integrated watershed management programme – v - tawdeva
integrated watershed management programme – v - tawdeva
integrated watershed management programme – v - tawdeva
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
NERIGAM WATERSHED DETAILED PROJECT REPORT<br />
Format <strong>–</strong>9<br />
Size of the Land Holdings in the Watershed<br />
Less then one Ha. Between 1-2 Ha.<br />
Above 2 Ha.<br />
Sl.<br />
No<br />
Name of the<br />
Revenue Village<br />
Nos.<br />
Total Ha.<br />
Nos.<br />
Total Ha.<br />
Nos.<br />
1 2 3 4 5 6 7 8 9 10 11 12 13 14<br />
1 Nerigam<br />
a SC / ST 21 3.50<br />
b Others 39 15.40 252 38.30 7 9.40 20 25.8 3 8.70 8 18.635<br />
2 Gollapalli<br />
c SC / ST 16 2.50<br />
d Others 19 9.70 137 20.90 4 5.40 9 11.60 1 3.80 4 10.02<br />
3 Karisanthiram<br />
e SC / ST<br />
f Others 12 6.31 178 26.70 2 3.10 12 15.4 1 2.89 3 9.06<br />
SC/ST (a+c+e) 37 6<br />
Others (b+d+f) 70 31.41 567 85.90 13.00 17.90 41.00 52.80 5.00 15.39 15.00 37.72<br />
TOTAL<br />
70 31.41 604 91.90 13 17.90 41 52.80 5.00 15.39 15 37.72<br />
KRISHNAGIRI DISTRICT<br />
Source : House hold survey and Revenue Department<br />
Irrigated Rainfed Irrigated Rainfed<br />
Total Ha.<br />
Nos.<br />
Total Ha.<br />
Irrigated Rainfed<br />
Nos.<br />
Total Ha.<br />
Nos.<br />
Total Ha.