integrated watershed management programme – v - tawdeva
integrated watershed management programme – v - tawdeva
integrated watershed management programme – v - tawdeva
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Sl.N<br />
o<br />
NERIGAM WATERSHED DETAILED PROJECT REPORT<br />
Format - 19<br />
Status of the Existing Water Bodies in the Watershed<br />
Type of Water<br />
body<br />
No.<br />
PWD<br />
Owned by<br />
Union<br />
Others<br />
Operating<br />
Status<br />
Water storage<br />
Capacity (mcft)<br />
1 Tanks 3 3 1 2 0.9 0.45 11.4 6.7 13<br />
2 Ooranies - - - - - - - - -<br />
- -<br />
3 Village Tanks - - - - - - - - -<br />
- -<br />
4 Farm Ponds - - - - - - - - -<br />
- -<br />
5 Sunkan Pond - - - - - - - - -<br />
- -<br />
6 Check dam - - - - - - - - -<br />
- -<br />
7 Percolation<br />
Pond<br />
- - - - - - - - -<br />
- -<br />
Total 3 3 1 2 0.9 0.45 11.4 6.7 13<br />
KRISHNAGIRI DISTRICT<br />
Source : PRA, Field Survey<br />
Defunct<br />
Originally<br />
designed<br />
Present<br />
Area<br />
designed to<br />
be benefited<br />
(Ha)<br />
Area<br />
actually<br />
benefited<br />
(Ha)<br />
No. of<br />
wells<br />
benefited