Wateranga Project Initial Advice Statement<br />

Queensl<strong>and</strong> Industrial Minerals Ltd<br />

Parameter Description <strong>of</strong> values Potential Impacts Proposed Control Strategies<br />

L<strong>and</strong> No significant flora or fauna species <strong>and</strong>/or<br />

plant associates identified within the project<br />

area<br />

Altered l<strong>and</strong>scape surfaces attributed to<br />

farming<br />

Minimal shrub development<br />

Grassl<strong>and</strong> <strong>and</strong> scattered eucalyptus with<br />

small woodl<strong>and</strong> areas<br />

Located on the opposite side <strong>of</strong> the Kalliwa<br />

Creek:<br />

A Category C ESA - Goodnight Scrub<br />

Resources Reserve 300m east <strong>of</strong> the<br />

eastern boundary <strong>of</strong> Central MLA. A<br />

significant portion <strong>of</strong> this ESA will be<br />

flooded by the dam<br />

Category B ESA – Endangered Regional<br />

Ecosystem 1 km east <strong>of</strong> the eastern<br />

boundary <strong>of</strong> Central MLA<br />

Category A ESA – Goodnight Scrub<br />

National Park 700 m east <strong>of</strong> the eastern<br />

boundary <strong>of</strong> Central MLA<br />

Waste Small volume <strong>of</strong> waste generation by<br />

Biggenden township<br />

Burnett Shire Council l<strong>and</strong>fill capable <strong>of</strong><br />

accepting general <strong>and</strong> construction wastes,<br />

Stage 1 haul road traffic – 100-150 trucks per<br />

day<br />

Stage 2 haul road traffic – 75-100 trucks per day<br />

Emissions from processing plant<br />

Operating hours to vary between 7am-6pm, 6<br />

days per week, to 24 hrs per day, 6 days per<br />

week<br />

Clearing <strong>of</strong> vegetation<br />

Alteration <strong>of</strong> l<strong>and</strong>forms<br />

Material <strong>and</strong> waste storage<br />

Alteration <strong>of</strong> drainage<br />

Temporary displacement <strong>of</strong> existing l<strong>and</strong>use<br />

ADVERSE IMPACTS<br />

Potential adverse impacts to existing l<strong>and</strong> values may<br />

occur as a result <strong>of</strong>:<br />

L<strong>and</strong> suitability changes.<br />

L<strong>and</strong> use changes.<br />

L<strong>and</strong> contamination.<br />

L<strong>and</strong> instability.<br />

BENEFICIAL IMPACTS<br />

Improved l<strong>and</strong> capability through improved<br />

vegetation rooting medium <strong>and</strong> post mine<br />

vegetation species cover.<br />

Increased water storage capacity <strong>of</strong> Burnett river<br />

dam by up to 5,000,000m 3<br />

No hazardous chemicals or wastes indicates low<br />

impact on general <strong>and</strong> regulated wastes<br />

Potential contamination arising from accidental<br />

spillage or leakage <strong>of</strong> petroleum products,<br />

Perform excavation activities only during<br />

daylight hours<br />

Maintain a complaints register<br />

Determine appropriate l<strong>and</strong>form design.<br />

L<strong>and</strong>form design will emulate natural slope<br />

<strong>and</strong> drainage systems characteristics in the<br />

project area. Design will include natural <strong>and</strong><br />

engineered structures to minimise erosion <strong>and</strong><br />

stabilise final l<strong>and</strong>forms<br />

Re-use stripped topsoil immediately on<br />

previous excavation cell or temporarily<br />

stockpile in windrows<br />

Rehabilitate <strong>and</strong> revegetate disturbed areas to<br />

self-sustaining/stable l<strong>and</strong>forms as identified<br />

in the post mine l<strong>and</strong>use<br />

Re-vegetate disturbed areas with appropriate<br />

species selected through consultation with<br />

EPA <strong>and</strong> l<strong>and</strong>holder<br />

Develop <strong>and</strong> maintain a Waste Management<br />

Plan<br />

Develop a complaints register – record <strong>and</strong><br />

act upon all complaints<br />

30