28.03.2013 Views

integrated watershed management programme – v - tawdeva

integrated watershed management programme – v - tawdeva

integrated watershed management programme – v - tawdeva

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Sl.N<br />

o.<br />

SF No.<br />

Name of the<br />

Farmer Area<br />

proposed<br />

to be<br />

covered<br />

(Ha.)<br />

Source of<br />

irrigation<br />

*<br />

Type of<br />

work<br />

Name of<br />

Plants<br />

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16<br />

ENRICHED FARMYAD MANURE<br />

1 16/1 Narayanagoudu 1.045 Rainfed EFYM 1500 1 1567.50 1567.50<br />

2 16/2A Krishnagoudu 0.570 Rainfed EFYM 1500 1 855.00 855.00<br />

3 16/2B Mallikaarajunar 0.515 Rainfed EFYM 1500 1 772.50 772.50<br />

4 16/2C Ramachandran 0.415 Rainfed EFYM 1500 1 622.50 622.50<br />

5 16/2D Lokesah 0.365 Rainfed EFYM 1500 1 547.50 547.50<br />

6 16/2E Prasannakumar 0.415 Rainfed EFYM 1500 1 622.50 622.50<br />

7 20 Munisamychetty 0.820 Rainfed EFYM 1500 1 1230.00 1230.00<br />

8 19/1 Munisamychetty 0.980 Rainfed EFYM 1500 1 1470.00 1470.00<br />

9 19/3 Ramakrishnappa 0.785 Rainfed EFYM 1500 1 1177.50 1177.50<br />

10 21/2A Pichappa 0.635 Rainfed EFYM 1500 1 952.50 952.50<br />

11 21/2C Raman 1.080 Rainfed EFYM 1500 1 1620.00 1620.00<br />

Unit cost<br />

Number<br />

of<br />

Beneficia<br />

ry<br />

Total<br />

cost<br />

Pitting<br />

charges<br />

Initial<br />

watering<br />

Maintenance<br />

Gap<br />

fillin<br />

g<br />

Wat<br />

erin<br />

g<br />

Other<br />

charges<br />

Grand<br />

Total<br />

(10+11+1<br />

2+13+14+<br />

15)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!