The mill expansion is currently in the commissioning phase and is expected to ramp up to 4,000 t/d<br />

during Q2.<br />

Community Relations and Social Responsibility<br />

Endeavour continues to enjoy a good standing in the local communities of Keniaba, Tabakoto and<br />

Sitakily.<br />

Agricultural support saw the continued improvement in production of rice, potatoes, cabbage tomatoes<br />

and onions by local co-ops. A total of 10 new water wells were developed in local villages.<br />

Construction activity included a municipal center and police station completed for the Sitakily region.<br />

Schools were constructed in the villages of Bambou and Mouralia. Tabakoto was provided with a new<br />

steel water tower for water distribution throughout the town.<br />

The Corporation joined with other mines and private funds to contribute to the END Fund, to combat<br />

the seven most common Neglected Tropical Diseases (NDT’s), the funding will provide treatment and<br />

prevention drugs to millions of Malians affected by NDT’s.<br />

The most significant project undertaken was the construction of the new Djambaye village and the<br />

subsequent relocation of 275 people. The relocation allowed for the development of the Djambaye II<br />

open pit. The project included a number of technical and social economic studies. Design and<br />

construction supervision was with the full cooperation of the Keniaba Urbanization Department. The<br />

project was completed successfully in only four months. Local contractors were used and all unskilled<br />

labor came from the village itself. Including the 60 houses, the project also provided a school, mosque,<br />

youth clubhouse, football field, three water wells and a market.<br />

Agbaou Gold Project, Côte d’Ivoire, West Africa<br />

The following technical disclosure relating to the Agbaou Gold Project is a reproduction of the summary<br />

from the “Agbaou Gold Mine, Côte d’Ivoire, NI 43-101 Technical Report” dated effective May 25, 2012<br />

(“Agbaou Report”) prepared by SRK Consulting South Africa (Pty) Ltd., SENET, Knight Piésold (Pty) Ltd.<br />

Readers should consult the Agbaou Report to obtain further particulars regarding the Agbaou Gold<br />

Project. The Agbaou Report is incorporated by reference in its entirety herein and is available for review<br />

electronically on SEDAR at www.sedar.com under the Corporation’s profile.<br />

1.0 SUMMARY<br />

1.1 INTRODUCTION<br />

Endeavour Mining (<strong>ENDEAVOUR</strong>) commissioned the following entities to review the following<br />

aspects and optimize the previous feasibility study conducted in September 2009:<br />

SRK Consulting (South Africa) – Mineral Resource, Mineral Reserve and Mining;<br />

SENET (South Africa) – Process Plant, Infrastructure, Economic Evaluation, and overall<br />

study management;<br />

Knight Piésold (South Africa) – Tailings Management Facility and Water Storage Dam;<br />