integrated watershed management programme – v - tawdeva
integrated watershed management programme – v - tawdeva
integrated watershed management programme – v - tawdeva
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Sl.No SF No Location Name of the Farmer<br />
Format - 27<br />
Details of Renovated / Proposed Engineering Structures<br />
1.FIELD BUNDING<br />
Proposed type of treatment Unit<br />
Physical Financial<br />
1 1/1C Nerigam Muninaidu Field Bunding 1 Ha 3000 0.625 1875.00 0.625<br />
2 1/2 Nerigam Bodipainaidu Field Bunding 1 Ha 3000 0.755 2265.00 0.755<br />
3 1/3 Nerigam Urlabandappa Field Bunding 1 Ha 3000 0.900 2700.00 0.900<br />
4 1/4 Nerigam Thimmakkal Field Bunding 1 Ha 3000 0.390 1170.00 0.390<br />
5 1/5 Nerigam Chinnabillappa Field Bunding 1 Ha 3000 0.820 2460.00 0.820<br />
6 2/1,3 Nerigam Sonnaballiappa Field Bunding 1 Ha 3000 1.130 3390.00 1.130<br />
7 2/2 Nerigam Muniyappa Field Bunding 1 Ha 3000 1.015 3045.00 1.015<br />
8 3/1 Nerigam Sarojammal Field Bunding 1 Ha 3000 0.635 1905.00 0.635<br />
9 3/2A Nerigam Seenivasagpoudu Field Bunding 1 Ha 3000 0.300 900.00 0.300<br />
10 3/2B Nerigam Chinnappa Field Bunding 1 Ha 3000 1.250 3750.00 1.250<br />
11 4/1 Nerigam Muninanjappa Field Bunding 1 Ha 3000 0.515 1545.00 0.515<br />
12 4/2 Nerigam Muniyappa Field Bunding 1 Ha 3000 0.520 1560.00 0.520<br />
13 4/3 Nerigam Appoje Field Bunding 1 Ha 3000 0.380 1140.00 0.380<br />
Unit<br />
cost<br />
(Rs.)<br />
Total<br />
Area<br />
likely to<br />
be<br />
benefited