<strong>Enquiry</strong> <strong>Specification</strong> <strong>for</strong> <strong>Wagon</strong> <strong>Tippler</strong> <strong>with</strong> <strong>Side</strong> <strong>Arm</strong> <strong>Charger</strong> <strong>and</strong> Associated works NRO/CON/WT/533 MECHANICAL EPI – New Delhi Volume-2B, Rev.0 Page 4 of 63
<strong>Enquiry</strong> <strong>Specification</strong> <strong>for</strong> <strong>Wagon</strong> <strong>Tippler</strong> <strong>with</strong> <strong>Side</strong> <strong>Arm</strong> <strong>Charger</strong> <strong>and</strong> Associated works NRO/CON/WT/533 3.0 Technical <strong>Specification</strong>s of WAGON TIPPLER <strong>with</strong> SIDE ARM CHARGER AND ASSOCIATED WORKS (A) GENERAL This specification is intended to broadly cover design, engineering, manufacturer, shop fabrication, supply, transportation, installation, testing <strong>and</strong> commissioning guarantee per<strong>for</strong>mance testing of the complete <strong>Wagon</strong> <strong>Tippler</strong> & <strong>Side</strong> <strong>Arm</strong> <strong>Charger</strong> as specified hereinafter complete in all respects <strong>and</strong> adequate <strong>for</strong> safe, efficient <strong>and</strong> trouble free operation of the elevator. (B) CODES AND STANDARD The design, manufacture, inspection <strong>and</strong> testing of <strong>Wagon</strong> <strong>Tippler</strong> & <strong>Side</strong> <strong>Arm</strong> <strong>Charger</strong> shall comply <strong>with</strong> all the currently applicable statutes, regulations <strong>and</strong> safety codes in the locality where the equipment is to be installed. The <strong>Wagon</strong> <strong>Tippler</strong> & <strong>Side</strong> <strong>Arm</strong> <strong>Charger</strong> shall con<strong>for</strong>m to the latest edition of st<strong>and</strong>ards <strong>and</strong> codes. Other internationally acceptable st<strong>and</strong>ards/ codes, which ensure equal or higher per<strong>for</strong>mance than those specified, shall also be accepted. Nothing in this specification shall be construed to relieve the contractor of the required statutory responsibility. In case of any conflict in the st<strong>and</strong>ard <strong>and</strong> this specification, the decision of the Engineer shall be final <strong>and</strong> binding. (C) The scope of work of the Bidder includes design, engineering, manufacture, inspection, assembly, shop testing, painting at manufacturer's shop as well as at site after installation, supply at site including dismantling <strong>for</strong> transportation, packing, loading <strong>and</strong> transportation, receipt at site, supervision of installation, testing <strong>and</strong> commissioning of the following items at plant site. (1) One no. <strong>Side</strong> <strong>Arm</strong> <strong>Charger</strong> to pull or push a rake of 59 loaded wagons as per IS:10095 1982, Reaffirmed-2001. The <strong>Side</strong> <strong>Arm</strong> <strong>Charger</strong> shall be complete <strong>with</strong> - Trolley <strong>with</strong> wheels <strong>and</strong> side guide roller, universal coupling arm along <strong>with</strong> hydraulic system <strong>for</strong> luffing. - Travel drive complete <strong>with</strong> hydraulic motor, brakes, <strong>and</strong> hydraulic power pack. - Rails <strong>with</strong> foundation bolts & nuts, racks & pinions. - End stops, Festoon Cable & Trolley <strong>with</strong> heavy duty carriage <strong>and</strong> supporting structures. - Hydraulic <strong>Side</strong> <strong>Arm</strong> <strong>Charger</strong> coupler / decoupler. - Operator's cabin mounted on trolley of <strong>Side</strong> <strong>Arm</strong> <strong>Charger</strong>. - Any other item/ accessory/ fixtures to complete supply of the equipment. EPI – New Delhi Volume-2B, Rev.0 Page 5 of 63