EXCEL CROP CARE LIMITED C O N T E N T S - BSE
EXCEL CROP CARE LIMITED C O N T E N T S - BSE
EXCEL CROP CARE LIMITED C O N T E N T S - BSE
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
SCHEDULE ‘E’<br />
FIXED ASSETS<br />
Sr. Description of Assets As at<br />
No. 1st April,<br />
2010<br />
<strong>EXCEL</strong> <strong>CROP</strong> <strong>CARE</strong> <strong>LIMITED</strong><br />
SCHEDULES FORMING PART OF THE BALANCE SHEET<br />
SCHEDULE ‘D’<br />
UNSECURED LOANS:<br />
As at 31st<br />
March, 2011<br />
(` in lacs)<br />
As at 31st<br />
March, 2010<br />
(` in lacs)<br />
Short Term Loans from Banks 35,56.51 95,31.82<br />
GROSS BLOCK (AT COST) DEPRECIATION NET BLOCK<br />
Additions<br />
during the<br />
year<br />
Deductions<br />
during the<br />
year<br />
As at<br />
31st March,<br />
2011<br />
39<br />
As at<br />
1st April,<br />
2010<br />
Deductions/<br />
Adjustments<br />
Provided<br />
during the<br />
year<br />
As at<br />
31st March,<br />
2011<br />
As at<br />
31st March,<br />
2011<br />
(` in lacs)<br />
As at<br />
31st March,<br />
2010<br />
I. LAND - FREEHOLD 8,03.75 4.92 — 8,08.67 — — — — 8,08.67 8,03.75<br />
II. LAND LEASEHOLD 0.69 — — 0.69 — — — — 0.69 0.69<br />
III. LEASEHOLD IMPROVEMENTS 1,76.79 6.99 — 1,83.78 14.63 — 36.05 50.68 1,33.10 1,62.16<br />
IV. BUILDINGS 15,18.20 1,71.48 — 16,89.68 2,63.22 — 37.86 3,01.08 13,88.60 12,54.98<br />
V. PLANT AND MACHINERY 125,73.37 11,54.70 1,70.87 135,57.20 50,41.38 1,23.42 8,08.68 57,26.64 78,30.56 75,31.99<br />
VI. ELECTRICAL INSTALLATIONS 3,40.23 0.90 1.46 3,39.67 1,61.94 0.31 14.57 1,76.20 1,63.47 1,78.29<br />
VII. LABORATORY EQUIPMENTS<br />
VIII. FURNITURE, FIXTURES AND<br />
64.17 19.26 0.69 82.74 53.52 0.62 3.11 56.01 26.73 10.65<br />
OFFICE EQUIPMENTS 5,50.93 67.22 30.73 5,87.42 2,71.32 14.51 54.36 3,11.17 2,76.25 2,79.61<br />
IX. VEHICLES 9,96.68 1,93.58 82.29 11,07.97 5,02.66 62.70 1,39.90 5,79.86 5,28.11 4,94.02<br />
X. TECHNICAL BOOKS 10.91 — 8.75 2.16 6.95 5.78 0.55 1.72 0.44 3.96<br />
TOTAL 170,35.72 16,19.05 2,94.79 183,59.98 63,15.62 2,07.34 10,95.08 72,03.36 111,56.62 107,20.10<br />
PREVIOUS YEAR<br />
CAPITAL WORK-IN-PROGRESS<br />
155,52.49 16,38.26 1,55.03 170,35.72 55,31.19 98.48 8,82.91 63,15.62<br />
(Refer Note No. 1 Below) 9,37.11 2,37.45<br />
TOTAL 120,93.73 109,57.55<br />
NOTES:<br />
1. Capital Work-in-Progress includes Advance for Capital Expenditure ` 6,70.66 lacs (Previous Year: ` 2,32.18 lacs).<br />
2. Buildings include cost of shares in a Co-operative Housing Society: ` 0.01 lac (Previous Year : Nil)<br />
3. Expenditure on improvement to the leased property is depreciated over the lease period upto 60 months.<br />
SCHEDULE ‘F’<br />
INTANGIBLE ASSETS<br />
DESCRIPTION OF<br />
INTANGIBLE ASSETS<br />
As at 1st<br />
April,<br />
2010<br />
GROSS AMOUNT AMORTISATION NET AMOUNT<br />
Additions<br />
during the<br />
year<br />
Deductions<br />
during the<br />
year<br />
As at 31st<br />
March,<br />
2011<br />
TOTAL 35,56.51 95,31.82<br />
As at 1st<br />
April,<br />
2010<br />
Deductions/<br />
Adjustments<br />
Provided<br />
during the<br />
year<br />
As at 31st<br />
March,<br />
2011<br />
As at 31st<br />
March,<br />
2011<br />
(` in lacs)<br />
As at 31st<br />
March,<br />
2010<br />
Data Registration<br />
Expenses<br />
Computer Software/<br />
6,75.05 3,60.83 — 10,35.88 6,39.48 — 1,55.85 7,95.33 2,40.55 35.57<br />
Licence Fees 56.45 4.35 — 60.80 14.11 — 15.20 29.31 31.49 42.34<br />
TOTAL 7,31.50 3,65.18 — 10,96.68 6,53.59 — 1,71.05 8,24.64 2,72.04 77.91<br />
Previous Year 6,75.05 56.45 — 7,31.50 5,66.46 — 87.13 6,53.59