L<strong>on</strong>d<strong>on</strong> Borough of Islingt<strong>on</strong> - <strong>Homes</strong> <strong>for</strong> Islingt<strong>on</strong> (ALMO) p 23<br />

112 One example of this was where residents were c<strong>on</strong>cerned about the quality of<br />

capital works. As a result HFI is introducing a brochure <strong>for</strong> residents explaining<br />

the role of the Clerk of Works and what sort of quality of work they will accept.<br />

This document was in draft at the time the inspecti<strong>on</strong>. HFI is also working <strong>on</strong> the<br />

development of a protocol between c<strong>on</strong>structors and themselves to ensure a joint<br />

approach to quality c<strong>on</strong>trol.<br />

113 There are effective methods in place to manage the capital c<strong>on</strong>tracts.<br />

Pre-c<strong>on</strong>tract meetings are held where all early arrangements are discussed.<br />

Thereafter there are m<strong>on</strong>thly site meeting chaired and minuted by a client officer.<br />

A review is held a m<strong>on</strong>th be<strong>for</strong>e practical completi<strong>on</strong> and there is a <strong>for</strong>mal<br />

handover meeting when per<strong>for</strong>mance indicator data is collated to assess<br />

per<strong>for</strong>mance.<br />

114 Capital projects are routinely and effectively reviewed. Each project is reviewed<br />

<strong>on</strong> a regular basis. Valuati<strong>on</strong>s are prepared by a quantity surveyor <strong>on</strong> a m<strong>on</strong>thly<br />

basis and supported by a job cost <str<strong>on</strong>g>report</str<strong>on</strong>g>. There are meetings every six weeks<br />

with group staff and the whole programme is called over with the investment<br />

team every six weeks to fit in with the project review programme. There is also a<br />

review after completi<strong>on</strong> of the project and a final check <strong>on</strong> asbestos data to<br />

ensure all tasks have been completed.<br />

115 Officers have recently commenced work <strong>on</strong> a project to compare the costs of the<br />

framework c<strong>on</strong>tract to costs that they would have incurred under a traditi<strong>on</strong>al<br />

c<strong>on</strong>tract. They will use this in<strong>for</strong>mati<strong>on</strong> as a means of establishing value <strong>for</strong><br />

m<strong>on</strong>ey in the future by comparing the costs of different c<strong>on</strong>tractors, and<br />

comparing their overall costs to other authorities. Officers acknowledge that this<br />

is an issue they need to take <strong>for</strong>ward but as yet it is too so<strong>on</strong> to judge their<br />

overall comparative costs and the outcomes of the project.<br />

116 There is effective management of HFI's resp<strong>on</strong>sibilities under the CDM 6<br />

regulati<strong>on</strong>s. There are procedures in place and HFI has introduced a number of<br />

checks and balances in the preparati<strong>on</strong> of health and safety plans.<br />

117 Despite a robust m<strong>on</strong>itoring regime, officers anticipate that there will be slippage<br />

<strong>on</strong> schemes this year. This is largely because of the delayed start to the<br />

framework c<strong>on</strong>tracts and the fact that they introduced a new way of delivering<br />

schemes and a new c<strong>on</strong>tract appraisal process. There have been issues with<br />

planning and individual leaseholders that have impacted <strong>on</strong> the delivery of the<br />

programme but there is no clear pattern emerging <strong>on</strong> the reas<strong>on</strong>s <strong>for</strong> slippage.<br />

118 There is limited resident involvement in the development of capital schemes. As<br />

yet, residents do not play a major role in the choice of c<strong>on</strong>tractor, or in the timing<br />

and design of the schemes. Officers accept that this is something they need to<br />

deal with in the future and a <str<strong>on</strong>g>report</str<strong>on</strong>g> has been presented to the board outlining the<br />

opti<strong>on</strong>s <strong>for</strong> resident involvement in the 2006/07 schemes.<br />

119 As a result of our last inspecti<strong>on</strong> HFI introduced a c<strong>on</strong>structi<strong>on</strong> site safety audit<br />

system that was piloted earlier this year and <strong>for</strong>mally launched in October 2004.<br />

This system aligns the checks carried out by the clerk of works and the health<br />

and safety officers. HFI developed this audit tool based <strong>on</strong> research with a<br />

number of their c<strong>on</strong>tractors, including the Health and Safety Executive.<br />

6 C<strong>on</strong>structi<strong>on</strong> (Design and Management) regulati<strong>on</strong>s 1994 - The CDM Regulati<strong>on</strong>s are aimed at improving the<br />

overall management and co-ordinati<strong>on</strong> of health, safety and welfare throughout all stages of a c<strong>on</strong>structi<strong>on</strong> project<br />

to reduce the large number of serious and fatal accidents and cases of ill health which happen every year in the<br />

c<strong>on</strong>structi<strong>on</strong> industry.