Wateranga Project Preliminary Information<br />
Queensl<strong>and</strong> Industrial Minerals Ltd<br />
Table 6 Schedule Of Disturbance And Rehabilitation (Stage 1 <strong>and</strong> 2: over a 5 year period)<br />
DESCRIPTION<br />
Prior to commencement<br />
<strong>of</strong> this plan (Actual)<br />
Year 1 *<br />
2004/2005<br />
Year 2*/**<br />
2005/2006<br />
Year 3**<br />
2006/2007<br />
Year 4**<br />
2007/2008<br />
Year **<br />
2008/2009<br />
Mine excavation (pit)<br />
To be disturbed:<br />
72 ha<br />
To be disturbed:<br />
10 ha<br />
To be disturbed:<br />
20 ha<br />
To be disturbed:<br />
30 ha<br />
To be disturbed:<br />
30 ha<br />
Ore stockpile<br />
To be disturbed:<br />
Approx. 60 ha<br />
To be disturbed:<br />
50 ha<br />
To be disturbed:<br />
25 ha<br />
To be disturbed:<br />
15 ha<br />
To be disturbed:<br />
15 ha<br />
Topsoil/Overburden stockpiles 2.0 ha 2.0 ha 2.0 ha 2.0 ha 2.0 ha<br />
Waste stockpiles Refer Assumptions below Refer Assumptions below<br />
To be disturbed:<br />
5 ha<br />
To be disturbed:<br />
5 ha<br />
To be disturbed:<br />
10 ha<br />
Rehabilitation Area (previous year<br />
To be rehabilitated To be rehabilitated To be rehabilitated To be rehabilitated<br />
disturbed)<br />
50 ha<br />
30 ha<br />
30 ha<br />
30 ha<br />
Water supply dams 2.5 ha 2.5 ha 2.5 ha 2.5 ha 2.5 ha<br />
Roads/tracks 5.0 ha 5.0 ha 5.0 ha 5.0 ha 5.0 ha<br />
Plant area<br />
Workshop area (refer to plant)<br />
Fuel, oil & chemical storage/Camp (refer<br />
to plant)<br />
2.0 ha 2.0 ha 2.0 ha 2.0 ha 2.0 ha<br />
Settlement Pond/ stormwater dam<br />
Contaminated l<strong>and</strong><br />
2.0 ha 2.0 ha 2.0 ha 2.0 ha 2.0 ha<br />
Reject stockpile/ tailing dam 40 ha 40 ha 40 ha 40 ha 40 ha<br />
Ore (product stockpile area)/concentrate<br />
Rehabilitation processes complete<br />
0.5 ha 0.5 ha 0.5 ha 0.5 ha 0.5 ha<br />
First year care & maintenance completed 25 ha (ore stockpile)<br />
10 ha (ore stockpile)<br />
+ 20 ha (pit))<br />
30 ha (Pit) 30 ha (Pit)<br />
2nd year care & maintenance completed<br />
Reach final l<strong>and</strong> use:<br />
72 ha<br />
25 ha (ore stockpile) 30 ha (Pit) 30 ha (Pit)<br />
TOTAL DISTURBANCE 186 ha 114 ha 104 ha 104 ha 109 ha<br />
Successfully Rehabilitated 25 ha 50 ha 50 ha<br />
Notes:<br />
• Year 1 disturbance ~ 186 ha. i.e initial mine excavation, ore stockpile, tailings dam, etc.<br />
• Year 2 disturbance ~ 114 ha. i.e 166 ha + 10 ha (pre year 3 mine excavation) -72 ha (this l<strong>and</strong> will reach its natural l<strong>and</strong> use after flooding.<br />
• Year 3 disturbance ~ 104 ha. i.e 114 ha + 20 ha (year 3 mine excavation) – 25 ha (rehabilitation <strong>of</strong> half ore stockpile)<br />