Schriftenreihe .;technologiekompetenz Verkehr in
Schriftenreihe .;technologiekompetenz Verkehr in
Schriftenreihe .;technologiekompetenz Verkehr in
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
EU-PROJECTS<br />
The European Union supports research and development on hybrid and electric<br />
vehicles through its R&D Framework Programmes. Follow<strong>in</strong>g strong <strong>in</strong>terest <strong>in</strong> these<br />
technologies <strong>in</strong> the 1980s and 1990s, their economic failure <strong>in</strong> the market due to<br />
limited user acceptance was a sober<strong>in</strong>g experience for the <strong>in</strong>dustry. This disillusion led<br />
to a reduction <strong>in</strong> R&D activities by European <strong>in</strong>dustry and research <strong>in</strong>stitutions at the<br />
beg<strong>in</strong>n<strong>in</strong>g of this decade. As a consequence, only two projects with Austrian partners<br />
look<strong>in</strong>g at these topics have been realised under EU Framework Programme 6.<br />
Improved battery technologies, and sophisticated energy and power management<br />
us<strong>in</strong>g improved control electronics, have paved the way for the economic success of<br />
hybrid vehicles <strong>in</strong> recent years. This has led to a sharp <strong>in</strong>crease <strong>in</strong> R&D efforts and<br />
<strong>in</strong>dustrial <strong>in</strong>vestment <strong>in</strong> electric and hybrid vehicle technologies. With the launch of the<br />
EU Framework Programme 7, the electric drivetra<strong>in</strong> has become a far greater focus of<br />
<strong>in</strong>terest and of R&D activities.<br />
Nevertheless, the European Commission decided to wait for the results from the<br />
projects runn<strong>in</strong>g under Framework Programme 6 before open<strong>in</strong>g the call <strong>in</strong> Framework<br />
Programme 7 (FP 7) for new hybrid and electric vehicle projects. Accord<strong>in</strong>gly, these<br />
areas were not <strong>in</strong>cluded <strong>in</strong> the first FP 7 call for proposals, but were open for<br />
submissions under the second FP 7 call. Several Austrian research <strong>in</strong>stitutions with<br />
electric and hybrid vehicle projects participated <strong>in</strong> this second FP 7 call. As the<br />
evaluation of this call was not concluded before this brochure went to press (end of<br />
September 2008), the follow<strong>in</strong>g pages present projects from the preced<strong>in</strong>g Framework<br />
Programme 6.<br />
Fig.: AVL List GmbH<br />
59