28.03.2013 Views

integrated watershed management programme – v - tawdeva

integrated watershed management programme – v - tawdeva

integrated watershed management programme – v - tawdeva

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

7 70/1 Nerigam Chinna ramaiya Stone Wall 1 Ha 6000 0.925 5550.00 0.925<br />

8 70/2,3 Nerigam Ramaiya Stone Wall 1 Ha 6000 1.100 6600.00 1.100<br />

9 99/1 Nerigam Abdulkhan Stone Wall 1 Ha 6000 0.770 4620.00 0.770<br />

10 99/2 Nerigam Mahaub usian Stone Wall 1 Ha 6000 1.680 10080.00 1.680<br />

11 100/1 Nerigam Megalappa Stone Wall 1 Ha 6000 1.590 9540.00 1.590<br />

12 100/2 Nerigam B.Usappa Stone Wall 1 Ha 6000 1.415 8490.00 1.415<br />

13 198/1 Nerigam Munikhan Stone Wall 1 Ha 6000 1.430 8580.00 1.430<br />

14 198/2 Nerigam Bedhappa nadu Stone Wall 1 Ha 6000 0.730 4380.00 0.730<br />

15 198/3 Nerigam Kamala kondappa Stone Wall 1 Ha 6000 0.760 4560.00 0.760<br />

16 198/4 Nerigam Ramaiya Stone Wall 1 Ha 6000 0.480 2880.00 0.480<br />

17 192 Nerigam Vijayakumar Stone Wall 1 Ha 6000 2.445 14670.00 2.445<br />

18 193/1 Nerigam Lakshmiyammal Stone Wall 1 Ha 6000 0.940 5640.00 0.940<br />

Total<br />

21.815 130890.00 21.815

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!