integrated watershed management programme – v - tawdeva
integrated watershed management programme – v - tawdeva
integrated watershed management programme – v - tawdeva
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Sl.N<br />
o.<br />
SF No.<br />
Name of the<br />
Farmer Area<br />
proposed<br />
to be<br />
covered<br />
(Ha.)<br />
Source of<br />
irrigation<br />
*<br />
Type of<br />
work<br />
Name of<br />
Plants<br />
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16<br />
ENRICHED FARMYAD MANURE<br />
1 16/1 Narayanagoudu 1.045 Rainfed EFYM 1500 1 1567.50 1567.50<br />
2 16/2A Krishnagoudu 0.570 Rainfed EFYM 1500 1 855.00 855.00<br />
3 16/2B Mallikaarajunar 0.515 Rainfed EFYM 1500 1 772.50 772.50<br />
4 16/2C Ramachandran 0.415 Rainfed EFYM 1500 1 622.50 622.50<br />
5 16/2D Lokesah 0.365 Rainfed EFYM 1500 1 547.50 547.50<br />
6 16/2E Prasannakumar 0.415 Rainfed EFYM 1500 1 622.50 622.50<br />
7 20 Munisamychetty 0.820 Rainfed EFYM 1500 1 1230.00 1230.00<br />
8 19/1 Munisamychetty 0.980 Rainfed EFYM 1500 1 1470.00 1470.00<br />
9 19/3 Ramakrishnappa 0.785 Rainfed EFYM 1500 1 1177.50 1177.50<br />
10 21/2A Pichappa 0.635 Rainfed EFYM 1500 1 952.50 952.50<br />
11 21/2C Raman 1.080 Rainfed EFYM 1500 1 1620.00 1620.00<br />
Unit cost<br />
Number<br />
of<br />
Beneficia<br />
ry<br />
Total<br />
cost<br />
Pitting<br />
charges<br />
Initial<br />
watering<br />
Maintenance<br />
Gap<br />
fillin<br />
g<br />
Wat<br />
erin<br />
g<br />
Other<br />
charges<br />
Grand<br />
Total<br />
(10+11+1<br />
2+13+14+<br />
15)