<strong>Enquiry</strong> <strong>Specification</strong> <strong>for</strong> <strong>Wagon</strong> <strong>Tippler</strong> <strong>with</strong> <strong>Side</strong> <strong>Arm</strong> <strong>Charger</strong> <strong>and</strong> Associated works<br />

NRO/CON/WT/533<br />

13. Interplant cable route drawings.<br />

14. Layout of cable trays in cable cellars inside the substation & other<br />

electrical premises, cable channels, cable tunnel, overhead cable<br />

structures, cable shafts etc.<br />

15. Cable layout drawings in cable tunnel, cable channels, overhead cable<br />

structure (as applicable), <strong>and</strong> incoming cable route etc.<br />

16. Power & control cable schedules<br />

17.GA drawing <strong>for</strong> erection accessories like cable trays, supporting<br />

structures etc.<br />

18. Installation drawings of all equipment <strong>with</strong> layout of equipment, cables.<br />

19. Illumination layout of all the indoor & outdoor premises. Layouts at each<br />

floor of Electrical/Technological building <strong>with</strong> details <strong>and</strong> numbers &<br />

locations of light fittings, Lighting distribution boards etc. SLDs of<br />

Lighting distribution board.<br />

20. Earthing <strong>and</strong> lightning protection scheme <strong>and</strong> layout of earthing <strong>and</strong><br />

lightning protection network <strong>with</strong> calculations including special<br />

electronics earthing<br />

21. Relay settings <strong>with</strong> calculations <strong>for</strong> total network to ensure proper coordination.<br />

22. Communication cable (Field bus) routing <strong>and</strong> procedure <strong>for</strong> laying of<br />

communication cable.<br />

23. QAP <strong>for</strong> all items covered in this specification<br />

(d) For Reference/Erection purposes (Electrical)<br />

1. Schedule of electrics, <strong>and</strong> their location.<br />

2. HT/LT feeder requirement <strong>with</strong> individual maximum dem<strong>and</strong>.<br />

3. Control circuit diagrams.<br />

4. Static <strong>and</strong> dynamic loading of all major equipment<br />

5. External connection diagram (panel wise <strong>and</strong> scheme wise).<br />

6. Composite drawings showing circuitry of switch-gear remote panels, <strong>and</strong><br />

other items pertaining to complete circuit <strong>for</strong> its proper functioning.<br />

7. Power & regulation schemes <strong>for</strong> AC drives, UPS, soft starter including<br />

FCMA type.<br />

8. Motors & field devices.<br />

9. Speed-torque, current vs. time, thermal <strong>with</strong>st<strong>and</strong>s characteristics <strong>for</strong><br />

motors.<br />

10. List of interfaces between successful Bidder’s equipment <strong>and</strong> Purchaser’s<br />

equipment.<br />

11. Cable termination plans <strong>with</strong> terminal block arrangement <strong>and</strong> markings.<br />

12. Interconnection diagrams.<br />

13. Internal wiring diagrams of equipment.<br />

14. Fire detection systems: layout & cable list.<br />

15. Motor <strong>and</strong> electric consumer list.<br />

16. Consolidated Bill of materials <strong>and</strong> volume of work <strong>for</strong> erection.<br />

17. Procedure <strong>for</strong> testing <strong>and</strong> commissioning of the entire plant, electrical &<br />

automation equipment. This shall also be furnished in soft copy.<br />

18. Erection specification <strong>with</strong> bill of materials of erection materials, earthing<br />

materials, junction box, GI conduits etc. This shall also be furnished in<br />

soft copy.<br />

19. Spare part list <strong>and</strong> drawings.<br />

20. Instruction <strong>for</strong> storage /erection, testing & commissioning.<br />

EPI – New Delhi Volume-2B, Rev.0 Page 30 of 63