, concrete works to <strong>in</strong>stall and<br />

protect the disconnect switch panel,<br />

excavation and backfill<strong>in</strong>g to connect<br />

the disconnect switch to the ma<strong>in</strong><br />

control panel as per the eng<strong>in</strong>eer<br />

<strong>in</strong>structions.<br />

NO. 1<br />

16.30 Supply and <strong>in</strong>stall earthl<strong>in</strong>g system Item 1<br />

<strong>in</strong>cludes, electrical manhole,<br />

electrodes, connectors, 50mm2<br />

copper wire from the electrodes to<br />

the control panel, test<strong>in</strong>g resistant<br />

must be not more than 2 (ohm).<br />

C) CABLES required for MDB<br />

/LS<br />

16.31 XLPE cable 3x185+150mm2 . L.m 300<br />

16.32 Ditto, but 5x10 mm2 . L.m 70<br />

16.33 Ditto, but 5x6 mm2 . L.m 30<br />

16.34 Ditto, but 3x4 mm2 L.m 50<br />

16.35 Ditto. But cable 3x2.5mm2<br />

D) CABLES required for MDB<br />

L.m 30<br />

16.36 XLPE cable 5x95mm2 . L.m 350<br />

16.37 Ditto, but 5x6 mm2(For leachate and<br />

surface water)<br />

L.m 100<br />

16.38 Ditto. But cable 3x2.5mm2 (For L.m 200


ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 88<br />

control).<br />

E) Standby Diesel Generator:<br />

16.39 Supply, <strong>in</strong>stall and commission heavy<br />

duty <strong>in</strong>dustrial type diesel generator<br />

set 250KVA, three phase, 0.8PF,<br />

1500Rpm, 400Volts, 50Hz <strong>in</strong>clud<strong>in</strong>g<br />

electronic governor digital control<br />

panel, daily fuel tank for 8 hrs<br />

operation all necessary protection<br />

facilities with orig<strong>in</strong>al made<br />

sound attenuator canopy <strong>of</strong> sound<br />

level


ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 89<br />

mounted on the ceil<strong>in</strong>g, with all acc.<br />

Needed type is Gaash or equal<br />

approved.<br />

16.44 1x60W Circular Glop Water pro<strong>of</strong><br />

ceil<strong>in</strong>g mounted with clear cover, and<br />

all accessories needed, type is Gaash,<br />

or equal approved.<br />

No. 1<br />

16.45 1x60W Wall mounted Glop,IP54,with<br />

polycarbonate cover Steel protection<br />

grill, and all accessories needed, type<br />

is<br />

No. 1<br />

Eleita Cat. No.20161 or equal<br />

approved.<br />

16.46 One gang-One way 220V-16A No. 1<br />

16.47<br />

ON/OFF.SP Switch, Type is Gewiss or<br />

equal approved.<br />

Two gangs, One way, sp switch, type<br />

is Gewiss or equal approved.(w.p)<br />

No. 1<br />

16.48 Ditto, but Water approved. No. 1<br />

16.49 Supply and <strong>in</strong>stall 4" dim. Wall No. 1<br />

mounted Etraction fan, With<br />

protection louver type is VENTA the<br />

work <strong>in</strong>cl.0.75' conduit.3x1.5mm2<br />

16.50<br />

NYA wires and all accessories needed<br />

as per draw<strong>in</strong>g and engr. Instruction.<br />

3-p<strong>in</strong>, 16A-220V socket outlet, type is<br />

Gewiss or equal approved.<br />

No. 3<br />

16.51 Ditto but Water pro<strong>of</strong>. No. 2<br />

16.52 Telephone socket outlet <strong>in</strong>cl. wires No.<br />

and all accessories pvc boxes….etc<br />

Type is Gewiss or equivalent.<br />

1<br />

16.53 sub distribution board for guard and<br />

control room<br />

Road light<strong>in</strong>g<br />

No. 1<br />

16.54 Galvanized steel pole with<br />

2arms,nob,basefixed to the ground<br />

with concrete basment,<strong>in</strong>cl.3"flixeble<br />

conduits cables, Manholes,<br />

excavat<strong>in</strong>g and s<strong>of</strong>t backfill<strong>in</strong>g,<br />

wir<strong>in</strong>g, MCB, Photocell kaja, CB and all<br />

accessories,12m height etc all work<br />

accord<strong>in</strong>g engr. Instruction<br />

No. 3<br />

16.55 250W street light projector With No. 6


ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 90<br />

3x4mm2 xlpe cable,IP-65 junction<br />

boxes, clmn, CB, and all accessories&<br />

Connection needed. type is Gaash .<br />

light<strong>in</strong>g for conta<strong>in</strong>er and concrete<br />

room.<br />

16.56 Supply and <strong>in</strong>stall fluorescent light<strong>in</strong>g<br />

fixture 2x36w with f<strong>in</strong>e polyester<br />

diffuser for surface mount<strong>in</strong>g, type is<br />

CA’ASH, SHATIEL or equivalent, the<br />

work <strong>in</strong>cludes all accessories needed .<br />

16.57 Supply<strong>in</strong>g and <strong>in</strong>stall<strong>in</strong>g round bulk<br />

head light, water pro<strong>of</strong> (ceil<strong>in</strong>g or wall<br />

mounted) with 18w PL lamps., type is<br />

CA’ASH, SHATIEL or equivalent, the<br />

work <strong>in</strong>cludes all accessories needed .<br />

No. 4<br />

No. 2<br />

16.58 "Supply and <strong>in</strong>stall one way switch No.<br />

<strong>in</strong>clud<strong>in</strong>g all accessories, cover with<br />

all requirements (btic<strong>in</strong>o type ) with<br />

pipes ( over false ceil<strong>in</strong>g fire resistance<br />

2<br />

pipes) ,cables NYY 3*1.5mm2<br />

16.59<br />

accord<strong>in</strong>g eng<strong>in</strong>eer<strong>in</strong>g <strong>in</strong>struction if<br />

