STAKEHOLDER ANALYSIS<br />

3.5. Outl<strong>in</strong>e assumptions and risks<br />

We can still go one step further <strong>in</strong> the analysis if we determ<strong>in</strong>e the potential<br />

risks <strong>in</strong>volved if key stakeholders’ expectations were not met.<br />

To cont<strong>in</strong>ue with this stage of the analysis, the work team must go back to<br />

Table 4 and add a new concept under the head<strong>in</strong>g ‘Assumptions and Risks’.<br />

This new concept is <strong>in</strong>cluded <strong>in</strong> the follow<strong>in</strong>g Table, which shows only the<br />

aspects or measures that backers of the project must take on board <strong>in</strong> order to<br />

m<strong>in</strong>imize any possible risks caused by dissatisfied stakeholders. As the project<br />

has still not reached the implementation stage, it would be speculative to<br />

venture what these risks might be, as stakeholders’ <strong>in</strong>itial reactions are<br />

unknown. As a result, this section rema<strong>in</strong>s unf<strong>in</strong>ished, <strong>for</strong> the time be<strong>in</strong>g at<br />

least.<br />

Table 5. Classification of importance-<strong>in</strong>fluence with assumption of risk to<br />

the Gulf of Cadix Offshore W<strong>in</strong>d Farm Project.<br />

KEY<br />

STAKEHOLDER<br />

Barbate<br />

Fishermen’s<br />

Guild<br />

Conil<br />

Fishermen’s<br />

Guild<br />

Barbate Tuna<br />

Fishers<br />

Conil Tuna<br />

Fishers<br />

Zahara de los<br />

Atunes Tuna<br />

Fishers<br />

OPP- 51 Tuna<br />

Products Org.<br />

Barbate<br />

Shipowners’<br />

Assoc.<br />

Conil<br />

Shipowners’<br />

Assoc.<br />

Barbate Town<br />

Council<br />

Conil Town<br />

Council<br />

Estimated<br />

Project<br />

Impact<br />

H<br />

H<br />

H<br />

H<br />

H<br />

H<br />

H<br />

H<br />

H<br />

Estimated<br />

priority<br />

Assumptions and risks<br />

1 Obta<strong>in</strong> impact studies that verify<br />

unfavourable impact of project on<br />

resources.<br />

1 Obta<strong>in</strong> impact studies that verify<br />

unfavourable impact of project on<br />

resources.<br />

1 Obta<strong>in</strong> impact studies that verify<br />

unfavourable impact of project on blue<br />

f<strong>in</strong> tuna migration routes.<br />

1 Obta<strong>in</strong> impact studies that verify<br />

unfavourable impact of project on blue<br />

f<strong>in</strong> tuna migration routes.<br />

H 1 Obta<strong>in</strong> impact studies that verify<br />

unfavourable impact of project on blue<br />

f<strong>in</strong> tuna migration routes.<br />

H Obta<strong>in</strong> impact studies that verify<br />

unfavourable impact of project on<br />

H<br />

H<br />

resources.<br />

1 Obta<strong>in</strong> impact studies that verify<br />

unfavourable impact of project on<br />

resources, shipp<strong>in</strong>g and safety.<br />

H 1 Obta<strong>in</strong> impact studies that verify<br />

unfavourable impact of project on<br />

resources, shipp<strong>in</strong>g and safety.<br />

M 2 Obta<strong>in</strong> impact studies that verify<br />

unfavourable impact of project on<br />

resources, shipp<strong>in</strong>g and safety and<br />

impact on landscape.<br />

M 2 Obta<strong>in</strong> impact studies that verify<br />

unfavourable impact of project on<br />

resources, shipp<strong>in</strong>g and safety and<br />

impact on landscape.<br />