26.02.2013 Views

Appendix A - Washington State Department of Ecology

Appendix A - Washington State Department of Ecology

Appendix A - Washington State Department of Ecology

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

AUTHORITY: 42 U.S.C. 7401 et seq.<br />

Dated:<br />

Regional Administrator, Region IX<br />

Title 40, chapter I <strong>of</strong> the Code <strong>of</strong> Federal Regulations is<br />

proposed to be amended as follows:<br />

PART 49--[AMENDED]<br />

follows:<br />

1. The authority citation for part 49 continues to read as<br />

Authority: 42 U.S.C. 7401, et seq.<br />

2. Part 49 is proposed to be amended by revising Section<br />

49.23 to read as follows:<br />

Section 49.23 Federal Implementation Plan Provisions for Four<br />

Corners Power Plant, Navajo Nation<br />

h. Regional Haze Best Available Retr<strong>of</strong>it Technology limits<br />

for this plant are in addition to the requirements above. All<br />

definitions and testing and monitoring methods <strong>of</strong> this rule<br />

apply to these limits except as indicated below. Within 180<br />

days <strong>of</strong> the effective date <strong>of</strong> this regulation, the owner or<br />

operator shall submit a plan to the Regional Administrator that<br />

69<br />

K - 394<br />

Final December 2010

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!