needed , boxes cover…….etc . The<br />

work shall <strong>in</strong>clude remove an old<br />

exist<strong>in</strong>g pipes and boxes……….etc<br />

and <strong>in</strong>stall new network + repair the<br />

damages.<br />

Ditto , but double pole switches . No. 2<br />

16.60 Supply ,<strong>in</strong>stall extract fan 6” with No. 2<br />

movable shutter with all accessories<br />

16.61 "Supply and <strong>in</strong>stall s<strong>in</strong>gle socket<br />

outlet-16A <strong>in</strong>clud<strong>in</strong>g all accessories,<br />

cover with all requirements (btic<strong>in</strong>o<br />

type) with pipes (over false ceil<strong>in</strong>g fire<br />

resistance pipes), cables NYY<br />

3*2.5mm2 accord<strong>in</strong>g eng<strong>in</strong>eer<strong>in</strong>g<br />

<strong>in</strong>struction if needed, boxes<br />

cover…….etc. The work shall <strong>in</strong>clude<br />

remove an old exist<strong>in</strong>g pipes and<br />

boxes……….etc and <strong>in</strong>stall new<br />

network + repair the damages.<br />

16.62 Supply<strong>in</strong>g and <strong>in</strong>stall<strong>in</strong>g electrical<br />

ceil<strong>in</strong>g fan 220V\125W, with its wires,<br />

conduits, switch, connections…..etc.<br />

Type is CHMC or approved equivalent.<br />

No 4<br />

No. 4<br />

16.63 Ground<strong>in</strong>g arrangements for MDB L.s 1


ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 91<br />

made <strong>of</strong> 70mm2 bare copper<br />

conductor buried directly to the soil<br />

at 80cm depth and connected to<br />

copper rods 19mm dia, 3m long<br />

driven<br />

<strong>in</strong>to ground at convenient distances<br />

and connected to the E-bar <strong>in</strong><br />

Distribution<br />

should not<br />

board, the resistance<br />

be more than 2 ohms, all exposed<br />

metallic parts to be<br />

bonded to the system with proper<br />

means. Type: Furse or equivalent<br />

Follow up all requirement and pay<br />

fees cost required by GEDCO to<br />

obta<strong>in</strong> permit <strong>of</strong> supply<strong>in</strong>g 3x300<br />

L.s 1<br />

Amp. <strong>in</strong>cl. theprice <strong>of</strong> shared<br />

transformer if necessary and all the<br />

work<br />

accord<strong>in</strong>g GEDCO requirement.(The<br />

price relies on Gedco conditions)<br />

Total for <strong>Bill</strong> No. 16<br />

(carried forward to Summary)


ITB 2012-424: <strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong> 92<br />

UXOs and Solid Waste Management<br />

PAL 10-71646<br />

<strong>Rehabilitation</strong> and Expansion <strong>of</strong> <strong>Johr</strong> <strong>Al</strong> <strong>Dik</strong> dump site <strong>in</strong> <strong>Gaza</strong><br />

Summary:<br />

Item Description Total (US$)<br />

1. Total <strong>of</strong> <strong>Bill</strong> No. 1/ General items, general services Included <strong>in</strong> Unit Price<br />

2. Total <strong>of</strong> <strong>Bill</strong> No. 2/ Field Investigations Included <strong>in</strong> Unit Price<br />

3. Total <strong>of</strong> <strong>Bill</strong> No. 3 /Test Field Included <strong>in</strong> Unit Price<br />

4. Total <strong>of</strong> <strong>Bill</strong> No. 4 /Site Clearance Included <strong>in</strong> Unit Price<br />

5. Total <strong>of</strong> <strong>Bill</strong> No. 5 /Excavations<br />

6. Total <strong>of</strong> <strong>Bill</strong> No. 6 /Bentonite Mat<br />

7. Total <strong>of</strong> <strong>Bill</strong> No. 7 /Geo-membrane<br />

8. Total <strong>of</strong> <strong>Bill</strong> No. 8 /Geotextile<br />

9. Total <strong>of</strong> <strong>Bill</strong> No. 9 /Dra<strong>in</strong>age Layer<br />

10. Total <strong>of</strong> <strong>Bill</strong> No. 10 /PE-HD Works<br />

11. Total <strong>of</strong> <strong>Bill</strong> No. 11/ Concrete Works<br />

12. Total <strong>of</strong> <strong>Bill</strong> No. 12/ Leachate Recirculation<br />

13. Total <strong>of</strong> <strong>Bill</strong> No. 13 /Surface Water Collection<br />

14. Total <strong>of</strong> <strong>Bill</strong> No. 14/ Gas Collection<br />

15. Total <strong>of</strong> <strong>Bill</strong> No. 15/ Special Equipment<br />

16. Total <strong>of</strong> <strong>Bill</strong> No. 16 /Electrical Works<br />

Grand Total (US$) – Not <strong>in</strong>clud<strong>in</strong>g Value Added Tax<br />

(VAT)<br />

Grand Total (<strong>in</strong> letters):-------------------------------------------------------------<br />

Contractor’s Name:------------------------------------------------------------------<br />

Signature and Stamp:----------------------------------------------------------------<br />

Date:-------------------------------------------------------------------------------------