28.03.2013 Views

integrated watershed management programme – v - tawdeva

integrated watershed management programme – v - tawdeva

integrated watershed management programme – v - tawdeva

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Sl.No SF No Location Name of the Farmer<br />

Format - 27<br />

Details of Renovated / Proposed Engineering Structures<br />

1.FIELD BUNDING<br />

Proposed type of treatment Unit<br />

Physical Financial<br />

1 1/1C Nerigam Muninaidu Field Bunding 1 Ha 3000 0.625 1875.00 0.625<br />

2 1/2 Nerigam Bodipainaidu Field Bunding 1 Ha 3000 0.755 2265.00 0.755<br />

3 1/3 Nerigam Urlabandappa Field Bunding 1 Ha 3000 0.900 2700.00 0.900<br />

4 1/4 Nerigam Thimmakkal Field Bunding 1 Ha 3000 0.390 1170.00 0.390<br />

5 1/5 Nerigam Chinnabillappa Field Bunding 1 Ha 3000 0.820 2460.00 0.820<br />

6 2/1,3 Nerigam Sonnaballiappa Field Bunding 1 Ha 3000 1.130 3390.00 1.130<br />

7 2/2 Nerigam Muniyappa Field Bunding 1 Ha 3000 1.015 3045.00 1.015<br />

8 3/1 Nerigam Sarojammal Field Bunding 1 Ha 3000 0.635 1905.00 0.635<br />

9 3/2A Nerigam Seenivasagpoudu Field Bunding 1 Ha 3000 0.300 900.00 0.300<br />

10 3/2B Nerigam Chinnappa Field Bunding 1 Ha 3000 1.250 3750.00 1.250<br />

11 4/1 Nerigam Muninanjappa Field Bunding 1 Ha 3000 0.515 1545.00 0.515<br />

12 4/2 Nerigam Muniyappa Field Bunding 1 Ha 3000 0.520 1560.00 0.520<br />

13 4/3 Nerigam Appoje Field Bunding 1 Ha 3000 0.380 1140.00 0.380<br />

Unit<br />

cost<br />

(Rs.)<br />

Total<br />

Area<br />

likely to<br />

be<br />

benefited

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!