• Leave disturbed areas in a safe and stable condition<br />
• Minimise the impact of the facilities on surface water drainage patterns and also on<br />
groundwater characteristics<br />
• Minimise the impact of the facilities on contamination in general<br />
• Restore as much of the mining area to a sustainable land-use capability as is practicable<br />
• Minimise or eliminate any post-reclamation environmental impacts<br />
• Provide rehabilitated areas that contribute to the long-term sustainability of the local<br />
economy<br />
• Ensure that potential environmental liabilities associated with the closure of the site are<br />
minimized.<br />
The closure plan considered open pits, partially filled pits, completely backfilled pits and waste<br />
dumps for rehabilitation. The mine closure costs are allocated in the Nzema business plan and<br />
reflected in operational cash flow model.<br />
During 2011 and 2012 the Salman village was relocated 1.5km to the east of the previous site.<br />
Approximately 2,000 residents were moved to the new village which includes 711 structures. A<br />
resettlement due to the mining area of influence at the Adamus pit is currently underway. This<br />
will impact 1,200 to 1,500 residents and involve construction of approximately 540 structures.<br />
1.13 Conclusions<br />
Nzema is a successfully operating gold mine that started commercial production in April 2011<br />
and is projected to continue until 2019 based on currently available mineral reserves.<br />
The exploration database for the Youga project is reliable for the purpose of resource<br />
estimation. The mineral resources and mineral reserves have been updated to December 31,<br />
2012. Adamus (Anwia) provides the majority of the reserves (66%) followed by Salman (15%),<br />
Bokrobo (12%) and the two additional deposits Nfutu (3%) and Aliva (3%). A total of 72.7 million<br />
tonnes will be mined (59.9 million tonnes waste) at an overall strip ratio of 4.6 to 1.<br />
In 2012 the Nzema gravity/CIL processing facilities had a throughput of 2.144 million tonnes at<br />
an average grade of 1.85g/t Au to produce 109,447 ounces. The LOM production schedule has<br />
12.9 million tonnes of ore at an average grade of 1.91g/t Au processed to produce a total of<br />
705,625 ounces.<br />
1.14 Recommendations<br />
Nzema is an operating mine and requires ongoing monitoring of the impacts of changes in the<br />
gold price and the inflationary effects on power, fuels, labour and spare components must be<br />
monitored. Continued sustaining capital expenditures should be completed as described.<br />
Additional metallurgical testwork is required for the fresh mineralization in the Akropon and<br />
Avrebo deposits.<br />
26