28.03.2013 Views

integrated watershed management programme – v - tawdeva

integrated watershed management programme – v - tawdeva

integrated watershed management programme – v - tawdeva

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Sl.No SF No Location<br />

Name of the User<br />

Group<br />

7.Other Water Harvesting Structure<br />

Proposed type of treatment Unit<br />

Physical Financial<br />

Area<br />

likely to<br />

be<br />

benefited<br />

1 89 Nerigam User Group Major Check Dam 1 No 100000 1 100000.00 8.333<br />

2 107 Nerigam User Group Major Check Dam 1 No 100000 1 100000.00 8.333<br />

3 26 Gollapalli User Group Major Check Dam 1 No 100000 1 100000.00 8.333<br />

4 66 Gollapalli User Group Major Check Dam 1 No 100000 2 200000.00 16.667<br />

5 77,61 Nerigam User Group Medium Check Dam 1 No 65000 2 130000.00 10.833<br />

6 80,78 Gollapalli User Group Medium Check Dam 1 No 65000 2 130000.00 10.833<br />

7 17.6 Nerigam User Group Minor Check Dam 1 No 40000 2 80000.00 6.667<br />

8 37,32,33 Gollapalli User Group Minor Check Dam 1 No 40000 3 120000.00 10.000<br />

9 26 Nerigam User Group LBCD 1 No 6000 10 60000.00 5.000<br />

10 90 Gollapalli User Group LBCD 1 No 6000 10 60000.00 5.000<br />

11 26,77 Nerigam User Group Cattle Pond 1 No 30000 2 60000.00 5.000<br />

12 133 Nerigam User Group<br />

Renovation of Existing<br />

Structure<br />

1 No 50000 1 50000.00 4.167<br />

13 54 Gollapalli User Group<br />

Renovation of Existing<br />

Structure<br />

1 No 50000 1 50000.00 4.167<br />

TOTAL 38 1240000.00 103.333<br />

Unit<br />

cost<br />

(Rs.)<br />

Total

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!