28.03.2013 Views

integrated watershed management programme – v - tawdeva

integrated watershed management programme – v - tawdeva

integrated watershed management programme – v - tawdeva

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

NERIGAM WATERSHED DETAILED PROJECT REPORT<br />

Format <strong>–</strong> 17<br />

WELL INVENTORY<br />

(Sample basis <strong>–</strong> One in each area i.e. upper, middle, lower, valley portion and other significant geological formations<br />

<strong>–</strong> at least 5 <strong>–</strong> 10 wells may be covered and the same should be marked on the map)<br />

Total wells in the <strong>watershed</strong> area: 91<br />

S.No Particulars Well No.1 Well No.2 Well No.3 Well No.4 Well No.5<br />

1 Well location (survey No) 11 33 38 57 45<br />

2 Type of use* Agri Agri Agri Agri Agri<br />

3 Year of construction 1983 1979 1986 1992 1969<br />

4 Diameter (in Metres) 5.5x5.5 5.8x5.8 6 m dia 5.5x5.5 6x6<br />

5 Depth of well <strong>–</strong> below ground level (in metres) 12.5 13 13.5 13.5 13<br />

6 Depth of water table from ground level (in m) 11.1 11.9 12.2 12.5 12.1<br />

7 Geological formation<br />

Metamorphic Formation<br />

8 Lifting device (pump, oil engine / other) EM EM EM EM EM<br />

9 HP of pump 5 Hp 5 Hp 5 Hp 5 Hp 5 Hp<br />

10 Hourly discharge CuM 11 10 10 12.00 11<br />

11 Operating hours 2.30 2.00 2.00 2.45 2.45<br />

12 If drained completely <strong>–</strong> recovery time in hours 9 10 10 8 9<br />

13 Daily draft (CuM/ HaM) 0.0032 0.0030 0.0030 0.004 0.0038<br />

14 Operating days per year 98 95 95 110 105<br />

15 Yearly draft (CuM / HaM) 0.315 0.035 0.035 0.425 0.38<br />

16 Average area irrigated (ha) 0.85 0.75 0.75 1.00 0.90<br />

KRISHNAGIRI DISTRICT<br />

Source : Field Survey

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!