513 196/2 Nerigam Kirishnappa Field Bunding 1 Ha 3000 3.140 9420.00 3.140<br />

514 197/1 Nerigam Vradhappa Field Bunding 1 Ha 3000 1.840 5520.00 1.840<br />

515 197/2 Nerigam Mallappa naidu Field Bunding 1 Ha 3000 1.080 3240.00 1.080<br />

516 198/1 Nerigam Munikhan Field Bunding 1 Ha 3000 1.430 4290.00 1.430<br />

517 198/2 Nerigam Bedhappa nadu Field Bunding 1 Ha 3000 0.730 2190.00 0.730<br />

518 198/3 Nerigam Kamala kondappa Field Bunding 1 Ha 3000 0.760 2280.00 0.760<br />

519 198/4 Nerigam Ramaiya Field Bunding 1 Ha 3000 0.480 1440.00 0.480<br />

Total<br />

2.STONE WALL<br />

Sl.No SF No Location Name of the Farmer Proposed type of treatment Unit<br />

505.925 1517775.90 505.925<br />

Physical Financial<br />

Area<br />

likely to<br />

be<br />

benefited<br />

1 27/1 Nerigam Ragamathulla khan Stone Wall 1 Ha 6000 1.965 11790.00 1.965<br />

2 27/2 Nerigam Chenna krishnachetty Stone Wall 1 Ha 6000 1.085 6510.00 1.085<br />

3 27/3 Nerigam Usappa Stone Wall 1 Ha 6000 1.035 6210.00 1.035<br />

4 44/2 Nerigam Munirathanam Stone Wall 1 Ha 6000 1.215 7290.00 1.215<br />

5 46/4 Nerigam Appaiya Stone Wall 1 Ha 6000 1.280 7680.00 1.280<br />

6 69 Nerigam Seene gpuddu Stone Wall 1 Ha 6000 0.970 5820.00 0.970<br />

Unit<br />