General and Administrative<br />

Costs<br />

Unit Gen & Admin Cost Per<br />

Tonne Milled<br />

Mine<br />

Development<br />

Units Totals 2013 2014 2015 2016 2017 2018 2019<br />

US$ ‘000 99,294 14,788 14,078 14,078 14,116 14,078 14,078 14,078<br />

$/t<br />

processed<br />

1.11 Sustaining Capital Expenditures<br />

7.62 6.85 7.71 7.42 7.59 7.55 8.19 8.26<br />

For the Nzema Gold Mine, the majority of capital costs have already been spent during<br />

construction of the mine. The principal contractor was Lycopodium Limited, the Australian<br />

EPCM contractor, for process plant and related infrastructure construction.<br />

The main projects requiring sustaining capital expenditures in 2013 are as follows:<br />

• Purchase and installation of 6 MW diesel genset from SDMO of France. The contract<br />

sum is US$4M.<br />

• Relocation and development of relocation site at the Adamus Pit is ongoing at a total<br />

cost to completion of US$27 million. FF Construction Ltd and other contractors have<br />

been engaged at the construction site.<br />

• Tailings storage facility lift is underway and has been contracted to Naakyea Plant Pool<br />

Ltd with Knight Piesold providing the technical support.<br />

As the earthmoving is carried out by mining contractor (AMS), no mining capital for mobile fleet<br />

replacements or additions was allocated or required.<br />

Table 1.9 represents the annual CAPEX distribution over the Life-of-Mine period.<br />

Table 1.9: CAPEX and Sustaining Capital, LoM<br />

Units Totals 2013 2014 2015 2016 2017 2018 2019<br />

US$ ‘000 39,322 28,820 4,870 5,633 - - - -<br />

Sustaining Capital US$ ‘000 17,571 3,267 4,228 991 4,315 3,453 1,193 125<br />

Total Capital US$ ‘000 56,893 32,087 9,097 6,624 4,315 3,453 1,193 125<br />

1.12 Environmental and Social Issues, Closure Plan<br />

The Nzema Gold Operations has a corporate commitment towards sustainable development<br />

that focuses on achieving a high standard of environmental, economic and social performance in<br />

its operations.<br />

Nzema maintains compliance with environmental and social regulatory requirements, as stated<br />

in the company social and environmental policy and follows through with the requirements of<br />

the AKOBEN programme as mandated by the Environmental Protection Agency (EPA). The<br />

environmental management of Nzema is defined under the schedule attached to the<br />

24